Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

DM PLANT READYNESS OF FOLLOWING DRIVES

SR.NO FROM ELE/MECH Trial Taken Date


Description Qty. KW (Each) Pump Motor Electrical Cabling Observation
1 Boiler Fill Pump 2 75 1/9/2009 25/08/09 Ok Commissioned
2 CST make up pump 3 9.3 Pending 18/12/09 Ok
3 DM Feed Pump 2 18.5 Pending Pending Pending
4 DG water Transfer Pump 2 22 Pending Pending Ok
5 DG Blower 2 1.5 Pending Pending Ok
6 MB Blower 2 5.5 Pending Pending Ok
7 Regeneration Pump 2 7.5 Pending 19/12/09 Ok
8 UF Back Wash Pump 2 7.5 Pending Pending Ok Both motor under maintenance
9 UF Feed Pump 2 7.5 Pending 19/12/09 Ok
10 CIP Pump 1 7.5 Pending Pending Ok
11 N-Pit transfer Pump 2 18.5 Pending Pending Ok
12 Caustic Unloading Pump 2 2.2 17/12/09 16/12/09 Ok Commissioned
13 Acid Unloading Pump 2 2.2 17/12/09 16/12/09 Ok Commissioned
14 Alum dosing pump 2 1.1 Pending Pending Pending
15 Lime dosing pump 2 0.37 Pending Pending Pending Motor not installed
16 Poly dosing pump 2 1.1 Pending Pending Pending
17 Agitator for FMT 1 5.5 Pending Pending Pending
18 Agitator for HRSCC 1 11 Pending Pending Pending
19 Agitator for Alum Tank 2 1.5 Pending Pending Pending
20 Agitator for lime tank 2 1.5 Pending Pending Pending
21 Agitator Poly dosing pump 2 Pending Pending Pending Tank not installed
22 Agitator of CMT for SBA 1 0.37 Pending Pending Pending
23 Agitator of CMT(Caustic metric Tank) for MB 1 0.37 Pending Pending Pending
24 Agitator of CDT ( Caustic dosing Tank)for N-pit
1 0.37 Pending Pending Pending
25 Motor for Rack drive(Scrapper) 2 2.2 Pending Pending Pending

You might also like