Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MATERIAL REQUISITION

LOCATION DELIVERY ADDRESS DATE Off REQUEST REQUISTION NO.


28-07-2018 AGBNL-MGNT-ELECT-REQ-001
Full Speci
ffication/Infformation ESTIMATED
S/N MAKE/MANUffACTURER PART NO. DESCRIPTION MATERIALS USED ON QTY REQUIRED RATE COST REMARKS
1 DNYER IE-SS-K2 PRESSURE SWITCH, 1200 PSI ROTARY TABLE 4
2 ALRE-IT AIR SWITCH, MAX P = 5kpa, 12/250V DRAWWORKS 2
3 FLUKE CLAMP METER OFFICE & W/SHOP 1
4 FLUKE POWER TESTER OFFICE & W/SHOP 3
5 SMALL FLAT SCREW DRIVER, 3X5mm² OFFICE & W/SHOP 2
6 PAIR OF CUTTER 2
7 HYDRAULIC CABLE LOG CRIMPER 1
8 CABLE LOG (1mm to 10mm SIZES) 20 Each
9 FLUKE INFRA-RED THERMOMETER TOP DRIVE 1
10 TOOL BOX, MEDIUM SIZE 3
12 ELECTRONIC CLEANER (CRC) 10
13 WD-40 PENETRATING SPRAY 10
14 PRECISION TOOLS 2
15 GAS CHARGER HOSE 2

16 FREON GAS R22 GAS, R22,FRON,FOR AIR CONDITIONER RIG USE 4


17 EMERSON N/A LIGHT, FLOOD LIGHT, LED TYPE CAMP/RIG SITE 8
18 N/A N/A CABLE, 1.5mm² X 3 RIG USE 2ROLLS
CHARGER, BATTERY CHARGER AND
19 N/A N/A BOOSTER WORKSHOP 1
20 N/A N/A TESTER,BATTERY TESTER WORKSHOP 1

You might also like