NATIONAL HIGH WHAY AUTHORITY

MUSLIM BAGH QILA – SAIFULLAH ROAD PROJECT (ICB-3A) (N-50)


N-50

CONSULTANT LOS ANGLES ABRASHION CONTRACTOR


MIN CONSULTANT INTERNATIONAL LTD AASHTO-176 LIMAK JV ZKB

Location 134+200-----134+400

Matrial SUB BASE

No of cycle 500 No of Ball 11 Lab No

Pasing of sieve Retained seive weight grams weight grams


size size

1/1/2" 1" 1250 1250

1" 3/4" 1250 1250

3/4" 1/2" 1250 1250

1/2" 3/8" 1250 1250

Test No 1 2

Imitial weight kgs 5000 5000


wt retained After Test on sieve 12
ASTM seive(kgs) 3900 3880
% of wear by weight passing
No 12 ASTM sieve 22 22.4
AVG 22.2
specifaction limit

CONTRACTOR CONSULTANT

LAB TECH LAB TECH

ME ME