Contents page
The boiler VIADRUS U 22 (LP) is not intended for the Czech market.
3
Tab. №. 3 Heat technical parameters of the boiler at WOOD burning (A)
humidity 15 - 25 % heating value: 12 - 15 MJ. kg-1
Section number 4 5 6 7 8 9 10
Rated power kW 20 25 30 35 40 45 49
Efficiency % 75
Orientation fuel consumption kg.h-1 6,4 8,0 9,59 11,19 12,79 14,39 15,67
Heating value MJ. kg-1 15,01
Product of consumption
°C max. 320
temperature
Energy efficiency class B B A A+ A B A
Energy efficiency index 89 92 95 98 94 89 92
Season energy efficiency % 63,6 65,6 67,6 69,7 66,6 63,5 65,5
300
250
Pa
200
150
100
50
0
15 20 25 30 35 40 45 50 55 60
Power in kW
3 Description
3.1 Construction of the boiler
The main part of the boiler is the cast iron section boiler drum made of grey cast iron according to ČSN 42 2415 or ČSN 42 2420.
Pressure parts of the boiler correspond to the demands on solidity according to CSN 07 0240, CSN 07 0245.
The boiler drum consists of sections with the help of pressured boiler nipples and is secured with boiler screws. The sections create burning and
ash space, water space and a convective part. Heat water input and output are situated at the back part of the boiler.
The back section of the boiler has a smoky chimney – pot and a heat water flange in the upper part, and a returnable water flange with a socket
for impregnating and clearing plug. Stoker and ash door and a firebox door under them are fixed to the front section.
The whole boiler drum is isolated with a stifling, mineral isolation that reduces losses by sharing heat into the surroundings. The steel jacket is
fitted in colour with a quality comaxite paint.
5
Section number 4 5 6 7 8 9 10
A [mm] 550 645 740 835 930 835 930
Fuel placing:
- it is disallowed to store fuel behind the boiler or to unload it
beside the boiler in the distance smaller than 400 mm;
- it is disallowed to store fuel between two boilers in a boiler room;
- the producer recommends to keep distance of minimum
1000 mm between the boiler and fuel or to place the fuel to a
another room than that where the boiler is installed.
7
5.2 Assembly techniques
Section number 4 5 6 7 8 9 10
L 764 860 956 1052 1148 1244 1340
L1 778 874 970 1066 1162 1258 1354
Every heat source in an open heat system must be connected with an open expansion tank positioned at the highest point of the heat system.
The expansion tanks must be rated in the way that they can contain the changes in water volume resulting from heating and cooling.
The open expansion tanks must be equipped with non-closable bleeder and a overflow pipes. The overflow pipe must be designed in the way
that it safely drains off the maximum flow volume entering the system. This can be achieved by rating the overflow pipes by one DN higher than
that of the filling piping. The expansion tanks and their connecting pipes must be designed and positioned in the way that freezing is reliably
inhibited.
1 Heat source
2 Expansion tank
3 Safety piping
4 Expansion piping
5 Overflow piping
6 Filling piping
7 Water level limiter
8 Reverse piping
8
5.2.1 Boiler drum installation
1. Put the boiler drum on an embedding.
2. Put a sealing φ 90 x 60 x 3 on the upper flange part of the back section and fix the flange DN 50.
3. Put a sealing φ 90 x 60 x 3 on the bottom flange part of the back section and fix the flange DN 50.
4. Screw the well of thermostat into the hole in the top part of the rear section.
Fig. №. 8
5. To put the stove – pipe to the smoky chimney - pot and penetrate it into the chimney hole.
6. To screw the draught controller to the hole in the upper part of the front section.
7. Hole with a Js 6/4“ thread in the front section to blind with Js 6/4“ closure. Insert the sealing φ 60 x 48 x 2 under the plug.
1. Sealing φ 90 x 60 x 3
2. Heating water flange
3. Washer10,5
4. Nut M10
5. Sealing φ 90 x 60 x 3
6. Return water flange
7. Washer 10,5
8. Nut M10
9
5.2.2 Jacket assembly
5.2.2.1 Mounting of the side part of the jacket and the rear part of the jacket
1. Remove the jackets from the cardboard cover.
2. Put the consoles 1 (1) and 2 (4) on the thread of the right upper anchor screw and screw them by means of two nuts M10 (6) and two
washers 10,5 (5).
3. Put the consoles 1 (1) and 2 (4) on the thread of the left upper anchor screw and screw them by means of two nuts M10 (6) and two
washers 10,5 (5).
1. Console 1 assembly
2. Washer 10,5
3. Nut M10
4. Console 2 assembly
5. Washer 10,5
6. Nut M10
4. Mount two connecting plugs (2) on the right side part of the jacket (1) and then insert the insulation– see Fig. №. 11. Put the jacket on the
lower anchor bolts and connect upper part with consoles 1 and 2 by means of two screws M5 x12 plus two washers 6,4.
Fig. №. 11 Right side part of the jacket Fig. №. 12 Left side part of the jacket
5. Mount two connecting plugs (5), into the left side part of the jacket (1), insert the bushings (2, 3), then insert the draw bar of the smoke flap
control (4) and the insulation – see Fig. №. 12. Put the jacket on the lower anchor bolts and connect the upper part with consoles 1 and 2
by means of two screws M5 x12 and two washers 6,4.
6. Mount the insulation of the rear part of the jacket (9 – Fig. №. 15) and screw to the side parts of the jacket by means of screws ST 4,2 x 9,5
(10 – Fig. №. 15).
10
5.2.2.2 Mounting of the upper part of the jacket and control box
1. Insert the bushing (3) to the lower part of the control box (2).
2. Insert the thermomanometer and slip the capillaries through the bushing in the lower part of the control box. Insert the thermometer
sensors into the thermometer well and screw the manometer sensor into the manometer well (Fig. №. 8).
3. By means of 4 pcs screws M5 x 12 (5), 4 pcs serrated washers 5,3 screw the lower part of the control box to the upper part of the jacket.
4. Put a holder for cleaning tools on the side part of the jacket (11 - Fig. №. 15).
5. Insert the insulation into the upper part of the jacket and put the whole assembly on the boiler.
6. Put and screw the upper part of the control box (5) by means of 4 pcs screws ST 4,2 x 9,5 (5) (see Fig. №. 13)
7. Complete the smoke flap control according to chap. №. 5.2.3.
Fig. №. 13 Mounting of the control box Fig. №. 14 Upper part of the jacket
11
5.2.3 Mounting of the draw bar of smoke flap control
1. Complete the smoke flap control according to Fig. №. 1.
2. Fasten the smoke flap control draw bar (2) to the smoke flap (1) by means of lock 2,5 x 32 (3).
3. Screw the plastic ball M10 (4) to the front part of the draw bar
4. Stick the label of smoke flap control (8).
12
1 Ash door 11 Washer 6,4
2 Latch 12 Screw M6 x 10
3 Pin 8 x 40 13 Washer 8,4
4 Cover plate 1 14 Screw M8 x 16
5 Door pin 15 Latch support
6 Washer 8,4 16 Screw M8 x 10
7 Screw M8 x 16 17 Cover plate 2
8 Washer 6,4 18 Washer 8,4
9 Screw M6 x 10 19 Screw M8 x 16
10 Shel stiffener
13
5.2.7 Filling of the heat system with water
Water for filling of the boiler and the heat system must be pure and colourless, without suspended substances, oil and chemically aggressive
substances. Its hardness must correspond to ČSN 07 7401 and in case it does not correspond it is necessary the water to be adjusted. Even
multiplying heating of the water with higher hardness does not prevent from excluding of soils on the boiler drum walls. The precipitation of 1
mm of limestone reduces in the given place the heat transfer from metal to water by 10 %.
Heat systems with an open expansive tank allow direct contact of the heat water with atmosphere. In the heat period the expansive water in the
tank absorbs oxygen that increases the rust effects and at the same time a considerable vaporization of water occurs. Only water adjusted to
values according to ČSN 07 7401 can be used for fill – up. The heat system is needed to be rinsed so as all impurities have been washed out.
During heat period it is necessary to keep consistent water volume in the heat system. While filling – up of the heat system with water it is
necessary to prevent the air from leeching onto the system. The water from boiler and heat system must never be impregnated or taken out for
use except for cases necessarily needed such as repairs, etc. By draining the water and filling with new one the risk of rust and scale creation is
increased. If it is needed to fill water into the heat system we fill it only to a cooled down boiler to prevent section cracking. After filling
of the boiler and heat system checking of tightness of all joints is needed.
The finishing of assembly and the heat test performance must be recorded in the warranty card.
Incorrect operation and improper combustion of fuel leads to damage to the product.
During the first ignition of the cold boiler, water condenses therein and then flows down its inner walls. This condensation of the
boiler body ends when the boiler reaches operating temperature.
During the operation of the boiler at the temperature lower than 60°C, condensing of water on the boiler body or the so called low
temperature corrosion can take, which shortens the life of the boiler exchanger. Therefore we recommend to operate the boiler at
60°C and higher.
WOOD
Guarantee of clean and good combustion is to use only dry and wood in the natural state.
It is necessary to keep the wood max. humidity 20%. If the humidity is higher than 20%, output of the boiler decreases. Combustion of
the damp wood releases water which condenses on the walls of the boiler and chimney body, this leads to an increased formation of
tar and water vapor, which reduces the life of the heat exchanger. Furthermore, improper combustion causes corrosion of cast iron
called "Metal dusting", which leads to carbon diffusion into the material, and thus
disintegration of the material to a powder (dust). This process is gradual and long-term. Flue gas stream with solid particles then
causes abrasion or erosion of material from the surface, thereby gradually thinning the wall thickness of the elements, and this can
cause perforation of the boiler body.
Fuel must be stored in a dry place.
For heating, do not use plastics, household waste, chemically treated wood residues, waste paper, wood chips, brushwood, garbage
from boards pressed from the bark or chipboards.
▶ Follow the instructions for operating the boiler.
▶ When operating the boiler follow the recommended operating temperature.
▶ Operate the boiler with an approved fuel.
Cleaning of the grate is performed so as the hot fuel would not get through to the ashtray.
14
Other sorts of wood such as wood clips, wood shavings, sawdust, granules or coal – cakes can be used as additional fuel. In case of heating
with smaller clogs (wood clips, wood shavings, sawdust, granules) it is necessary to put logs in the bottom part of the burning chamber so as the
fuel would not get through to the ashtray. It is possible to reach smoother burning by further interlaying of the fuel.
These sorts of fuel must have heating power in the range of 12 to 15 MJ.kg-1 and humidity to 20 % to prevent from reducing of the mentioned
boiler power.
COAL
In case of sufficient chimney draught (0,15 to 0,25 mbar), also free-burning coal with the granularity of 30 – 50 mm (so called "nut 1") and the
granularity of 50 – 80 mm (so called "cobbles") may be combusted.
7.1 Heating up
1. Check the water volume in the heat system on the thermomanometer.
2. Open the closing armatures between the boiler and the heat system.
3. Clean out the grate, ashtray, smoky channels and boiler walls.
4. Spread out the kindling through the ash door with the stoker – hole on a cleaned grate along its entire depth.
5. Set the smoky flap in the chimney – pot to position – open and close the stoker door.
6. Set the kindling afire through open ash door and stoker door.
7. Close the stoker hole and ash door and fully open the stifling
8. Thinner layout of the basic fuel to be put up on the burning wood.
9. After its good burning up more fuel to be put up to the bottom part of the stoker hole, the fuel to be stacked to a uniform layout along its
entire boiler depth.
10. As soon as the fuel grades to a dark red flame the air rose of the secondary air input on the stoker hole to be opened with an instrument.
11. After flames become yellow the air rose of the secondary air input to be closed.
The manufacturer recommends to heat by combustion from above. This method is more difficult, but more effective. Coal fired from above heats
the below situated fuel, and its gasification proceeds. Incurred flammable gases will burn off, and as a result the heat arises, which influences
increase of effectiveness. Flame is decreased during combustion unless only cocked coal remains, which combustion will ensure several-hours
operation of the boiler. This method of combustion increases constant heat-ability, decreases consumption of fuel, and mainly decreases
emissions of pollutants into the atmosphere.
1. Pour coal to the empty fire-grate of the boiler approximately to the half-high of the heating chamber.
2. Put rough pieces of wood to the coal to the high about 5 cm so that the coal is fully covered. Put to the middle on it one more layer of
narrower pieces of wood (Ø 1 cm)
3. Further place a kindling on the wood (fine chippings, straw, paper).
4. Close the ash-pan door. Lightly open the throttle valves by means of the throttle screw approximately on 1 cm.
5. Open the air rosette on the stocking door.
6. Fire the kindling and close the stocking door.
7. If the boiler is equipped with a draught regulator, set temperature to 60 °C.
8. When the kindling begins to burn, you can let the boiler spontaneously burn. However, while first several burning-up, we recommend you
to stay near the boiler, unless you are sure that the boiler is really burning. In case that the boiler stops to burn, it is necessary to open
lightly the throttle valve.
9. During first 30 min. you can see smoke from the chimney, but it will be in smaller quantity than during typical burning. Coal will burn slower
and with less intensiveness; temperature will increase slower – but it is a normal phenomenon. As soon as a burning layer arises, white
smoke begins to decrease.
10. As soon as the fuel passes to dark-red glow, it is necessary to close the throttle valve by about 1-2 mm and close the rosette of the
stocking door.
11. From this time you can let the boiler burn. It is not necessary to go to the boiler room; we don’t recommend poking the fire-grate, the
whole fuel will burn off.
Fig. №. 19
Although burning from above is not cyclical, there is a method how to reach it. One from the possibilities is a repeated heat-up with using of
remnants of the glowing fuel from the previous burning. It is far simpler method; however we have to proceed very carefully. Glowing fuel
releases CO, that’s why it is necessary to store it in the ash-pan for the period of repeated filling of the boiler by fuel. It is necessary to observe
personal safety and use protective equipment.
1. Estimate a correct moment, when the boiler begins to burn out, but there are about 2 shovels of glowing carbon pieces on the fire-grate.
Even if there are only few glowing carbon pieces, it is far simpler to burn up the warmed-up boiler.
2. Shove ash by proving tools. In case that there is only little ash, leave it on the fire-grate.
3. Pick carbon pieces from the fire-grate and put them into the ash-pan.
4. Add new fuel to the combustion chamber, put wood and kindling overhead.
5. Take out glowing carbon pieces from the ash-pan and pour above new fuel. If you carry out steps 3 and 4 quickly enough, there wouldn’t
be necessary to burn-up the boiler again. The fuel will start to burn from carbon pieces.
15
The frequency of stocking depends on the weather, the boiler output and the fuel heating power. Provided the boiler output is correctly rated for
the sizes of the heated premises, then necessity of heating-up at temperature of -20 °C shouldn’t be higher than twice a day at the full stocking.
During first heats-up from above, we recommend to use less quantity of fuel in order to avoid overheating of the boiler in case of any problems.
Afterwards you can increase fuel quantity up to the bottom edge of the stocking door.
Fuel quantity has to be fitted to actual needs. For example, if at temperature about 0 °C, you stocked the boiler by fuel on 1/3, and the time of
burning was 6 hours, but you needed 12 h, it is necessary to stock the boiler on 2/3, and in the same way if the surrounding temperature begins
to decrease.
The best effect of burning can be reached if you let the whole stock burn-off without additional stocking. However, it is not easy to estimate
needed quantity of the fuel according to actual atmospheric conditions, and small quantity of coal could be additionally stocked.
7.2 Operation
1. After reaching the heat water temperature the burning air input to be adjusted. The boiler power in rough limits is regulated with a chimney
draught change with a help of the smoky flap in the chimney – pot. Smooth power regulation is performed by a stifling by which the air
output under the grate is regulated, either manually or with a help of draught controller. The draught controller to be adjusted so as the
stifling in the ash door is almost closed at the time when the heat water required temperature is reached.
2. According to heat needs and burning intensity the boiler is needed to be supplied with fuel during the operation. Feeding the fire so as the
fuel layout was equally high along the entire boiler depth.
3. When using the coal it is necessary the air rose of the secondary air input in the stoker hole to be partly opened for the whole time of the
build – up of gases and flames out of freshly fed fuel (the air rose of the secondary air input with regard to the surface temperature is
necessary to be controlled with an instrument.
4. At change over to night still operation the grate to be cleaned out, the freshly fuel to be let well burnt up and then the boiler power to be
suppressed by throttling of the chimney draught with chimney flap in the chimney – pot and by turning down the air rose of the secondary
air input. The smoky flap and air rose opening level is necessary to be tried out, it is always necessary to make sure that the product of
consumption did not get away to the boiler room. In this case the draught controller to be disconnected.
5. The morning boiler operation reconditioning to be performed by opening of the smoky flap and air rose and with grate raking after opening
the ash door.
6. The ash door must be during the operation permanently closed.
7. The ashtray to be emptied according to needs (gloves need to be used).
8 Maintenance
1. The ash from the ashtray to be emptied during the operation of the boiler even several times per day according to the sort of used fuel
because a full ashtray hampers the right distribution of the burning air under the fuel and causes unequal burning process of fuel on the
grate. All remains in the firebox especially the clinker are removed before each new burning up and at morning boiler operation
reconditioning. The ash is needed to be put away into the fire – resistant tanks with a cover. It is necessary to use protective
facilitations and to pay attention to personal safety while operating.
2. The boiler walls inside the firebox, smoky boiler draughts and smoky chimney – pot to be cleaned 1x per week if heating with coal.
3. If there is a settlement of tar silt on the walls of the burning space while using fuels with higher gas build – up it can be removed with a
scraper or by burning out with a help of dry wood when setting the boiler to the maximum operating temperature.
9 IMPORTANT NOTICE
1. The boiler VIADRUS U 22 (LP) is not intended for the Czech market.
2. The boiler only can be used for the purpose that it is destined for.
3. The boiler must be operated only by adults who are introduced to these operating instructions. It is unallowable to let children at
the boiler unattended of adults. Interventions into the boiler design that could threaten the health of the operating staff,
eventually the inmates, are disallowed.
4. The boiler is not destined for the use by persons (incl. children) whose physical, sensual or mental disability or lack of
experience and knowledge prevent them from a safe use of the appliance unless they are supervised or if they were not
instructed on the use of appliance by a person responsible for their safety.
5. Children should be supervised in order to ensure that they do not play with the appliance.
6. If there is a risk of rise and getting away of flammable steams or gas into the boiler room or at operations by which there is an
intermediate risk of fire or blast (sticking of floor coverings, paintings with flammable colours), the boiler must be disabled from
operation before the beginning of operations.
7. Using of flammable liquids is DISALLOWED for firing the boiler.
8. It is DISALLOWED to overheat the boiler during its operation.
9. Objects of flammable materials must not be put on the boiler and to a distance smaller than that of a safety distance from it
10. Flammable materials must not be in the minimal distance of 1500 mm from the boiler when emptying the ash at the boiler.
11. The space at the point of choking valve rotation of the ashtray door must be cleaned in case of clogging with fuel, ashes or other
impurities in order to avoid its rubbing thus wrong functioning.
12. When the boiler operates at a lower temperature than of 60 °C the retting, or the so called low – temperature rust, of the boiler
drum may occur that reduces the operating life of the boiler drum. Therefore we recommend to operate the boiler at a
temperature of 60 °C or higher.
13. After finishing of the heating period it is necessary to properly clean the boiler, smoke stack and chimney – pot. The fulcrum pin,
smoky flap mechanism and other movable parts to be covered with graphite grease. And the boiler room to be kept clean and
dry.
14. In case the heating system is not daily used in winter season, then the water from boiler must be drained.
15. It is necessary to install a safety valve for maximum overpressure of 400 kPa (4 bar) on the system and its dimension must
correspond to the rated boiler output. The safety valve must be located directly behind the boiler. Any stop valve must not be
located between the safety valve and boiler. If you have any questions, please contact our contractual assembly firm and service
organizations.
16. During assembly, installation and operation of the appliance it is necessary to comply with standards that apply in the relevant
country of destination.
If you fail to meet these conditions you cannot requisite the guarantee repairs.
16
10 Instructions for product liquidation after its operating life
VIADRUS a.s. is contractual partner of firm EKO – KOM a.s. with client number F00120649.
The packages comply with EN 13427.
With respect to the fact that the product is designed out of common materials the individual parts are recommended to be liquidated in the
following manner:
- exchanger (grey cast iron), by a company engaged in salvage and liquidation of waste
- tube distributions, jacketing, by a company engaged in salvage and liquidation of waste
- other metal parts, by a company engaged in salvage and liquidation of waste
- sealing materials in common waste
We recommend to dispose the packages in the following way:
- plastic foil, cardboard cover, use a salvage point
- metal strapping tape, use a salvage point
- wooden base, is designated for a single usage and no longer can be used as a product. Its disposal is subject to Act. 477/ 2001 Sb. a
185/2001 Coll. as amended.
In case that the product has lost its manufacture qualities there can be taken the advantage of product taking back (if this is
established), in case that the originator has declared that this is a waste and it must be handled according to the valid legislation of
the relevant country.
VIADRUS a.s. provides the extended guarantee period for the boiler drum during 60 months from the sell-by date, but not longer than
66 months from the dispatch date of the product from the production plant.
The condition for recognition of the extended guarantee period is the following:
• Observation of the conditions for recognition of the basic guarantee period.
• Sending information to the manufacturer about commissioning the boiler (this information is to be sent by a service company)
• Fulfilment of regular service inspections within the range prescribed by the manufacturer, by a service company with a valid service
certificate.
In case of a claim of the boiler shell, a customer is obliged to present the packaging label of the boiler shell. It is placed on the
cardboard box, in which the boiler shell is transported.
The user is obliged to order removing defects only to a qualified contractual service organization accredited by the boiler
manufacturer – VIADRUS a.s., otherwise the guarantee for appropriate function of the boiler would not be valid. “Certificate of quality
and completeness of the VIADRUS U 22 boiler” serves – after its fulfilment – as a “Guarantee certificate”.
The user is obliged to perform regular maintenance of the boiler.
Each notification of defects has to be made immediately after their detection and always in written form and by phone.
In case of non-observance of the above mentioned instructions, the guarantee provided by the manufacturer is not admitted.
The manufacturer reserves the right for changes performed within innovation of the product, which don’t need to be included to this
manual.
The manufacturer is not liable for possible damages, if the product is not operated in accordance with the conditions specified in this
Service manual.
The grant does not apply for:
- Faults caused by improper assembly and improper attendance of the product and faults caused by improper maintenance see
chap. 8;
- Faults and damage caused by failure to observe water quality in heating system see chap. no. 4.1 and 5.3.2 or by using the anti-
freeze mixture;
- Faults caused by failure to observe instructions stated in this manual;
- Defects caused by a wrong assembly or incorrect operation of the product;
- Damage of the product during transfer or other mechanical damage;
- Defects caused by improper storage.
17
12 Product fiche
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
18
VIADRUS HERCULES U 22 5 sect.
Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
19
VIADRUS HERCULES U 22 6 sect.
Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
20
VIADRUS HERCULES U 22 7 sect.
Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
21
VIADRUS HERCULES U 22 8 sect.
Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
22
VIADRUS HERCULES U 22 9 sect.
Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
23
VIADRUS HERCULES U 22 10 sect.
Condensing boiler no Solid fuel cogeneration boiler no Combination boiler no
Symbol
Item
Item
Value
Value
Unit
Unit
Symbol
24
Information for customer
Packaging identification Assessment reference
PE Plastic sacks, folie, corrugated board, iron and plastic fix line
NOTE Conformity with EN 13427 requires affirmative responses to sections 1.1; 1.2; 1.3 and to at least one of 3.1; 3.2; 3.3.
In addition, where a claim of reuse is made section 2 should also record affirmative responses.
25
26
Appendix to the Warranty card for customer - user
Recording of performed warranty and after – warranty repairs and performance of regular product check
Contractual service
Recording Customer´s
Performed operation organization
date signature
(signature, stamp)