LV Switch Board 1.1.2 - Test Report For Visual Check Report: Client

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

National Bank of Kuwait New Headquarter

Sub-
Project Engineer Main Sub- T&C
Client: Sub-
Manager: Representative: Contractor: Contractor: Specialist:
Contractor

Doc. Ref. No.: Revision: 0 Date: 03-11-2018


Panel Name LV Switch Board 1.1.2 Feeder Name -
IEP-QP-TR-800 Test Report For Visual Check Report

1. Visual checks Report:

S.No Description Checking Status Remarks

Visual inspection, no damages, assembly bolts


1 tightness, nothing missing, alignment etc. Ok -

Check connection of the main earth bar to the


2 Ok -
installation earthling conductor.

Remove all residual materials; clean the


3 switchgear, rubbing down insulating parts with Ok -
a soft dry clean non-fraying cloth.

4 Check panel paint& IP rating Ok -

Check the clearances around panel as per


5 standard. Ok -

6 Check name plate details & feeders labels. Ok -

performed by witnessed by Witnessed /Review/ Approval by:

Name IEPC BMB EES ACTC BH PROJACS

Signature

Date