Task Description
Dropped objects
Boom failure
Man overboard
Leader :
Attendees :
Hazard
Bahaya
Benda terjatuh
Kegagalan boom
Junovi S/ Rengga K
Andarias Sakkung,Nur Hari S,Aria Wibisana
10
Perform anchoring as per approved LOP
Install warning sign and barricade around lifting area and limit
access to only authorized personnel
Crane operator, rigger, dan banksman yang bertugas harus Check 1st day and have to be valid for PTW duration
x OA & PA
mempunyai sertifikat Di check di hari pertama dan harus valid selama masa PTW
Alat angkat harus dalam kondisi baik, sesuai dengan kode Check 1st day and have to be valid for PTW duration
x OA & PA
warna (sertifikat yang masih berlaku) Di check di hari pertama dan harus valid selama masa PTW
Komunikasi yang baik antara Crane Operator, Rigger, Discussed during Toolbox Talk and ensured during Supervision
x PA
Banksman dan Pekerja lainnya Didiskusikan ketika Toolbox Talk dan dipastikan melalui pengawasan
Checked in WP front page precaution by OA & Ensure permanently by
Pasang tanda peringatan dan barikade di sekitar tempat
PA
pengangkatan dan membatasi akses ke personil hanya x OA & PA
Diperiksa dalam pencegahan pada halaman depan WP oleh OA &
berwenang
pastikan seterusnya oleh PA
Discussed during Toolbox Talk and ensured during Supervision
Tidak ada orang di bawah radius jatuh x x PA
Didiskusikan ketika Toolbox Talk dan dipastikan melalui pengawasan
Sikap dan posisi tubuh yang tepat selama melakukan Discussed during Toolbox Talk and ensured during Supervision
x PA
pengangkatan dan akitivitas pengangkatan Didiskusikan ketika Toolbox Talk dan dipastikan melalui pengawasan