PREFACE
TURCON Private Limited’s primary policy is to satisfy its employers and end-users by
means of completing the projects undertaken within pre-defined quality, schedule,
resources and budget requirements.
TURCON’s management ensures that the quality requirements of the projects undertaken
are complied with during all phases of the Projects.
The Contract requirements are implemented and followed by the project organization
without any significant deviation and adherence to the quality requirements as set by the
specifications / codes / standards / procedures / quality plans are verified through quality
records and auditing to be exercised.
1. Project Manager:
Project Managers are delegated full authority and responsibility for ensuring
conformance to the quality requirements as defined by the applicable standards, codes
and statutory regulations contained within their Contracts.
All project staff and manpower other than those above stated have the responsibility
to comply strictly with statutory regulations, contract requirements and procedures
developed to meet the quality requirements.
The main purpose of the Quality Assurance System (Hereinafter referred to as the
“QS”) to be defined by the Quality Assurance Manual is to ensure that the project(s)
operations (processes, resources and environmental factors) which may affect the
quality of works are/will be under control.
The QS places effective controls on all critical functions of contract execution and
clearly identifies all aspects related to:
Overall Contract Quality Plans covering all activities regarding design, production,
installation, tests and commissioning are developed and maintained. These plans shall
clearly identify the following quality related activities;
Verification that the supervisors and workers are skilled in their craft and
familiar with the Contract(s) quality requirements, and provide further
training, when required, to improve skills to meet special construction
requirements,
The audits to be exercised shall ensure that the function is completed “Right
the first time, every time” and not left to inspections at final stages where
exposure of failure may result in costly rework and delay in project schedule.
3. Inspection and Test Plans:
The Inspection and Test plans based on specifications and applicable codes/standards
are developed to ensure that the quality requirements are met.
The Inspection and test plans for the products/services indicate (as applicable) the
following;
Sampling data/period,
4. Audit:
Contract Quality System clearly identifies all aspects related to internal and
supplier/subcontractor quality audits. Schedules of planned audits are prepared and
submitted to the Owners, who (or Owner’s representative) may attend or participate
in any of them.
All audits are documented and such documentation is subject to Owner’s review and
time.