1 RELEVEU - 20.009.2018 2 PROIECT PRELIMINAR - 20.10.2018 3

1 PROIECT PRELIMINAR - 30.10.2018 2


2.1

Page 1
Sheet1

SOVATA
VILA TELEKI
SOLUŢIA FINALĂ - 15.11.2018 4 PROIECT TEHNIC - 20.12.2018
4.1 ETAJ 2
4.1.1 PLAN GENERAL 1:50
4.1.2 DETALII 1:20
4.1.2.1 PLAN MOBILARE CAMERE
4.1.2.2 PLANURI BĂI (DUŞURI 70 cm!!!)
4.1.2.3 TERASĂ CAMERĂ NOUĂ
4.1.3 INSTALAŢII
4.1.3.1 SANITARE + CANALIZARE
4.1.3.2 ELECTRICE
4.1.4 REZISTENŢĂ
4.1.4.1 DESFACERI ZIDURI PORTANTE
4.1.4.2 TERASĂ
4.2 LIFT
4.2.1 MATERIAL KAKUK
4.2.2 OFERTE ALTERNATIVE
4.3 TERASĂ
4.3.1 ARHITECTURĂ
4.3.2 REZISTENŢĂ
4.4 INTRARE SPATE + GANG
4.4.1 ARHITECTURĂ
4.4.1.1 INTRARE
4.4.1.2 GANG
4.4.2 REZISTENŢĂ
4.4.3 INSTALAŢII
4.4.3.1 CANALIZARE
4.4.3.2 ELECTRICE
4.5 POMPIERISTICE
4.5.1 REZERVOR + POMPE
4.5.2 DESFUMARE CASA SCĂRII
4.5.3 TAVAN MANSARDĂ / POD
4.5.4 ILUMINAT SIGURANŢĂ
4.5.4.1 EXITURI
4.5.4.2 CIRCULAŢII
4.5.4.3 ANTIPANICĂ
4.5.5 HIDRANT
4.5.6 SEMNALIZARE
4.6 BALUSTRADĂ (?)
4.7 VERIFICĂRI
4.8 CPE + AUDIT
4.9 AMENAJARE ACCES LOC DE JOACĂ (?)

SPA
SOLUŢIA FINALĂ - 15.11.2018 3 PROIECT TEHNIC - 15.02.2019
UPDATE SECŢIUNI SOL. FIN. ANDRIS 3.1 VOLUMETRIE / DESIGN EXTERIOR
3.2 DESIGN INTERIOR ZONA BAZINE
3.3 TURN

Page 2
Sheet1

3.4 RECEPŢIE
3.5 VESTIARE
3.6 BUFET
3.7 ZONA SPA
3.8 AMENAJĂRI EXTERIOARE
3.9 WELNESS EXISTENT

Page 3
Sheet1

5 DTAC - 20.12.2018 6 DETALII EXECUŢIE – 30.01.2019 7

CRISTI

CRISTI

ANDRIS
ANDRIS

4 DTAC - 15.02.2019 5 DETALII EXECUŢIE - 01.04.2019 6

Page 4
Sheet1

AMENAJĂRI INTERIOARE – 30.01.2019 8 URMĂRIRE ŞANTIER

AMENAJĂRI INTERIOARE - 01.04.2019 7 URMĂRIRE ŞANTIER

Page 5