Professional Documents
Culture Documents
Hence The Spcacing Between Rod Is (MM) 105 O.K
Hence The Spcacing Between Rod Is (MM) 105 O.K
Hence The Spcacing Between Rod Is (MM) 105 O.K
Effective Depth Required for slab (Dreqd) in mm Sqrt (4.685E+07/ (0.36 * 20 * 0.46*(1-(0.42*0.46)) * 5.13 * 1000) 58
Breadth at section -ZZ in 'm' = 5.13 Since (dreqd) < than (dactual), Slab depth is O.K
Moment of Resistance at Section - ZZ Mrz in N-mm/m (Mrz =0.87 *500 * Ast *282 * [1-(Ast *500 / 20 * 5130*282]
Total Reinforcement Ast required in mm2 = 10.875 Ast^2 - 122670 Ast + 4.685E+07 = 0
where Ast = Reinforcement Reqd. for moment Mrz Solving the above Quadratic equation for Ast We Get Ast = 395.80
Ast=Reinforcement required for total width of bottom slab 5.13 x 1080 5540.40
Total No of bars required for slab ( 5540.4 / ( Pi / 4 * 12 ^ 2)) ( No of bars required = 48.99 49
2
(b) Effective Area of Cross Section in mm /m ( 832 * 1000 ) 832000
2
(c) Nominal Shear Stress Tv in N/mm /m ( 20084.994 * 9.81 / 832000) 0.237
(d) Percentage Slab reinforcement (p) /m p = ( 100 * 5541.77 / ((1000 * 832 * 5.13 ) 0.13
2
(e) Permissible Shear Stress Tc in N/mm /m ( Refer clause no 4.10 of Sp-16- 1980 Design Aids for IS 456
2
(f) Permissible Shear Stress Tc in N/mm [ 0.85 x { Sqrt (0.8 x Fck) }x{{sqrt(1+5Ct)}-1}]/(6xCt )
2
(h) Permissible Shear Stress Tc in N/mm /m ( ( ( 0.85* ( ( 0.8 * 20 ) ^0.5*((( 1+5 * 17.863 )^0.5-1) ) / ( 6 *17.863 ))) 0.270
2
(b) Effective Area of Cross Section in mm /m ( 532 * 1000 ) 532000
2
(c) Nominal Shear Stress Tv in N/mm /m ( 12369.9325 * 9.81 / 532000) 0.228
(d) Percentage Slab reinforcement (p) /m p = ( 100 * 5541.77 / ((1000 * 532 * 5.13 ) 0.203
2
(f) Permissible Shear Stress Tc in N/mm /m ( ( ( 0.85* ( ( 0.8 * 20 ) ^0.5*((( 1+5 * 11.439 )^0.5-1) ) / ( 6 *11.439 ))) 0.328
2
(b) Effective Area of Cross Section in mm /m ( 282 * 1000 ) 282000