Professional Documents
Culture Documents
Permohonan Data Tugas Akhir Untuk Design Gas Lift: 1. Well Profile
Permohonan Data Tugas Akhir Untuk Design Gas Lift: 1. Well Profile
1. Well Profile
Kedalaman Sumur, Ukuran Tubing, Laju Produksi, Well Completion dan Lain-
lain.
2. PVT Data
Porositas, Pressure Bubble, GOR, FvF, Oil Gravity, Gas Gravity, Viscositas Oil &
Gas, Salinity, Mol% H2s, Mol% Co2, Mol% N2, Pressure Initial, Conate Water
Saturation.
3. Water Cut
4. Productivity Index
5. Tekanan Reservoir Statik
6. Tekanan Alir Dasar Sumur
7. Pressure Gradient
1. PVT Data :
Porositas, Pressure Bubble, GOR, FvF, Oil Gravity, Gas Gravity, Viscositas Oil &
Gas, Salinity, Mol% H2s, Mol% Co2, Mol% N2, Pressure Initial, Conate Water
Saturation.
2. Well Data :
3. Tank Data :