SL. NO. CHILLED WATER FAN SYSTEM VRF SYSTEM DX SPLIT SYSTEM
Capex is less and low Capex is comparatively less Capex is less and higher
1. maintenance cost. and higher maintenance maintenance cost.
cost.
Single point of maintenance, Require individual Require individual
easily accessible as the cooling attention which need attention which need
2. plant is at one location access to each Chalet as access to each Chalet as
the outdoor unit will be on the outdoor unit will be
the chalet roof. on the chalet roof.
No roof mounted units which Multiple outdoor units on Multiple outdoor units
is aesthetically pleasing. roof, which will affect the on roof, which will affect
aesthetic view of the the aesthetic view of the
3. building or should be building.
placed in a yard away from
the building.
Power consumption for AC Power consumption will be Power consumption will
system for each Chalet is very very high due to individual be very high due to
low as there are indoor fan DX outdoor units, as a individual DX outdoor
4. coil units only. result the cost of electrical units, as a result the cost
cables & control systems of electrical cables &
will go high and require control systems will go
maintenance as well. high and require
maintenance as well.
Environmental friendly as Chances of refrigerant Chances of refrigerant
there is no chance of leaks which will affect the leaks which will affect
5. refrigerant leaks as water is ambiance. the ambiance.
the cooling medium.
Chilled water system can Rooftop out units must Rooftop out units
be sized for the be sized for the peak must be sized for the
instantaneous peak heat load of the areas they peak load of the areas
6. load and thus diversity in serve and therefore, they serve and
the total cooling load is cannot consider therefore, cannot
possible. diversity. consider diversity.
Redundancy is possible as Redundancy is practically
7. there are multiple impossible.
Chillers & Pumps
Longer life expectancy, usually Shorter life expectancy, Shorter life expectancy,
8. up to 25 years if well maximum 10 to 15 years. maximum 10 to 15
maintained. years.
B. COST COMPARISON OF VARIOUS AIR CONDITIOINING SYSTEMS
1. Technical details:
Therefore,
Installation cost for the underground chilled water pipes - RO. 74,760/-
Therefore,
Total cost for the chilled water system : (134x254) + (134x85) + 50,000 + 10,000 + 74,760
: RO. 180,186.000
VRF SYSTEM
1. Technical details:
2. Cost details:
Note: Cost includes copper pipe, suction & discharge, 19 mm insulation, Cora cloth, vapour
barrier, Communication cable wire and CRC remote wire and Pressure testing.
Therefore,
Total cost for the DX VRF system : (134x407) + (19x4000) + (134 x 80) + (800x10)
: RO. 149,258.000
DX SPLIT SYSTEM
2. Cost details:
: RO. 76,916.000
C. CONCLUSION
It is understood from the above stated techno-commercial comparisons that the DX Split system
and the VRF system are simple in terms of initial capital cost, installation and the operational
point of view, but these systems are expensive in terms of power consumption and equipment’s
life span. However, one of these options (VRF or DX Split) may be chosen for the Chalets’ air
conditioning, if the initial expenditure for the project is a serious concern.
It is also understood that the chilled water system would be the cheapest solution amongst the
three options, considering the reduced power consumption, protection for the environment,
providing aesthetics for the building and finally the longer life span of the equipment and the
system.
D. RECOMMENDATION
Though the capital cost for the chilled water systems is relatively high in the beginning,
considering the savings on the cost of energy and the cost for replacing the VRF / DX Split
systems after their operational life, we recommend going for the chilled water system for the
Chalets air conditioning in order to ensure sustainability in designs and aesthetics which is also
crucial in the building designs.