Evaluare Liceu
Evaluare Liceu
Evaluare Liceu
)
1 2 3 4 5 6
1 Zona camping 182442.6
1.1 Balast mc 219.15 60 13149
1.2 Nisip mc 54.79 90 4931.1
1.3 Pavele trafic greu mp 1095.75 150 164362.5
2 Loc de joaca pentru copii 16733.5
2.1 Nisip mc 108.15 90 9733.5
2.2 Borduri ml 100 70 7000
3 Alei carosabile 109007.55
3.1 Balast mc 130.94 60 7856.4
3.2 Nisip mc 32.735 90 2946.15
Semanare
gazon ,plantare
tei, salcam si
4.1 flori mp 3456.00 50.00 172800.00
5 Parcari auto 15074.25
5.1 Balast mc 27.00 65.00 1755.00
5.2 NIsip mc 9.00 95.00 855.00
Pavele trafic
5.3 greu mp 90.00 138.49 12464.25
TOTAL
GENERAL 329859.50
12319.46
14368.95
5817.6
5656.9
6753.38
2319
3027.38
28406.09
45801.84
18217.82
6362.15
6054.76
1443.82
16342.14
5342.62
9428.08
8792
2516
2095.88
32432.7
340480.00 3666.40
11970.00
53200.00
55860.00
219450.00
32940.00 682956.92
103915.95 186.274525
9960.75
5164.60
88790.60
38135.71
2691390.44
Nr crt Tipul lucrarii U.M. Cantitatea Pret unitar(fara T.V.A) Pret total(fara T.V.A.)
1 2 3 4 5 6
1 Infrastructura 129812.11
1.1 Sapatura mc 185.99 15.00 2789.85
1.2 Cofrare mp 557.97 20.00 11159.40
1.3 Armare kg 8678.40 5.70 49466.86
1.4 Turnare beton mc 165.99 400.00 66396.00
2 Suprastructura 249164.51
2.1 Cofrare mp 185.99 20.00 3719.80
2.2 Armare kg 2059.69 5.70 11740.25
2.3 Turnare beton mc 23.25 400.00 9300.00
2.4 Cofrare mp 243.93 20.00 4878.60
2.5 Armare kg 3863.42 5.70 22021.49
2.6 Turnare beton mc 24.40 400.00 9758.00
2.7 Cofrare mp 394.78 20.00 7895.52
2.8 Armare kg 4260.64 5.70 24285.65
2.9 Turnare beton mc 59.45 400.00 23780.00
2.10 Scara mp 12.59 280.00 3525.20
2.11 Acoperis terasa mp 220.00 583.00 128260.00
3 Arhitectura 254990.63
3.1 Zidarie mc 130.08 650.00 84552.00
3.2 Tamplarie mp 58.49 400.00 23396.00
1031747.244
-1.179869286716E-06
4000000
3500000
3000000
2500000
2000000
U.M.
1500000 Cantitatea
Pret unitar(fara T.V.A)
Pret total(fara T.V.A.)
1000000
500000
TOTAL GENERAL
Cofrare
Cofrare
Armare
Cofrare
Zidarie
Finisaje interioare
Pavele
Armare
Imprejmuire
Pardoseala parchet
Invelitoare
Balast
Balast
Turnare beton
Turnare beton
Turnare beton
Turnare beton
Nisip
Sarpanta
Instalatii
1 1 1.11.21.31.4 2 2.12.22.32.42.52.62.72.82.92.10
2.113 3.13.23.33.43.53.63.73.8 4 5 5.15.25.35.45.5 6 6.16.26.36.4 7 8 8.18.28.3 9
Nr crt Tipul lucrarii U.M. Cantitatea Pret unitar(fara T.V.A) Pret total(fara T.V.A.)
1 2 3 4 5 6
1 Infrastructura 238928.70
1.1 Sapatura mc 265.70 27.00 7173.90
1.2 Cofrare mp 797.10 37.00 29492.70
1.3 Armare kg 12826.28 7.50 96197.10
1.4 Turnare beton mc 235.70 450.00 106065.00
2 Suprastructura 346848.10
2.1 Cofrare mp 265.70 37.00 9830.90
2.2 Armare kg 4906.06 7.50 36795.45
2.3 Turnare beton mc 33.21 450.00 14945.40
2.4 Cofrare mp 348.48 35.00 12196.80
2.5 Armare kg 6376.32 7.50 47822.40
2.6 Turnare beton mc 34.85 450.00 15682.50
2.7 Cofrare mp 849.68 35.00 29738.80
2.8 Armare kg 6943.78 7.50 52078.35
2.9 Turnare beton mc 84.97 450.00 38235.60
2.10 Scara mp 30.50 300.00 9150.00
2.11 Sarpanta mp 604.30 133.00 80371.90
3 Arhitectura 1554224.30
3.1 Zidarie mc 880.56 890.00 783698.40
3.2 Tamplarie mp 264.15 600.00 158490.00
Pardoseala
3.3 parchet mp 529.85 135.00 71529.75
Pardoseala
3.4 gresie mp 403.38 160.00 64540.80
Finisaje
3.5 interioare mp 1919.75 145.00 278363.75
3.6 Fatada mp 537.24 190.00 102075.60
3.7 Invelitoare mp 630.90 140.00 88326.00
3.8 Rampa mp 16.00 450.00 7200.00
4 Instalatii 170000.00
5 Alei 884593.15
5.1 Nisip mc 162.50 65.00 10562.50
5.2 Balast mc 651.95 50.00 32597.50