1 - Method Statement For Trial Pit Excavtion

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

STABILITY CHECK FOR ALL

INCLINED PANELS

Entrances to the Jewel of The


Creek Development

Rev. 00 Date: 07- Oct -2017


PROJECT NO : R777/4B1 ENPO17101-01
Page 1 of 1

PROJECT: ENTRANCES TO THE JEWEL OF THE


CREEK DEVELOPMENT
(CONTRACT – R777/4B1)

STABILITY CHECK(SLIDING) PROJECT WIDE (PACKAGE


A & B)

CLIENT : ROADS AND TRANSPORT AUTHORITY, DUBAI.

ENGINEER : PARSONS OVERSEAS LIMITED.

CONTRACTOR: AFCONS CONSTRUCTION MIDEAST L.L.C.

You might also like