DAFTAR HARGA SATUAN

BAHAN DAN UPAH UNTUK WILAYAH PUNDONG


KABUPATEN BANTUL
TAHUN 2019
HARGA SATUAN
NO URAIAN SPESIFIKASI BAHAN SATUAN HARGA SATUAN HPS PENAWARAN
A. UPAH TENAGA
1 Mandor Lokal Standar OH Rp 85,000.00
2 Kepala Tukang Batu Lokal Standar OH Rp 85,000.00
3 Kepala Tukang Kayu Lokal Standar OH Rp 90,000.00
4 Kepala Tukang Besi Lokal Standar OH Rp 85,000.00
5 Kepala Tukang Cat Lokal Standar OH Rp 75,000.00
6 Kepala Tukang Las Lokal Standar OH

7 Kepala Tukang Almunium Lokal Standar OH

8 Kepala Tukang Listrik Lokal Standar OH

9 Tukang Batu Lokal Standar OH Rp 80,000.00


10 Tukang Kayu Lokal Standar OH Rp 80,000.00
11 Tukang Besi Lokal Standar OH Rp 80,000.00
12 Tukang Cat Lokal Standar OH Rp 80,000.00
13 Tukang Las Lokal Standar OH

14 Tukang Listrik Lokal Standar OH Rp 85,000.00


15 Tukang Almunium Lokal Standar OH

16 Pekerja Lokal Standar OH Rp 70,000.00


17 Aplikator Plafon Lokal Standar ls

B.1 BAHAN DASAR


1 Pasir Cor / Pasir Beton Merapi / Progo m3 Rp 274,000.00 Rp 300,000.00 PUNDONG / TB. TIMBUL JAYA
2 Pasir Pasang Merapi / Progo m3 Rp 326,000.00
3 Pasir Urug Merapi / Progo m4 Rp 132,000.00
3 Kerikil Beton Merapi / Progo m3 Rp 298,000.00
4 Sirtu Merapi / Progo m3 Rp 155,000.00
5 Batu Belah 15/20 Merapi / Progo m3 Rp 236,000.00
6 Tanah Urug Lokal Standar m3 Rp 154,000.00
7 Bata Merah Lokal Standar bh Rp 1,000.00
8 Bata Ringan Lokal Standar bh 3,000
9 Semen Portland (PC) Holcim / Gresik / Tiga Roda kg Rp 2,000.00 Rp 975.00 PUNDONG / TB. TIMBUL JAYA
10 Semen Warna Sika kg Rp 16,000.00
11 Beton Ready Mix K-300 / f'c 25 Mpa ADP / Karya Beton m3

12 Beton Ready Mix K-275 / f'c 22.8 Mpa ADP / Karya Beton m3

13 Beton Ready Mix K-250 / f'c 20.75 Mpa ADP / Karya Beton m3

B.2 BAHAN BESI


1 Besi Beton Perwira kg Rp 14,000.00
2 Baja IWF Krakatau Steel kg Rp 19,000.00
3 Plat Baja Krakatau Steel kg

4 Besi Strip Krakatau Steel kg

5 Kawat Ikat Beton Lokal Standar kg Rp 17,000.00


6 Paku 1" s/d 4" Lokal Standar kg Rp 20,000.00
7 Paku Payung Lokal Standar kg Rp 31,000.00
8 Paku Sekrup Lokal Standar bh Rp 2,000.00
9 Paku Beton Lokal Standar bh Rp 1,000.00
10 Kawat Las Lokal Standar kg Rp 37,000.00
11 Dynabolt Ø 10 mm Lokal Standar bh

B.3 BAHAN KACA


1 Kaca Bening tbl 3 mm Asahimas m2 Rp 85,000.00
2 Kaca Bening tbl 5 mm Asahimas m2 Rp 114,000.00
3 Kaca Bening tbl 10 mm Asahimas m2

4 Kaca Temperred tbl 12 mm Asahimas m2

5 Kaca Es tbl 3 mm Asahimas m2

6 Kaca Es tbl 5 mm Asahimas m2

7 Pipa Stainless Steel Ø 2" tbl 1.2 mm Maspion m1

B.4 BAHAN KAYU


1 Papan Kayu Kelas III (Bekisting) Kayu Meranti m3

2 Balok Kayu Kelas II (Bekisting) Kayu Meranti m3

3 Penjaga Jarak Bekisting Lokal Standar bh

4 Plywood / Multiplek tbl 12 mm Kayu Meranti lbr Rp 213,000.00


5 Plywood / Multiplek tbl 9 mm Kayu Meranti lbr Rp 172,000.00
6 Plywood / Multiplek tbl 6 mm Kayu Meranti lbr Rp 102,000.00
7 Plywood / Multiplek tbl 4 mm Kayu Meranti lbr Rp 87,000.00
8 Plywood / Multiplek tbl 3 mm Kayu Meranti lbr Rp 66,000.00
9 Woodplank 20 cm Elephant m1

10 Woodplank 30 cm Elephant m1

11 Kayu Dolken Kayu Meranti bar Rp 14,000.00


12 Bambu Lokal Standar btg

B.5 BAHAN PENUTUP DINDING / LANTAI


1 Lantai Homogeneous 100 x 100 cm Niro m2

2 Lantai Homogeneous 60 x 60 cm Roman m2

3 Lantai Keramik 60 x 60 cm Platinum m2

4 Lantai Keramik 50 x 50 cm Platinum m2

5 Lantai Keramik 40 x 40 cm Platinum m2 Rp 73,000.00


6 Lantai Keramik KM / WC 30 x 30 cm (Tekstur) Platinum m2

7 Lantai Keramik KM / WC 20 x 20 cm (Tekstur) Platinum m2

8 Dinding Keramik 30 x 60 cm Roman m2

9 Dinding Keramik 20 x 40 cm Roman m2

10 Dinding Keramik 20 x 33 cm Roman m2

11 Floor Hardener Lokal Standar m2

12 Stepnosing Tangga Roman m1

B.6 BAHAN LANGIT-LANGIT


1 Gypsum tbl 9 mm Jaya Board lbr

2 Kalsiboard tbl 3.5 mm Jaya Board lbr Rp 81,000.00


3 GRC tbl 3.5 mm Jaya Board lbr

4 Eternit Asbes 100 x 100 cm tbl 4 mm Jaya Board lbr


5 Akustik Panel 120 x 60 cm tbl 12 mm Jaya Board lbr

6 Kalsium Silikat tbl 6 mm Imperial lbr

7 List Gypsum Lokal Standar m1

8 Furing Chanel PN 204 Jaya Board bh

9 Top Cross Rail PN 200 Jaya Board bh

10 Wall Angle PN 212 Jaya Board bh

11 Conector PN 210 Jaya Board bh

12 Susp. Clip PN 223 Jaya Board bh

13 Susp. Rod PN 225 Jaya Board bh

14 Angle Clip PN 220/221 Jaya Board bh

15 Direct Fix Clip PN 219 Jaya Board bh

16 Kompon & Kalsit Jaya Board bag

17 Drywall Screw Jaya Board bh

18 Rangka Metal Hollow 37.37.0,6 mm Lokal Standar m1

19 Rangka Metal Hollow 40.40.1.5 mm Lokal Standar m1

20 Bolt Screw Jaya Board bh

B.7 BAHAN PENUTUP ATAP


1 Atap Onduvilla (terpasang) Onduvilla m2

2 Nok Onduvilla (terpasang) Onduvilla m1

3 Kuda-kuda Baja Ringan (terpasang) Galvasteel m2

4 Seng Plat BJLS 0.2 Lokal standar lbr

5 Seng Gelombang BJLS 0,2 Lokal standar lbr

6 Zincalume tbl 0.40 BMT BlueScope Lysaght m2

7 Atap Polycarbonate tbl 100 mm Twinlite lbr

B.8 BAHAN CAT


1 Cat Dasar Dinding Dalam Mowilex kg

2 Cat Dasar Dinding Luar Mowilex kg

3 Cat Dinding Dalam Mowilex kg

4 Cat Dinding Luar Mowilex kg

5 Cat Dasar Plafon Mowilex kg

6 Cat Plafon Mowilex kg

7 Cat Dasar Genteng Mowilex kg

8 Cat Genteng Mowilex kg

9 Cat Besi Mowilex kg

10 Cat Zincromate Propan kg

11 Roll Lokal Standar ls

12 Plamir Propan m2

B.9 BAHAN PINTU JENDELA


1 Kusen Alumunium 4" Alexindo m1

2 Kusen Alumunium 3" Alexindo m1

3 Kusen Alumunium 2" Alexindo m1

4 HPL (High Pressure Laminated) Lokal Standar m2

5 Kunci Tanam Lokal Standar bh

6 Selot Pintu Lokal Standar bh

7 Door Closer Lokal Standar bh

8 Engsel Pintu Biasa Lokal Standar bh

9 Engsel Jendela Biasa Lokal Standar bh

10 Engsel Angin Lokal Standar bh

11 Grendel Biasa Lokal Standar bh

12 Grendel Tanam Lokal Standar bh

13 Rolling Door Besi Lokal Standar bh

14 Rolling Door Alumunium Lokal Standar m1

15 Pintu Lipat Besi Lokal Standar m1

16 Lem Kayu Lokal Standar klg

17 Daun Pintu Kayu Standar (210 x 80 cm) Jati Unit

18 Daun Pintu Kayu Standar (210 x 70 cm) Jati Unit

19 Kusen Pintu Standar (210 x 80 cm) Jati Unit

20 Kusen Pintu Standar (210 x 70 cm) Jati Unit

21 Pegangan Stainless Steel Lokal Standar Unit

22 Naco (Per Daun) Lokal Standar bh

B.10 BAHAN ELEKTRIKAL


1 AC 1/2 PK Samsung Unit

2 AC 1 PK Samsung Unit

3 Water Heater 15L Modena Unit

4 Exhaust Fan KDK Unit

5 Stop Kontak Broco bh

6 Sakelar Ganda Broco bh

7 Sakelar Tunggal Broco bh

8 Sakelar Hotel Broco bh

9 Sakelar Cam / Handle Broco bh

10 Lampu LED 7 Watt Phillips bh

11 Lampu LED 9 Watt Phillips bh

12 Lampu Down Light 5" LED 9 W Phillips bh

13 Pipa Conduit 5/8" Lokal Standar m1

14 In Bow Doos Lokal Standar bh

15 Tee Doos Lokal Standar bh

16 Klem Pipa Lokal Standar bh

17 Fhiser Lokal Standar bh

18 Las Doop Lokal Standar bh

19 Isolasi Lokal Standar bh

B.11 BAHAN KABEL


1 Kabel NYFGbY 2 x 2.5 mm² Eterna m1

2 Kabel NYFGbY 2 x 4 mm² Eterna m1

3 Kabel NYFGbY 2 x 6 mm² Eterna m1

4 Kabel NYA 1 x 2.5 mm² Eterna m1

5 Kabel NYA 70 mm² Eterna m1

6 Kabel NYM 3 x 6 mm² Eterna m1

7 Kabel NYM 3 x 4 mm² Eterna m1

8 Kabel NYM 3 x 2,5 mm² Eterna m1

9 Kabel NYM 2 x 2,5 mm² Eterna m1

10 Kabel NYM 4 x 4 mm² Eterna m1

11 Kabel NYM 4 x 2,5 mm² Eterna m1

B.12 BAHAN SANITAIR


1 Wastafel Lokal Standar set
2 Kran Ø 1/2 Lokal Standar bh

3 Floor Drain Lokal Standar bh

4 Roof Drain Lokal Standar bh

5 Kloset Duduk Lokal Standar set

6 Kloset Jongkok Lokal Standar set

7 Jetwasher Lokal Standar set

8 Hand Shower Lokal Standar bh

9 Washbak Lokal Standar bh

10 Seal Tape Lokal Standar bh

11 Urinoir Lokal Standar bh

12 Achrylic Protector Urinoir Lokal Standar m2

13 Sekat Urinoir Lokal Standar bh

14 Cermin Lokal Standar m2

15 Water Torn, Kap. 3100 liter Penguin bh

16 Water Torn, Kap. 1500 liter Penguin bh

17 Water Torn, Kap. 1000 liter Penguin bh

18 Pompa Air Wasser set

B.13 BAHAN PIPA


1 Pipa PVC D Ø 4" Lokal Standar m1

2 Pipa PVC D Ø 3" Lokal Standar m1

3 Pipa PVC D Ø 2" Lokal Standar m1

4 Pipa PVC AW Ø 4" Lokal Standar m1

5 Pipa PVC AW Ø 1" Lokal Standar m1

6 Pipa PVC AW Ø 3/4" Lokal Standar m1

7 Pipa PVC AW Ø 1/2" Lokal Standar m1

8 Pipa Medium B Galvanis DN Ø ½" Lokal Standar m1

9 Pipa Medium B Galvanis DN 25 Ø ¾" Lokal Standar m1

10 Pipa Medium B Galvanis DN 32 Ø 1" Lokal Standar m1

11 Pipa Medium B Galvanis DN 50 Ø 1½" Lokal Standar m1

12 Pipa Medium B Galvanis DN 63 Ø 2" Lokal Standar m1

13 Pipa Medium B Galvanis DN 90 Ø 3" Lokal Standar m1

14 Pipa Medium B Galvanis DN 110 Ø 4" Lokal Standar m1

B.14 BAHAN CETAK


1 Kanstin K-300 Lokal Standar m1

2 Roster Lubang Angin 15 x 30 cm Lokal Standar bh

3 Paving Blok K-200 Lokal Standar m2

B.15 BAHAN LAIN-LAIN


1 Pompa Readymix (Sewa) Lokal Standar lot

2 Alat Las (Sewa) Lokal Standar jam

3 Print Outdoor Lokal Standar m2

4 Minyak Bekisting Lokal Standar ltr

5 Minyak Pelumas Lokal Standar ltr

6 Premium (Industri) Lokal Standar ltr

7 Solar (Industri) Lokal Standar ltr

8 Air Lokal Standar ltr


PERHITUNGAN VOLUME PEKERJAAN

PROGRAM :
LOKASI : PUNDONG
TAHUN ANGGARAN : 2019
JENIS PEKERJAAN : DRAINASE

GAMBAR
NO
SKETSA
PERHITUNGAN VOLUME

I PEK. PERSIAPAN
1. Pembersihan Lahan
Taksir = 1.00 LS

2 Pengukuran dan Bowplank


Taksir = 1.00 LS

II PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 m
Panjang = 121.00 M'
Lebar = 1.17 M'
Tinggi = 1.20 M'
VOLUME = 169.16 M3 1,2 m

2 Pek. Urugan Pasir , T = 5 CM

0,015 m
Panjang = 121.00 M'

0,8 m
1,165 m
Lebar = 1.40 M'
Tinggi = 0.05 M'
VOLUME = 8.47 M3

0,05 m
0,6 m
III PEKERJAAN PASANGAN 0,3 m 0,3 m

1 Pasang batu kali, 1 Pc : 4 Ps


Bangun 1 Bangun 2 Bangun 3
Panjang : 121.00 M' 121.00 M' 121.00 M'
Lebar : 0.30 0.60 0.30
Tinggi : 1.10 M' 0.20 M' 1.10 M'
Sub Volume 39.93 14.52 39.93
VOLUME = 94.38 M3

2 Plesteran 1 Pc : 4 Psr Tebal 15 mm


Panjang : 121.00 M'
Lebar : 0.70 M' (0,3*2)+(0,05*2)
LUAS = 84.70 M2

3 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Psr


Panjang 121.00 M'
Lebar 2.20 M' (0,8*2)+0,6
LUAS 266.20 M2
DAFTAR ANALI SA HAR GA

LOKASI : Yogyakarta
TAHUN : 2019

PEKERJAAN PASANGAN

SNI 2836:2018 6.2 SNI 2837:2018 6.26


1 m3 Pasang batu kali 1 Pc : 4 Ps 1 m2 Finishing Siar Pas.Batu Kali Adukan 1 Pc : 2 Psr
No Uraian Satuan Koefisien Harga Jumlah No Uraian Satuan Koefisien Harga Jumlah
Satuan Harga Satuan Harga
(Rp) (Rp) (Rp) (Rp)
A TENAGA A TENAGA
Pekerja OH 1.50 70,000.00 105,000.00 Pekerja OH 0.30 70,000.00 21,000.00
Tukang batu OH 0.6 80,000.00 48,000.00 Tukang batu OH 0.15 80,000.00 12,000.00

JUMLAH TENAGA KERJA 153,000.00 JUMLAH TENAGA KERJA 33,000.00


B BAHAN B BAHAN
Batu belah 15/40 m3 1.2 236,000.00 283,200.00 Semen Portland Kg 6.34 2,000.00 12,680.00
Semen Portland Kg 163 2,000.00 326,000.00 Pasir pasang m3 0.012 326,000.00 3,912.00
Pasir pasang m3 0.52 326,000.00 169,520.00
JUMLAH HARGA BAHAN 778,720.00 JUMLAH HARGA BAHAN 16,592.00
C PERALATAN C PERALATAN

JUMLAH HARGA ALAT JUMLAH HARGA ALAT

D Jumlah (A+B+C) 931,720.00 D Jumlah (A+B+C) 49,592.00


E Overhead & Profit 10% x D (maksimum) E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E) F Harga Satuan Pekerjaan (D+E)

SNI 2837:2018 6.4


1 m2 Plesteran 1 Pc : 4 Psr Tebal 15 cm
No Uraian Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja OH 0.30 70,000.00 21,000.00
Tukang batu OH 0.15 80,000.00 12,000.00

JUMLAH TENAGA KERJA 33,000.00


B BAHAN
Semen Portland Kg 6.24 2,000.00 12,480.00
Pasir pasang m3 0.024 326,000.00 7,824.00

JUMLAH HARGA BAHAN 20,304.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 53,304.00


E Overhead & Profit 10% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
RENCANA ANGGARAN BIAYA

REKAP PERHITUNGAN VOLUME PEKERJAAN

Kota : Panitia :
Kecamatan : Jenis Kegiatan :
Kelurahan/Desa : Lokasi Kegiatan :
Jenis Pekerjaan :

No. Uraian Pekerjaan Satuan Volume

I PEK. PERSIAPAN
1 Pembersihan Lahan ls 1.00
2 Pengukuran dan Bowplank ls 1.00
SUBTOTAL
II PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 m m³ 169.16
2 Pek. Urugan Pasir , T = 5 CM 8.47
SUBTOTAL
IV PEKERJAAN PASANGAN
1 Pasang batu kali, 1 Pc : 4 Ps m² 94.38
2 Plesteran 1 Pc : 4 Psr Tebal 15 mm m² 84.70
3 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Psr m³ 266.20
SUBTOTAL
TOTAL
V PAJAK
PPN PPh (10% dari dana yang dibiayai dari PDPM)
TOTAL ANGGARAN
Total

100,000.00
100,000.00
200,000.00

8,880,795.00
1,519,518.00
10,400,313.00

87,935,733.60
4,514,848.80
13,201,390.40
105,651,972.80
116,252,285.80

11,625,228.58
127,877,514.38
RENCANA ANGGARAN BIAYA

PERHITUNGAN KEBUTUHAN TENAGA/ BAHAN/ ALAT DAN ADMINISTRASI

Kabupaten/Kota : Panitia :
Kecamatan : Jenis Kegiatan :
Kelurahan/Desa : Lokasi Kegiatan :
Jenis Pekerjaan :
Jumlah Harga (Rp)
Harga Satuan
No Koefisien Uraian Volume Satuan Total
(Rp)

I PEKERJAAN PERSIAPAN

1 Pembersihan Lahan 1.000 ls


1.000 Pembersihan Lahan 1.000 ls 100,000 100,000
Sub Total (1) 100,000
2 Pengukuran dan Bowplank 1.000 ls
1.000 Pengukuran dan Bowplank 1.000 ls 100,000 100,000
Sub Total (2) 100,000
TOTAL PEKERJAAN PERSIAPAN 200,000
II PEKERJAAN TANAH

1 Galian Tanah Biasa Sedalam 1 m 169.158 m3


0.750 Pekerja 126.869 oh 70,000 8,880,795
Sub Total (3) 8,880,795

3 Urugan Pasir 8.470 m3


1.200 Pasir Urug 10.164 m3 132,000.00 1,341,648
0.300 Pekerja 2.541 oh 70,000 177,870
Sub Total (4) 1,519,518
TOTAL PEKERJAAN TANAH 10,400,313

III PEKERJAAN PASANGAN


1 Pasang batu kali, 1 Pc : 4 Ps 94.380 m3
1.200 Batu belah 15/20 113.256 m3 236,000 26,728,416
163.000 Portland Sement 15,383.940 kg 2,000 30,767,880
0.520 Pasir 49.078 m3 326,000 15,999,298
1.500 Pekerja 141.570 OH 70,000 9,909,900
0.600 Tukang Batu 56.628 OH 80,000 4,530,240

Sub Total (5) 87,935,734


2 Plesteran 1 Pc : 4 Psr Tebal 15 mm 84.700 m2
6.240 Portland Sement 528.528 kg 2,000 1,057,056
0.024 Pasir 2.033 m3 326,000 662,693
0.300 Pekerja 25.410 OH 70,000 1,778,700
0.150 Tukang Batu 12.705 OH 80,000 1,016,400
Sub Total (6) 4,514,849
3 Finishing Siar Pas.batu Kali Adukan 1 Pc : 2 Psr 266.200 m2
6.340 Portland Sement 1,687.708 kg 2,000 3,375,416
0.012 Pasir 3.194 m3 326,000 1,041,374
0.300 Pekerja 79.860 OH 70,000 5,590,200
0.150 Tukang Batu 39.930 OH 80,000 3,194,400
Sub Total (7) 13,201,390
TOTAL PEKERJAAN PASANGAN 105,651,973
Jumlah Biaya Kontruksi 116,252,286
RENCANA ANGGARAN BIAYA

PERHITUNGAN TOTAL BIAYA TENAGA/ BAHAN/ ALAT DAN ADMINISTRASI

Kabupaten : Panitia :
Kecamatan : Jenis kegiatan :
Kelurahan/Desa : Lokasi Kegiatan :
Jenis Pekerjaan :
SUMBER PEMBIAYAAN
NO Uraian Sat. Harga Satuan Volume Total
Total

A. TENAGA KERJA :
1 Pekerja OH 70,000 376 26,337,465
2 Tukang batu OH 80,000 109 8,741,040
SUB TOTAL TENAGA 486 35,078,505
B. BAHAN BANGUNAN :
1 Pembersihan Lahan ls 100,000 1 100,000
2 Pengukuran dan Bowplank ls 100,000 1 100,000
3 Pasir Urug M3 132,000 10 1,341,648
5 Batu belah 15/20 M3 236,000 113 26,728,416
6 Portland Sement Kg 2,000 17,600 35,200,352
7 Pasir M3 326,000 54 17,703,365
SUB TOTAL BAHAN 81,173,780.80
C JUMLAH (A s/d B) 116,252,286