Download as pdf
Download as pdf
You are on page 1of 9
orteco VY, ob 2 PT. PERUSAHAAN GAS NEGARA (Persero) Tbk. Contract No : 000300.PK/243/UT/2006 9 reeres-rerarronnno rte PMC Job No. : 40098 ¢" PT. CITRA PANSI MANUNGGAL Doc No. : $32-K2-82-L-PR-001-A4 SOUTH SUMATRA - WEST JAVA GAS PIPELINE PROJECT PHASE Il - ONSHORE PIPELINE CONSTRUCTION CONTRACT FOR MUARA BEKASI —- RAWA MAJU 32 INCH ONSHORE GAS PIPELINE ROW SURVEY PROCEDURE code 2 Minor Comment Wonk may oct Pine Renin Code 3] Wajr conan Werk may nt ocd essen coda Revew not euiedtor i duct Prosvrement ty HRD. Feat Oe ze ORIGINAL Rev | bate DESCRIPTION BY [oak [Avo | Aevo-[APVD 0 08/06106 ‘Approved For Construction far wae ‘SSW Gas Pipeline Project Phase It Transmission PGN Doc. No ‘Onshore i ‘Muara Bekasi— Rawa Maju SJ2-K2-82-L-PR-001-A4 ROW SURVEY PROCEDURE Rov | Cass | Date: Page 0 | 1 | osiosios | 1 of7 REVISION PAGE Page Revision Description Rev | Date Fax ]Baie osu Witon by ame) | heared by (Name) | Roproved by (Narva) San ° (08706106 | Ralin.M Wanye ‘Mokhlisn | Approved For Construction SJ2-K2-82-L-PROOT-AG Rev 0: ROW Survey Procedure ‘SSWJ Gas Pipeline Project Phase I ‘Onshore Gas Transmission PGN Doc. No ¢" Muara Bekasi - Rawa Maju 8J2-K2-82-L-PR-001-A4 ROW SURVEY PROCEDURE Rev. | Class Date: Page o | t | oalosios | 20t7 CONTENTS 4.0 SCOPE AND PURPOSE 11 Purpose 1.2 Scope 2.0 DEFINITIONS 3.0 SURVEY 3.1 General 3.2 References 3.3 Precedence 3.4 Responsibility 3.5 Procedure Construction Survey Control Horizontal Control Slope Distance Chain age Vertical Control Crossing Detail Survey Trench Centreline Layout Routine Survey Services Equipment Bench Mark Reference 5, 5. Qoarone 5. 5. 5. 5. 40 ATTACHMENT ‘SJ2-K2.62-L-PR.OOT-Ad ROW Survey Procedure

You might also like