orteco VY, ob
2
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.
Contract No : 000300.PK/243/UT/2006
9 reeres-rerarronnno rte
PMC Job No. : 40098
¢" PT. CITRA PANSI MANUNGGAL
Doc No. : $32-K2-82-L-PR-001-A4
SOUTH SUMATRA - WEST JAVA GAS PIPELINE
PROJECT PHASE Il - ONSHORE
PIPELINE CONSTRUCTION CONTRACT
FOR MUARA BEKASI —- RAWA MAJU
32 INCH ONSHORE GAS PIPELINE
ROW SURVEY PROCEDURE
code 2 Minor Comment Wonk may oct
Pine Renin
Code 3] Wajr conan Werk may nt ocd
essen
coda Revew not euiedtor i duct
Prosvrement ty
HRD.
Feat Oe ze
ORIGINAL
Rev | bate DESCRIPTION BY [oak [Avo | Aevo-[APVD
0 08/06106 ‘Approved For Construction far wae‘SSW Gas Pipeline Project Phase It
Transmission PGN Doc. No
‘Onshore
i ‘Muara Bekasi— Rawa Maju SJ2-K2-82-L-PR-001-A4
ROW SURVEY PROCEDURE Rov | Cass | Date: Page
0 | 1 | osiosios | 1 of7
REVISION PAGE
Page Revision Description Rev | Date
Fax ]Baie osu Witon by ame) | heared by (Name) | Roproved by (Narva) San
° (08706106 | Ralin.M Wanye ‘Mokhlisn | Approved For Construction
SJ2-K2-82-L-PROOT-AG Rev 0: ROW Survey Procedure‘SSWJ Gas Pipeline Project Phase I
‘Onshore Gas Transmission PGN Doc. No
¢" Muara Bekasi - Rawa Maju 8J2-K2-82-L-PR-001-A4
ROW SURVEY PROCEDURE Rev. | Class Date: Page
o | t | oalosios | 20t7
CONTENTS
4.0 SCOPE AND PURPOSE
11 Purpose
1.2 Scope
2.0 DEFINITIONS
3.0 SURVEY
3.1 General
3.2 References
3.3 Precedence
3.4 Responsibility
3.5 Procedure
Construction Survey Control
Horizontal Control
Slope Distance Chain age
Vertical Control
Crossing Detail Survey
Trench Centreline Layout
Routine Survey Services
Equipment
Bench Mark Reference
5,
5.
Qoarone
5.
5.
5.
5.
40 ATTACHMENT
‘SJ2-K2.62-L-PR.OOT-Ad ROW Survey Procedure