Product Name Units Start Rec Used End Cost Solids Control Equipment Time
BARACARB 1200 25 kg BAG 109 109 Shaker Drilling
Screens Hrs 17.0
BARACARB 25 1 tonne BAG 3.000 3.000 Brandt\Cobra 80 80 80 80 19.0 Flow Check 2.5
BARACARB 5 25 kg BAG 192 192 Brandt\Cobra 80 80 80 80 19.0 Trips 2.5
BARA-DEFOAM W300 180 kg DRUM 1 1 Circulating 2.0
Brandt\Cobra 80 80 80 80 19.0
Coring
BARAZAN D 25 kg BAG 212 6 206
CutOffDrilling
BARITE 41 - 1.5 TON 1.5 TON BAG 8.000 3.000 5.000
Dir Work
BAROFIBRE 25 lbm BAG 56 56 Fishing
BAROLIFT 15 lbm BOX 62 62 Logging
BARO-TROL PLUS 50 lbm BAG 36 36 Hydrocyclone Cones Screens Hrs N. Up BOP
BDF-690 - 25 KG BAG 25 KG BAG 99 99 Desander 3- Plug Back
BENTONITE 1 tonne BAG 2.000 2.000 DESILTER 16 - Reaming
BXR L 55 Gal DRUM 4 4 Repair
CALCIUM CARBONATE FINE 1 tonne BAG 14.000 14.000 Other
CALCIUM CARBONATE COARSE 1 tonne BAG 9.000 9.000 Centrifuge Speed Feed Rate Hrs Total 24.0
CALCIUM CARBONATE MED 1 tonne BAG 7.000 7.000 Centrifuga 2800 0.00 15.0 Rotating 17.0
CAUSTIC SODA 25 kg BAG 94 2 92 ROP 9.9
CITRIC ACID 25 kg BAG 75 75 Dil Rate
CON DET E 200 kg DRUM 8 8 Fluid Volume Breakdown Primary Active Fluid: Gel/Polymer
DEXTRID LTE 25 kg BAG 165 10 155 Active m3 Additions m3 Losses m3
EP MUDLUBE 55 Gal DRUM 15 15 Annulus 71.36 Base Fluid Dumped
EZ SPOT 55 Gal DRUM 8 8 Pipe Cap 3.39 Drill Water 79.22 Transferred
EZ-MUD 25 kg CAN 26 26 Total Hole 131.56 Dewatering SCE -7.00
EZ-PLUG 40 lbm BAG 360 360 Active Pits 95.00 Sea Water Downhole -55.00
GEM GP 220 kg DRUM 4 4 Total Circ 169.74 Whole Mud Misc Other
LIME 25 kg BAG 40 40 Reserve* 153.41 Barite
MICA COARSE 25 kg BAG 30 30 Prev Vol* 362.33 Chemicals 0.43
MICA FINE 25 kg BAG 120 120 Net Change* 17.65 Other
MICROBIOCIDE 20 L PAIL 24 24 Total Vol* 379.97 Total 79.65 Total Losses -62.00
N-SEAL 30 lbm BAG 20 20
Active Fluid Type Vol m3 Deviation Information
Daily Products Cost $0.00 Total Daily Cost $0.00 Primary Active In Hole Reserve Survey Date
Cumulative Products Cost $0.00 Total Cumulative Cost $0.00 þ Gel/Polymer* 131.56 153.41 Survey MD m
AMRO MOSTAFA SALAMA SAMIR CHERFOUH ¨ KCl/Polymer/GEM 60.00 Survey TVD m
Baroid Representatives
¨ LCM pill #1 14.00 Angle º
Office Telephone ¨ LCM pill #2 2.50 Direction
Warehouse Telephone Horiz Displ. m
This report, the software, any data contained in this report and any interpretations based on this report are offered “as-is” and ”where-is.” There are no representations or warranties, expressed or implied, including implied warranties of merchantability and/or fitness for a particular purpose and or non-infringement. In no event will
Halliburton or its affiliates or suppliers be liable for any damages, whatsoever, including, but not limited to direct, indirect, consequential, incidental, special, punitive or exemplary damages (including, without limitation, loss of data, profits or use of hardware or software). Customer uses at their own risk.
Daily Drilling Fluid Report API No: BOQECR9AGCAT2VB4 Report No: 006
Date 12-02-2018 11:59:00 PM Well Name ZB-366 Spud Date 11-27-2018
Operator ENI DGS - 002,ZUBAIR Country Iraq Depth (MD/TVD) 983.00 / 982.00 m
Operator Rep Mohamed Miri,Pasquale Zingarelli State Al Basrah Rig Name KCADT-210
Contractor KCA DEUTAG DRILLING GMBH County Rig Activity Flow Check
Contractor Rep Mohamed Ali Field or Block Zubair Field Unit System WSE API(Copy)
Fluid Treatments
* Run all solid control equipment included the centrifuge to cut mud weight .
* Treated rheology by addition of Barazan-D as requested .
• Drill 12 1/4" Pilot Hole From 815m To 983m with controlled parameters, at 817m observed well losses +/- 6 m3/h Pump on fly 5 m3 80 ppLCM ( Total Lost 2 m3 ); After LCM Pill
No losses in well observed.
• Pumped 5m3 HiVis & Circulate hole clean
• Flow check: Well Static, POOH to Shoe at 740m freely. Well static, no losses.
• Pumped 5m3 HiVis & Circulate hole clean, Observed 15 m3/hr dynamic down hole losses.
• Flow check, Static losses 4.2 m3/h
• RIH freely @ 850 m. Running speed at 5min. each stand observed no volume return, 11 m3/hr Down hole losses.
• Spot 20 m3 LCM 120 ppb Displaced with 7 m3 of drilling mud, POOH F/850m To 500m & Flush String, down hole losses 12m3/h
• Flow check, fill up well after one/hr, 14 m3/h Static Losses.
• Total loss in the day 55 m3
This report, the software, any data contained in this report and any interpretations based on this report are offered “as-is” and ”where-is.” There are no representations or warranties, expressed or implied, including implied warranties of merchantability and/or fitness for a particular purpose and or non-infringement. In no event will
Halliburton or its affiliates or suppliers be liable for any damages, whatsoever, including, but not limited to direct, indirect, consequential, incidental, special, punitive or exemplary damages (including, without limitation, loss of data, profits or use of hardware or software). Customer uses at their own risk.