Professional Documents
Culture Documents
Piping - Format Baku
Piping - Format Baku
BLOCK 2, 3 & 4
ADD-ON
PROJECT
WELD TRAVEL SHEET
Contractor : PT. Hutama Karya Date :
Sub Contractor : PT. JEL Service :
Area : P & ID No. :
Test Package No. : Page No. :
NOTE : RT (Radiography Test), UT (Ultrasonic Test), DPT (Dye Penetrant Test), MPT (Magnetic Particle Test), SW (Shop Weld), BW (Butt Weld), FW (Fillet Weld), BC (Branch Connection Weld), TRD (Thread Connection)
FINAL ACCEPTANCE
Prepared by, Checked & Inspected by, Approved by,
PT. Hutama Karya PT. Reconsult PT. PJB UBANG
Name Name Name
ADD-ON PROJECT
DAILY WELDING REPORT FOR PIPING - Q1-L.01
Area : P & ID No. :
RFI No. : Iso. Dwg No. :
Report No. : Line No. :
Page No. : Service :
Weld Type
Fit-Up Visual Weld
BW/ Welder
Material Component Material Spec. NPS Sch Joint No WPS No. Welding Date Remarks
FW/ Stamp
TRD Acc Reject Acc Reject
Seamless Pipe A53-B 1 80
BW 1
Concentric Reducer Cl. 3000 A105 1.5 x 1 80
Total : Jts
Prepared & Inspected by, Checked & Inspected by, Approved by,
PT. Hutama Karya PT. Reconsult PT. PJB UBANG
Name Name Name