MUARA TAWAR CCPP

BLOCK 2, 3 & 4
ADD-ON
PROJECT
WELD TRAVEL SHEET
Contractor : PT. Hutama Karya Date :
Sub Contractor : PT. JEL Service :
Area : P & ID No. :
Test Package No. : Page No. :

Dwg No. : Line No. :


Weld Type
Welding RT (Report No.) UT/
Material Component Material Spec. NPS Sch BW/ Joint No. WPS No. PWHT PMI HB Remarks Mark
FW/ Welder Visual MPT/
TRD Date Acc Reject Acc Reject Acc Reject DPT
Stamp Inspection
Seamless Pipe A53-B 1 80
BW √ 02/QC/WPS/RE/11 20-Oct-12 WR-20 Acc
Concentric Reducer Cl. 3000 A105 1.5 x 1 80

NOTE : RT (Radiography Test), UT (Ultrasonic Test), DPT (Dye Penetrant Test), MPT (Magnetic Particle Test), SW (Shop Weld), BW (Butt Weld), FW (Fillet Weld), BC (Branch Connection Weld), TRD (Thread Connection)

FINAL ACCEPTANCE
Prepared by, Checked & Inspected by, Approved by,
PT. Hutama Karya PT. Reconsult PT. PJB UBANG
Name Name Name

Signature Signature Signature

Date Date Date


Mark Material Component Material Spec. NPS Sch
MUARA TAWAR CCPP
BLOCK 2, 3 & 4

ADD-ON PROJECT
DAILY WELDING REPORT FOR PIPING - Q1-L.01
Area : P & ID No. :
RFI No. : Iso. Dwg No. :
Report No. : Line No. :
Page No. : Service :

Weld Type
Fit-Up Visual Weld
BW/ Welder
Material Component Material Spec. NPS Sch Joint No WPS No. Welding Date Remarks
FW/ Stamp
TRD Acc Reject Acc Reject
Seamless Pipe A53-B 1 80
BW 1
Concentric Reducer Cl. 3000 A105 1.5 x 1 80

Total : Jts

Prepared & Inspected by, Checked & Inspected by, Approved by,
PT. Hutama Karya PT. Reconsult PT. PJB UBANG
Name Name Name

Signature Signature Signature


Date Date Date
Fit-Up Fin
Joint No WPS No. Welding Date
Welder
Stamp Acc Reject Acc
1
Final Visual
Remarks
c Reject