‫بسم الله الرحمن الرحيم‬

‫شـركة دانفــــــــــوديو للمقاولت و الطرق والجسور‬


Contracting, RODS & BRIDGES CO. LTD
‫ام كدادة‬-‫مشروع طريق الفاشر‬ Project : Elfashir Um Kadada Road
Description : Sub grad (6+250 to 6+800)

Unit wt.of sand : 1.33 DATE: 2/24/2010


DENSITY:
Station 6+300 6+450 6+550 6+625 6+750
Ref. To Center R L C L R
Layer Subgrade Subgrade Subgrade Subgrade Subgrade
Depth 15Cm 15Cm 15Cm 15Cm 15Cm
Wt.Of Wet Soil 5003 4669 4533 6235 5617
Wt.Of Sand used + Cont 7000 7000 7000 7000 7000
Wt.Of residual sand + Cont 4382 4052 4155 5052 4718
Wt.Of sand to fill cone 1519 1538 1648 1519 1538
Wt.Of sand to fill Hole 2863 2514 2507 3533 3170
Cross Vol Of hole 2153 1890 1885 2665 2391
et Unit Of Soil 2.32 2.47 2.40 2.34 2.35
Dry Unit Wt Of Soil 2.20 2.36 2.30 2.22 2.24

MOISTURE CONTENT:
Bottle No. K T 220 23 33
Wt Of wet soil + bottle 280.4 275.2 285.3 268.6 357.1
Wt Of dry soil + bottle 266.8 263.9 273.8 256.1 342.2
Wt Of bottle 25.3 24.9 25.1 25.1 25.6
Wt Of dry soil 241.5 239.0 248.7 231.0 316.6
Wt Of moisture 13.6 11.3 11.5 12.5 14.9
Moisture contet 5.6 4.7 4.6 5.4 4.7

COMPACTION TEST:
Max dry density 2.27 2.27 2.27 2.27 2.27
Optimum MC 4.2 4.2 4.2 4.2 4.2
% Compaction 97 104 101 98 99
required Compaction

Remark : _________________________________________________________________________

__________________________________________________________________________________

…………………… …………...…………
For contractor For consultant