Professional Documents
Culture Documents
Design Standards 3
Design Standards 3
CHECKED BY:
SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE ENGINEER II (Building Coordinator) 1
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO COVER PAGE SUBMITTED BY: DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO A 1
AUGUSTO T. VIRAY,JR. SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO ARCHITECT II
AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OIC-CHIEF ,PLANNING & DESIGN SECTION
DISTRICT ROAD MAP
MINDORO OCCIDENTAL I DISTRICT ENGINEERING OFFICE REPUBLIC OF THE PHILIPPINES
Mamburao, Occidental Mindoro OFFICE OF THE CITY/MUNICIPAL
TABLE OF CONTENTS ENGINEER/BUILDING OFFICIAL
DISTRICT/CITY/MUNICIPALITY
N
PALUAN LAND USE AND ZONING
ARCHITECTURAL
MAMBURAO
SANTA CRUZ
A -1
PERSPECTIVE
LOCATION MAP
TABLE OF CONTENTS
SITE DEV'T. PLAN
LINE & GRADE
A -2
GROUND FLOOR PLAN
CALINTAAN
RIZAL A -3
LONGITUDINAL ELEVATION
CROSS ELEVATION
SAN JOSE LONGITUDINAL SECTION ARCHITECTURAL
CROSS SECTION
MAGSAYSAY
S-2
ROOF FRAMING PLAN
SANITARY
S-3
DETAILS
S-4
ELECTRICAL
00
6.
STRUCTURAL NOTES
4 00
6.
G
3
IN
UZ LD
CR UI
A. E B
2
ST OS
00
IN RP
6.
AW -PU
UL LTI
. M MU
GY F
BRST. O
N
CO
B .0
0
20
MECHANICAL
CHECKED BY:
PREPARED BY: SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE PERSPECTIVE ENGINEER II (Building Coordinator) 2
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO VICINITY MAP SUBMITTED BY: DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO SITE DEV'T. PLAN A 2
LOCATION PLAN AUGUSTO T. VIRAY,JR. SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
ARCHITECT II
AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO OIC-CHIEF ,PLANNING & DESIGN SECTION
30.00
1 2 3 4 5 6
6.00 6.00 6.00 6.00 6.00
20.00
CHECKED BY:
PREPARED BY: SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE ENGINEER II (Building Coordinator) 3
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO
SUBMITTED BY: DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO GROUND FLOOR PLAN A 3
AUGUSTO T. VIRAY,JR. SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
ARCHITECT II
AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO OIC-CHIEF ,PLANNING & DESIGN SECTION
30.00
1 2 3 4 5 6 A B
6.00 6.00 6.00 6.00 6.00 20.00
3.51
0.50
1.50
5.79
4.90
0.20
1.60
1.25
LONGITUDINAL ELEVATION CROSS ELEVATION
2.00
30.00
1 2 3 4 5 6 A B
6.00 6.00 6.00 6.00 6.00 20.00
0.23
5.26
3.51
9
4.7
0.50
1.31
5.79
4.90
0.20
1.60
1.25
LONGITUDINAL SECTION 2.00
CROSS SECTION
CHECKED BY:
PREPARED BY: SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING LONGITUDINAL ELEVATION JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
CROSS ELEVATION
ENGINEER II (Building Coordinator) 4
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO
SUBMITTED BY: DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO LONGITUDINAL SECTION A 4
CROSS SECTION AUGUSTO T. VIRAY,JR. SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
ARCHITECT II
AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO OIC-CHIEF ,PLANNING & DESIGN SECTION
30.00
1 2 3 4 5 6
6.00 6.00 6.00 6.00 6.00
B
COLUMN SCHEDULE
600
400
20.00
0.50
A
0.25
FOUNDATION PLAN
SCHEDULE OF FOOTING
CHECKED BY:
PREPARED BY: SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING FOUNDATION PLAN JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE WALL FOOTING- 1 ENGINEER II (Building Coordinator) 5
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO
COLUMN SCHEDULE SUBMITTED BY: DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO S 1
TYP. FOOTING DETAIL SALVADOR E. ABAD
SCHEDULE OF FOOTING AUGUSTO T. VIRAY,JR. JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO ARCHITECT II
AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OIC-CHIEF ,PLANNING & DESIGN SECTION
CANTILEVER L1 L2
SPACING OF STIRRUPS
TYP R.C. BEAM ELEVATION
A- 10 MM STIR. 1 @ 0.05,6 @ 0.10,4 @ 0.15,2 @ 0.20 REST @0.30
B- 10 MM STIR. 1 @ 0.05,6 @ 0.10,4 @ 0.20, REST @ 0.30
B B B
EXTRA BOTT BARS
TOP BARS @ SUPPORT TOP BARS
20.00
D
EXTRA BOTT BARS
BOTT BARS BOTT BARS @ MID-SPAN
SIZES REINFORCEMENTS
BEAM SPACING
WIDTH DEPTH BAR 'A' BAR 'B' BAR 'C' EXTRA TOP BAR 'D' EXTRA BOTT OF
MARK
A STIRRUPS
B D CONT TOP CONT BOTT EXT SUPP INT SUPP EXT SPAN INT SPAN
CHECKED BY:
PREPARED BY: SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE ROOF FRAMING PLAN ENGINEER II (Building Coordinator) 6
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO
MAMBURAO, OCCIDENTAL MINDORO
SCHEDULE OF BEAM SUBMITTED BY: DPWH-IV-B
S 2
AUGUSTO T. VIRAY,JR. SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO ARCHITECT II AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OIC-CHIEF ,PLANNING & DESIGN SECTION
W
L2
L1
.05
0.25
A
PARTS
8- EQUAL
3.51
5.26 @
1.20
RTS 0.50
L PA
QUA
8-E
9@
0.50
4.7
0.350
0.40
0.175
1.50
PLAN
SPOT DETAIL
5.79
4.90
SPOT DETAIL
0.20
0.18
0.30
DET.ELEVATION OF T-1
ELEVATION
CHECKED BY:
PREPARED BY: SUBMITTED BY: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
REGION IV - B MIMAROPA CONST. OF MULTI-PURPOSE BUILDING JOHNNY USI
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE ENGINEER II (Building Coordinator) 7
OFFICE OF THE DISTRICT ENGINEER BRGY. TALABAAN MAMBURAO
SUBMITTED BY: DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO DETAILS S 3
AUGUSTO T. VIRAY,JR. SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY. 9, MAMBURAO OCC.MINDORO ARCHITECT II
AMELIA PAZ D. VASQUEZ ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
OIC-CHIEF ,PLANNING & DESIGN SECTION
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO
20/12/2016 11:26:54 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER CONSTRUCTION OF MULTI-PURPOSE BLDG. ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE BRGY. TANGKALAN, MAMBURAO,
1
ENGINEERING ASST. DPWH-IV-B
OCC. MINDORO
MAMBURAO, OCCIDENTAL MINDORO CHECKED BY:
JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ROAD MAP
MINDORO OC CIDEN TAL I DIS TRICT ENGI NEERI NG OFFICE
Mamburao , Occ id ental Mindoro
Del MontePt.
TABLE OF CONTENTS
REPUBLIC OF THE PHILIPPINES
t.
Bagolayag Pt. o P as
Pt. int
io gu Tom lang ag g
o. il La y Bato na
M ananao Bar Gui St Ano o
Bas toang an Bal
Bag Talipanan
Bat as Lau
Agsigang an tar
Calagian Api ona il Lucut an
az Or Ban 68
I ba Am Camurong
Cabignayan 67
Mt. C
abign
ayan Wawa
Udalo
65 66 M at ab
ang
M adu
ron ABRA DE ILOG Aluyan
64
ENGINEER/BUILDING OFFICIAL
PALUAN CamtasPt.
M ason
Baclaran
51
R. Culanguan
n 50
a so
M 49
a R. Baluguhan
M amar Cabacao
Tubili
Balibago 48 98 Lanas Lake b ala n R .
Esteban S inam
Balant oy
47
M aslud 46
Binarira Pt.
M asl ud R .
45
Tangkalan
I gsuso
A1
I gsuso Pt . Cabiguan
44 San Luis
Ligang
43
M at a
m ayor
42 Santol M t . Mic
m ic
Tagawangawan Sinam balan
Banilad
n R.
41 Payompon
BalongM oro ng a
OR
DISTRICT/CITY/MUNICIPALITY
Bagraan i
l tu
Dapi A
40 Liliw
MAMBURAO Balansay
M imping 39
38
Lagundian
Lagnas
37
Lanas
36 Sahing
Calam intao OC IE
M aculbo
M aculboPt.
Baranggit
Bangayan
. t ogo
R Pi
CI NT
Cigaras
Calum bayan P
a
gb
ah
an
Curt inganan DE AL
Talabaan
35
Alacaak
Culisan
Lanas
NT MI
PERSPECTIVE
97
San Vicente
34
33 93
96
94
Kabungahan
Aribugan
95 Carumbac
Kawayaanan
O ring
R.
AL ND
SANTA CRUZ
92
M ulawin 91
Casague
90
. Kabanabahan
Lusacan
B
o
ca
ya o
MI OR
R
ND O
R.
a n
32 la g
a
Lum angbayan
R.
t ni
S
OR
R
31 89 M a m a l i .
in
y
Pola Banganay
na
LOCATION MAP
30 Eagle Pa s s
P
29 Ime
ra
m
O
A
Calanguan n R.
Anayasan ve
Balat ikan Amnay o
R
Dayap
Barahan Bugtong Kawayan M t. Fa c h et
Pinagt urilan
28
VICINITY MAP
Bahay Par i rick R.
A m n ay R. Pat
El Dorado
Vict oria
Celina
Cansaya
P andan R
Paikot
.
Pagasa
PulongG ago
Pait an
Vi
27
San Agust in
R a y u s an R .
C a t he r i n e R.
Bangor Pass
LAND USE AND ZONING
SITE DEVELOPMENT PLAN
g a
Tagumpay R .
Pandan San Fr a
ncisco g
.
R
p on
o m
San Vicente M
I bud
d R. 26
25 I bu
24
Sto. ño
Ni Tulaong R.
88
Tabtaban Lake
TABLE OF CONTENTS
Buenavista
23 87
SABLAYAN 22
21
Batong Buhay
86
Tuburan
Arellano
84 85
Lula 82 SABLA YAN PENA L CO LO NY
Tuban
20 18 83
8081
BARO K AN-SA HING
79
Sta. ucia
L 78
M alisbong
19
Pandanan E. Aguinaldo 17
DongonPt. Ligaya
t.
P
on
ng
THIS SITE
o
D
Burgos
I r ir on B ay
16
15
Concepcion
14
M alpalon Sapaton
77 76
Poypoy
A2
Tabonac
Piri
I riron 13
75
Patay Ilog
Balagbagan
74
M ano
ot
12
73
New Dagupan
FLOOR PLAN
Niyayos Tanyag
G utad
M alatikwang Aguas M ont e Claro
CALINTAAN Cahagnayon
72
71
11 Rizal Batasan
M alawaan
Pit ogo
M agsikap
Salvacion M ang
at
FRONT ELEVATION
10
RIZAL San Pedro
09
Sto. ño
Ni
08
Rumbang Centr al M urtha
Adela Canwaling
Camburay
Alitayt ayan
San Agust in
La Cu
rv a Baulan
Bubog M agbay
Bayotbot
Paclolo 69
SIDE ELEVATION
R.
M abini
Bagong
guray
Sikat
70 05
07 Labangan 04 M apa
ya
Ca
G apa
san
San Roque
Lourdes
03
Caminawit
G amot
M angarin Bay
MAGSAYSAY 02
Nicolas
M anga Labangan Bulo
I
Caguray 01
li n
Bukad Bukad Pucatod Bagaas
Ansiray
A3
Tikod Sibalat
St r
Bunuaga
Lipat
Bunuaga
I ling P
roper
a
I L uiod
G
IG
N Last e
it
Sta. Theresa
IS
Bankal .
Buluang Pt . Bungkalan
Undaque M unt u
rido
Ambulong Batong Salam aga Alibog
AMBULONG I S. M anukan
I nasakan
Catayungan
Bagocog
G ARZA I S.
Dumalaga Natandol
Pabuga
n Pt . BURI I S.
Tabal
S il a n g Ba y Cabaong
Pawican
Pawican Pt .
M agirom
Bugias M angaag
ui Pt.
I ling Pt.
ARCHITECTURAL
PERSPECTIVE S1
STRUCTURAL NOTES
S2
STRUCTURAL
FOUNDATION LAYOUT
FOOTING SCHEDULE
N N FOOTING DETAILS
COLUMN SCHEDULE
BEAM DETAILS
RA
STRUCTURE
RA
AB
S3
AB
TO
ELECTRICAL
TO
S4
TRUSS DETAILS
AO
O
TO
MA
A
UR
MB
MA
TO
SANITARY
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER CONSTRUCTION OF MULTI-PURPOSE BLDG.
ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE
BRGY. TANGKALAN, MAMBURAO, ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO OCC. MINDORO CHECKED BY:
JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : SABLAYAN, OCC. MDO. ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2
18.00
9.00 9.00
46
5.
5.00
5.00
3
S4
8.60
8.60
TOP OF BEAM
D 3.60
3.40
3.60
3.60
2
A3
0.00
-0.20
FRONT ELEVATION
C
2 1 : 100
GA#26 PRE-PAINTED RIB-TYPE
G.I. SHT.ROOFING
D C B A
CONCRETE PAVEMENT
6.00
B APEX OF TRUSS
8.40
8.60
5.00
6.00
8.60
TOP OF BEAM
3.40
3.60
A
3.60
NAT. GRADE LINE
FLOOR PLAN 0.00
-0.20
1 1 : 100
20/12/2016 11:26:58 AM
1 : 100
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER PERSPECTIVE
CONSTRUCTION OF MULTI-PURPOSE BLDG. ARDEE D. EUGENIO A2
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE LOCATION MAP ENGINEERING ASST.
BRGY. TANGKALAN, MAMBURAO, VICINITY MAP DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO OCC. MINDORO CHECKED BY:
SITE DEVELOPMENT PLAN AMELIA PAZ D. VASQUEZ
JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO
TABLE OF CONTENTS ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2
18.00
9.00 9.00
1 2
STRUT
1. 72
5.00
5.00
STRUT
R1
D
8.60
8.60
TOP OF BEAM
BEAM BEAM 3.40
3.60
3.60
3.60
6.00
C CROSS SECTION
2 1 : 100
6.00
APEX OF TRUSS
8.40
8.60
STRUT STRUT STRUT
5.00
8.60
TOP OF BEAM
ROOF PLAN 3.60
3.40
1 1 : 100 BEAM BEAM BEAM
3.60
LONGITUDINAL SECTION
3 1 : 100
20/12/2016 11:26:59 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER CONSTRUCTION OF MULTI-PURPOSE BLDG. PERSPECTIVE ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE LOCATION MAP A3
BRGY. TANGKALAN, MAMBURAO, ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO OCC. MINDORO VICINITY MAP CHECKED BY:
SITE DEVELOPMENT PLAN JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO TABLE OF CONTENTS ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
30 BAR DIA. 30 BAR DIA.
VERIFY DEPRESSION
(min.) (min.)
TABLE OF LAP SPLICE & ANCHORAGE LENGTH NOTES:
MAIN REINFORCEMENTS TO BE
CONTINUOUS (TOP & BOTT. BARS) CONSTRUCTION NOTES
D=FOR BEAM
t=FOR SLAB
4- 16 VERT. BARS
1. YIELD STRESS OF HOOPS = 40 KSI WHERE JOINTS IS AT POINT OF
STRESS, PROVIDE SHEAR RODS
BAR SIZES LAP SPLICES LENGTH ANCHORAGE
550
2. D = USE MAXIMUM COLUMN DIMENSION, WITH ENGINEERS APPROVAL A. GENERAL
550
(MM) TYPE "A" TYPE "B" LENGTH (M) 1/6 CLEAR HEIGHT OR 18" (450mm) 1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR
30 BAR 50 30 BAR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
0.60 WHICHEVER IS GREATER.
10 0.40 0.30 (MIN.) (MIN.)
3. NUMBER OF HOOP TIES SAME AS PER D=FOR BEAM 2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS
D/3
12 0.45 0.35 0.60 COLUMN TIES SCHEDULE. 550 2t=FOR SLAB IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION.
D/3
D
16 0.61 0.40 0.60 4. ALL CONCRETE REINFORCEMENT DETAIL 4- 16 VERT. BARS 30 BAR DIA. (min.) 3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN CHECK WITH MECHANICAL
D/3
SHOULD BE DONE IN ACCORDANCE WITH AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE SLEEVES, ETC., TO BE EMBEDDED IN CONCRETE.
20 0.76 0.56 0.60
ACI DETAILING MANUAL 1980 PUB SP-66
BEAM TYPICAL DETAIL FOR BEAM 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING & BRACINGS OF THE
25 1.10 0.90 0.68
TYPICAL SLAB & BEAM OR SLAB CHANGE SOFFIT STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION.
28 1.40 1.20 0.86
1.12 H
550 CONSTRUCTION JOINT DET. DOWEL BARS TO
B. CONCRETE & REINFORCEMENT
32 1.90 1.40
FLR. SLAB OR BEAM MATCH VERT. BARS 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING CODE OF AMERICAN
36 2.41 1.84 1.43 CROSS-TIE
TYPICAL CONNECTION DETAIL CONCRETE INSTITUTE (ACI-318).
(DOWEL)
350mm. MAX.
12x1000 LONG AT
NOTES: OF R.C. WALL AT CORNERS 1. ALL JOINTS AND CELLS 2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT (28) DAYS
400
VERIFY ARCHITECTURAL
MID-DEPTH OF SLAB
1. TYPE "A" BUNDLED BARS AT EACH CORNER CONTAINING REINFORCING W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS.
H
10
TYPE "B" INDIVIDUAL BARS BARS SHALL BE FILLED
dm
2. NOT MORE THAN 33% OF THE BARS SHALL BE WITH CONCRETE GROUT. LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP
in.
MAIN REINFORCEMENTS 1- 12 TOP &
SPLICED WITHIN THE REQUIRED LAP LENGTH TO BE CONTINUOUS BOTT. BARS 2. FOR REINFORCEMENTS SEE
FOUNDATION FOOTING 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
CONSTRUCTION NOTES.
CONF. REINF.
10x1000 LONG ELEVATOR SHAFT 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
JOINT HOOP SPACE @ "2Sh" WHEN @ 300 O.C.
400
COLUMNS 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
(DOWEL)
THERE ARE BEAMS HAVING WIDTH OF 40 1- 16 CONT. HOR. BARS
400
D JOINT REINF. D
AT LEAST ONE-HALF THE COLUMN FOR FLOOR SLAB ONLY BEAMS, SLABS 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
t/3 t/3
LAP SPLICE LENGTH: WIDTH & DEPTHS NOT LESS THAN SLAB 38mm SLAB ON GRADE 17.2 Mpa(2500 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
t/3
t
AT ANY LEVEL NO MORE THAN THREE QUARTERS OF THE DEEPEST OPENING CLEAR
BEAM THAT FRAME INTO FOUR PLAN 3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 33 FOR DIAMETER 12 & SMALLER BARS
ALTERNATE BARS SHOULD BE CONF. REINF.
SPLICED. MIN. DISTANCE BET. SIDES OF THE COLUMN. ALL OTHER TYP. SECTION OF MASONRY AND GRADE 40 FOR DIA. 16 AND LARGER BARS.
400
CONF. REINF. TIES LAT. TIES H (CLEAR HEIGHT OF COL.)
MAIN REINFORCEMENT
TWO ADJACENT BARS SPLICES CONDITIONS USE HOOPS @ "Sh" CENTERS.
Sh
PARTITION REINFORCEMENTS 4. IN GENERAL THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING REINFORCED
t OR 1/4 D
SHALL BE 600mm. CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN OR NOTED.
SLEEVES FOR UTILITY
t
IN TWO WAY SLAB EXTEND
WITHIN CENTER
COLUMN TIES AS
L
PER SCHEDULE
D
BARS UP TO BEAM SUPPORT
FOR COL. BAR SPLICES SEE TABLE DOWN INTO EDGE BEAM. EXTENDED
0.25L OMIT TRIMMER BARS WHERE 4- 12@ 1800 LONG TOP BARS BEND SUSPENDED SLABS ----------------------------- 3/4 IN. (19 MM)
OF MIN. LAP SPLICE LENGTH OF PROVIDE 3- 10 EXTRA STIRR.
TOP BARS @ SUPPORT (CONT.) COLUMN REINFORCEMENT EACH SIDE OF SLEEVES
OPENING IS FRAMED BY BEAM BARS MIN. OF 1,200 (4'-0") INTO BARS. SLAB ON GRADE ------------------------------- 1 1/2 IN. (38 MM)
4- 12 BOTT. BARS WALLS ABOVE GRADE ---------------------------- 1 IN. (25 MM)
REQ'D. BOTT. BARS @ SUPPORT
TYP. DET. FOR SLEEVES TYP. SLAB OPENING DET.
CONF. REINF.
BEAM STIRRUPS AND COLUMN TIES --------------------- 1 1/2 IN. (38 MM)
JT. REINF.
0
EARTH BUT POURED AGAINST FORMS -------------------- 2 IN. (50 MM)
60
NOTE:
ALL CONCRETE REINF. DETAIL SHOULD WHERE CONCRETE IS DEPOSITED
0
60
Dbar DIRECTLY AGAINST EARTH -------------------------
BOTTOM BARS BE DONE IN ACCORDANCE WITH ACI 3 IN. (75 MM)
0.165L SPLICE AT MID SPAN
CONF. REINF.
60
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & SECURED IN PLACE
0
TYP. DETAIL OF COL. LAP SPLICE TYPICAL COLUMN ELEV. SHOWING BAR DIAMETER
Dbar
MINIMUM BEND
RADIUS R
EXTENSION
LE TYPICAL CORNER SLAB DETAIL PRIOR TO PLACING OF CONCRETE.
& EXT. GIRDER TO COL. CONNECT. DOWELS AND TIES SPACING 10 TO 25 3Dbar 12Dbar
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENT'S AND
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
28 TO 36 4Dbar 12Dbar NOTE:
PROVIDE THESE ADDITIONAL BARS FOR 9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY AFTER
400
BEAMS -----------------------------------
400
BARS TYPICAL WHERE DEPRESSED FOOTING OR SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS, AND DOWELS
300 300 SLAB OCCURS
(DOWEL)
DOWEL
DOWEL
400
400
400
CHB VERTICAL BARS 6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUT
600 (MIN.)
250
250
(DOWEL)
ELEVATION 3- 10 BOTT. BARS D. FOUNDATION
6- 10 BARS (AS SHOWN)
INTERSECTION WALL INTERSECTING R.C. COL. OR WALL 10 BOTT. BARS @ 300 O.C. 1. FOUNDATION DESIGN WAS BASED ON ASSUMED SOIL BEARING CAPACITY OF 95.76KPA
TYP. DET. OF LINTEL BEAM 400 400 400
TYPICAL CONNECTION DETAIL OF MASONRY WALL AT CHB WALL OPENING TYPICAL CHB FOOTING DETAILS ( WHERE APPLICABLE )
20/12/2016 11:26:59 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER PERSPECTIVE
CONSTRUCTION OF MULTI-PURPOSE BLDG. ARDEE D. EUGENIO S1
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE LOCATION MAP ENGINEERING ASST.
BRGY. TANGKALAN, MAMBURAO, VICINITY MAP DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO OCC. MINDORO CHECKED BY:
SITE DEVELOPMENT PLAN AMELIA PAZ D. VASQUEZ
JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO
TABLE OF CONTENTS ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
SCHEDULE OF FOOTI NG
FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS
FOOTING
MARK LENGTH WIDTH DEPTH Thickness BAR X BAR Y
(L) (W) (D) (t)
1 2
F-1 1600 1600 1800(ver.) 250 7 - 16mm 7 - 16mm SQUARE FOOTING
SQUARE FOOTING
18.00
L
NGL
C1F1 C1F1
D
6.00
Y-BARS
Y-BARS
X-BARS
X-BARS
C1F1 C1F1
t
C
100
PLAN
L
100 mm THICK
GRAVEL BEDDING
SECTION
18.00
6.00
B C-1
250 250 250
600
6.00
500
500
500
300
C1F1 C1F1
A
MAIN BAR: 8-Ø16mm
SUPPORT MID SUPPORT
TIES : Ø10 mm
1@50, 3@100, REST @ MAIN BAR: 4 - Ø16mm TIES : Ø10 mm
FOUNDATION LAYOUT 150mm TO CENTER EXTRA BARS @ SUPP. : 2 - Ø16mm 1@50, 3@100, REST @
1 1 : 100 EXTRA BARS @ MID : 2 - Ø16mm 150mm TO CENTER
20/12/2016 11:27:00 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER
FOUNDATION LAYOUT
CONSTRUCTION OF MULTI-PURPOSE BLDG. ARDEE D. EUGENIO S2
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE FOOTING SCHEDULE
ENGINEERING ASST. DPWH-IV-B
BRGY. TANGKALAN, MAMBURAO, FOOTING DETAILS
MAMBURAO, OCCIDENTAL MINDORO OCC. MINDORO CHECKED BY:
COLUMN SCHEDULE AMELIA PAZ D. VASQUEZ
BEAM DETAILS JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
2-16 Ø MM MAIN CONT. BARS
2-16 Ø MM
L2 L3
0.90
THIS PORTION THIS PORTION
D
TRUSS
BEAM
STRUT
STRUT
STRUT
G
IN
E C
6.00
BEAM
KL RA
U SB
L2/5 L2/5 L2/5 L2/5
NB S
C
R RO
2-16 Ø MM
TU C
A
TD DI
W MM
2-16 Ø MM MM MAIN CONT. BARS
12
/S
C
TRUSS
12MM DIA PLN BAR SIGSAG BAR BEAM DETAILS
W/STD. NUTS & WASHER
2 NTS
STRUT
STRUT
BEAM
STRUT
19.70
BEAM
6.00
STRUT
STRUT
G
2LS 63.00 X 63.00 X 6.00 MM 63 200 60 4.85
IN
STRUT
BEAM
E C
BEAM
6.00
KL RA
U SB
NB S
C
R RO
TU C
TRUSS
VERIFY
k)
th
m
ROOF FRAMING PLAN
6m
1
x
m
3m
1 : 100 SEE SPOT DETAIL-4
x6
m
SPOT DETAIL
3m
-( 6
2 EQUAL PANEL @ 1.966 = 5.898 M.
1L
DET. ELEVATION OF STRUT-1
k)
th
m
6m
x
m
3m
x6
m
3m
-( 6
1L
1-(63mm x 63mm x 6mm thk)
4.85 MM THK WELD
SPOT DETAIL
STEEL CONNECTION DET.
3 NTS
20/12/2016 11:27:00 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER CONSTRUCTION OF MULTI-PURPOSE BLDG. ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE ROOF FRAMING PLAN S3
ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO
BRGY. TANGKALAN, MAMBURAO, BEAM DETAILS CHECKED BY:
OCC. MINDORO
STRUT DETAILS AMELIA PAZ D. VASQUEZ
JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 18.00 2
GA#26 PRE PAINTED G.I. SHT. RIDGE ROLL
GA#26 PRE-PAINTED RIB-TYPE
°
26.68 G.I. SHT.ROOFING
PURLINS 150 x 65 x 20 x 1.10mm
SPACED @ 0.75 m O.C.
1
0.9
4
S4 STRUT
5.2 2
STRUT
2
0.50
450 x 175 x 12mm thk 175 x 175 x 12mm thk
310 x 175 x 12mm thk
0.25
2
0.3
6-16mm Ø x 600mm
Anchor Bolt 410 x 300 x 18mm thk
0.30
20/12/2016 11:27:03 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER CONSTRUCTION OF MULTI-PURPOSE BLDG. TRUSS DETAILS ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE S4
BRGY. TANGKALAN, MAMBURAO, BASE PLATE DETAILS ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO OCC. MINDORO TRUSS SPOT DETAIL CHECKED BY:
JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE
MAMBURAO, OCCIDENTAL MINDORO
20/12/2016 11:29:51 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, 1
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO CHECKED BY:
JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DISTRICT ROAD MAP
MINDORO OC CIDEN TAL I DIS TRICT ENGI NEERI NG OFFICE
Mamburao , Occ id ental Mindoro
Del MontePt.
TABLE OF CONTENTS
REPUBLIC OF THE PHILIPPINES
t.
Bagolayag Pt. o P as
Pt. int
io gu Tom lang ag g
o. il La y Bato na
M ananao Bar Gui St Ano o
Bas toang an Bal
Bag Talipanan
Bat as Lau
Agsigang an tar
Calagian Api ona il Lucut an
az Or Ban 68
I ba Am Camurong
Cabignayan 67
Mt. C
abign
ayan Wawa
Udalo
65 66 M at ab
ang
M adu
ron ABRA DE ILOG Aluyan
64
ENGINEER/BUILDING OFFICIAL
PALUAN CamtasPt.
M ason
Baclaran
51
R. Culanguan
n 50
a so
M 49
a R. Baluguhan
M amar Cabacao
Tubili
Balibago 48 98 Lanas Lake b ala n R .
Esteban S inam
Balant oy
47
M aslud 46
Binarira Pt.
M asl ud R .
45
Tangkalan
I gsuso
A1
I gsuso Pt . Cabiguan
44 San Luis
Ligang
43
M at a
m ayor
42 Santol M t . Mic
m ic
Tagawangawan Sinam balan
Banilad
n R.
41 Payompon
BalongM oro ng a
OR
DISTRICT/CITY/MUNICIPALITY
Bagraan i
l tu
Dapi A
40 Liliw
MAMBURAO Balansay
M imping 39
38
Lagundian
Lagnas
37
Lanas
36 Sahing
Calam intao OC IE
M aculbo
M aculboPt.
Baranggit
Bangayan
. t ogo
R Pi
CI NT
Cigaras
Calum bayan P
a
gb
ah
an
Curt inganan DE AL
Talabaan
35
Alacaak
Culisan
Lanas
NT MI
PERSPECTIVE
97
San Vicente
34
33 93
96
94
Kabungahan
Aribugan
95 Carumbac
Kawayaanan
O ring
R.
AL ND
SANTA CRUZ
92
M ulawin 91
Casague
90
. Kabanabahan
Lusacan
B
o
ca
ya o
MI OR
R
ND O
R.
a n
32 la g
a
Lum angbayan
R.
t ni
S
OR
R
31 89 M a m a l i .
in
y
Pola Banganay
na
LOCATION MAP
30 Eagle Pa s s
P
29 Ime
ra
m
O
A
Calanguan n R.
Anayasan ve
Balat ikan Amnay o
R
Dayap
Barahan Bugtong Kawayan M t. Fa c h et
Pinagt urilan
28
VICINITY MAP
Bahay Par i rick R.
A m n ay R. Pat
El Dorado
Vict oria
Celina
Cansaya
P andan R
Paikot
.
Pagasa
PulongG ago
Pait an
Vi
27
San Agust in
R a y u s an R .
C a t he r i n e R.
Bangor Pass
LAND USE AND ZONING
SITE DEVELOPMENT PLAN
g a
Tagumpay R .
Pandan San Fr a
ncisco g
.
R
p on
o m
San Vicente M
I bud
d R. 26
25 I bu
24
Sto. ño
Ni Tulaong R.
88
Tabtaban Lake
TABLE OF CONTENTS
Buenavista
23 87
SABLAYAN 22
21
Batong Buhay
86
Tuburan
Arellano
84 85
Lula 82 SABLA YAN PENA L CO LO NY
Tuban
20 18 83
8081
BARO K AN-SA HING
79
Sta. ucia
L 78
M alisbong
19
Pandanan E. Aguinaldo 17
DongonPt. Ligaya
t.
P
on
ng
THIS SITE
o
D
Burgos
I r ir on B ay
16
15
Concepcion
14
M alpalon Sapaton
77 76
Poypoy
A2
Tabonac
Piri
I riron 13
75
Patay Ilog
Balagbagan
74
M ano
ot
12
73
New Dagupan
FLOOR PLAN
Niyayos Tanyag
G utad
M alatikwang Aguas M ont e Claro
CALINTAAN Cahagnayon
72
71
11 Rizal Batasan
M alawaan
Pit ogo
M agsikap
Salvacion M ang
at
FRONT ELEVATION
10
RIZAL San Pedro
09
Sto. ño
Ni
08
Rumbang Centr al M urtha
Adela Canwaling
Camburay
Alitayt ayan
San Agust in
La Cu
rv a Baulan
Bubog M agbay
Bayotbot
Paclolo 69
SIDE ELEVATION
R.
M abini
Bagong
guray
Sikat
70 05
07 Labangan 04 M apa
ya
Ca
G apa
san
San Roque
Lourdes
03
Caminawit
G amot
M angarin Bay
MAGSAYSAY 02
Nicolas
M anga Labangan Bulo
I
Caguray 01
li n
Bukad Bukad Pucatod Bagaas
Ansiray
A3
Tikod Sibalat
St r
Bunuaga
Lipat
Bunuaga
I ling P
roper
a
I L uiod
G
IG
N Last e
it
Sta. Theresa
IS
Bankal .
Buluang Pt . Bungkalan
Undaque M unt u
rido
Ambulong Batong Salam aga Alibog
AMBULONG I S. M anukan
I nasakan
Catayungan
Bagocog
G ARZA I S.
Dumalaga Natandol
Pabuga
n Pt . BURI I S.
Tabal
S il a n g Ba y Cabaong
Pawican
Pawican Pt .
M agirom
Bugias M angaag
ui Pt.
I ling Pt.
ARCHITECTURAL
PERSPECTIVE S1
STRUCTURAL NOTES
S2
STRUCTURAL
FOUNDATION LAYOUT
FOOTING SCHEDULE
TO CALINTAAN N FOOTING DETAILS
N COLUMN SCHEDULE
BEAM DETAILS
AD
RO S3
MALAWAAN BRGY. L
PLAZA NA ELECTRICAL
O
TI ROOF FRAMING PLAN
THIS SITE STRUCTURE NA BEAM DETAILS
TO
STRUT DETAILS
S4
TRUSS DETAILS
BASE PLATE DETAILS
TRUSS SPOT DETAIL PLUMBING
TO SAN JOSE
SANITARY
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS CONSTRUCTION OF COVERED COURT
OFFICE OF THE DISTRIC T ENGINEER CONSTRUCTION OFOCCIDEN
MALAWAAN, RIZAL, MULTI-PURPOSE BLDG.
TAL MINDORO ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE
AS SHOWN ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO CHECKED BY:
JOHNNY M. USI AMELIA PAZ VAZQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL, OCC. MDO. ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
20/12/2016 11:29:52 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, A1a
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO CHECKED BY:
JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
-
1 --- 2 1 2
18.00
45
4. APEX OF TRUSS
8.60
8.40
46
5.
5.00
5.00
E
3
S4
8.60
8.60
TOP OF BEAM
6.00
3.60
3.40
3.60
3.60
NAT. GRADE LINE
D
0.00
-0.20
2
A3
FRONT ELEVATION
2
30.00
6.00
1 : 100
GA#26 PRE-PAINTED RIB-TYPE
G.I. SHT.ROOFING
F E D C B A
30.00
C
0.79 6.00 6.00 6.00 6.00 6.00 0.80
2
A3
6.00
APEX OF TRUSS
8.40
8.60
5.00
B
8.60
TOP OF BEAM
6.00
3.40
3.60
3.60
20/12/2016 11:29:56 AM
1 : 100 1 : 100
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER PERSPECTIVE
ARDEE D. EUGENIO A2
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, LOCATION MAP ENGINEERING ASST.
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO VICINITY MAP
CHECKED BY:
SITE DEVELOPMENT PLAN AMELIA PAZ D. VASQUEZ
JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO
TABLE OF CONTENTS ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2 1 2
18.00
9.00 9.00
STRUT
STRUT
1. 72
5.00
5.00
STRUT
R1
E
8.60
8.60
TOP OF BEAM
BEAM BEAM 3.40
3.60
6.00
3.60
3.60
NAT. GRADE LINE
0.00
-0.20
D
CROSS SECTION
2 1 : 100
30.00
6.00
C 2
F E D A3 C B A
30.00
6.00
APEX OF TRUSS
8.40
8.60
STRUT STRUT STRUT STRUT STRUT
B
STRUT STRUT STRUT STRUT STRUT
5.00
6.00
8.60
TOP OF BEAM
3.60
3.40
BEAM BEAM BEAM BEAM BEAM
3.60
A
NAT. GRADE LINE
0.00
-0.20
20/12/2016 11:29:59 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER PERSPECTIVE ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT,
LOCATION MAP A3
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO VICINITY MAP CHECKED BY:
SITE DEVELOPMENT PLAN JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO TABLE OF CONTENTS ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
30 BAR DIA. 30 BAR DIA.
VERIFY DEPRESSION
(min.) (min.)
TABLE OF LAP SPLICE & ANCHORAGE LENGTH NOTES:
MAIN REINFORCEMENTS TO BE
CONTINUOUS (TOP & BOTT. BARS) CONSTRUCTION NOTES
D=FOR BEAM
t=FOR SLAB
4- 16 VERT. BARS
1. YIELD STRESS OF HOOPS = 40 KSI WHERE JOINTS IS AT POINT OF
STRESS, PROVIDE SHEAR RODS
BAR SIZES LAP SPLICES LENGTH ANCHORAGE
550
2. D = USE MAXIMUM COLUMN DIMENSION, WITH ENGINEERS APPROVAL A. GENERAL
550
(MM) TYPE "A" TYPE "B" LENGTH (M) 1/6 CLEAR HEIGHT OR 18" (450mm) 1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR
30 BAR 50 30 BAR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
0.60 WHICHEVER IS GREATER.
10 0.40 0.30 (MIN.) (MIN.)
3. NUMBER OF HOOP TIES SAME AS PER D=FOR BEAM 2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS
D/3
12 0.45 0.35 0.60 COLUMN TIES SCHEDULE. 550 2t=FOR SLAB IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION.
D/3
D
16 0.61 0.40 0.60 4. ALL CONCRETE REINFORCEMENT DETAIL 4- 16 VERT. BARS 30 BAR DIA. (min.) 3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN CHECK WITH MECHANICAL
D/3
SHOULD BE DONE IN ACCORDANCE WITH AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE SLEEVES, ETC., TO BE EMBEDDED IN CONCRETE.
20 0.76 0.56 0.60
ACI DETAILING MANUAL 1980 PUB SP-66
BEAM TYPICAL DETAIL FOR BEAM 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING & BRACINGS OF THE
25 1.10 0.90 0.68
TYPICAL SLAB & BEAM OR SLAB CHANGE SOFFIT STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION.
28 1.40 1.20 0.86
1.12 H
550 CONSTRUCTION JOINT DET. DOWEL BARS TO
B. CONCRETE & REINFORCEMENT
32 1.90 1.40
FLR. SLAB OR BEAM MATCH VERT. BARS 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST BUILDING CODE OF AMERICAN
36 2.41 1.84 1.43 CROSS-TIE
TYPICAL CONNECTION DETAIL CONCRETE INSTITUTE (ACI-318).
(DOWEL)
350mm. MAX.
12x1000 LONG AT
NOTES: OF R.C. WALL AT CORNERS 1. ALL JOINTS AND CELLS 2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT (28) DAYS
400
VERIFY ARCHITECTURAL
MID-DEPTH OF SLAB
1. TYPE "A" BUNDLED BARS AT EACH CORNER CONTAINING REINFORCING W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS.
H
10
TYPE "B" INDIVIDUAL BARS BARS SHALL BE FILLED
dm
2. NOT MORE THAN 33% OF THE BARS SHALL BE WITH CONCRETE GROUT. LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP
in.
MAIN REINFORCEMENTS 1- 12 TOP &
SPLICED WITHIN THE REQUIRED LAP LENGTH TO BE CONTINUOUS BOTT. BARS 2. FOR REINFORCEMENTS SEE
FOUNDATION FOOTING 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
CONSTRUCTION NOTES.
CONF. REINF.
10x1000 LONG ELEVATOR SHAFT 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
JOINT HOOP SPACE @ "2Sh" WHEN @ 300 O.C.
400
COLUMNS 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
(DOWEL)
THERE ARE BEAMS HAVING WIDTH OF 40 1- 16 CONT. HOR. BARS
400
D JOINT REINF. D
AT LEAST ONE-HALF THE COLUMN FOR FLOOR SLAB ONLY BEAMS, SLABS 20.7 Mpa(3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
t/3 t/3
LAP SPLICE LENGTH: WIDTH & DEPTHS NOT LESS THAN SLAB 38mm SLAB ON GRADE 17.2 Mpa(2500 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM)
t/3
t
AT ANY LEVEL NO MORE THAN THREE QUARTERS OF THE DEEPEST OPENING CLEAR
BEAM THAT FRAME INTO FOUR PLAN 3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 33 FOR DIAMETER 12 & SMALLER BARS
ALTERNATE BARS SHOULD BE CONF. REINF.
SPLICED. MIN. DISTANCE BET. SIDES OF THE COLUMN. ALL OTHER TYP. SECTION OF MASONRY AND GRADE 40 FOR DIA. 16 AND LARGER BARS.
400
CONF. REINF. TIES LAT. TIES H (CLEAR HEIGHT OF COL.)
MAIN REINFORCEMENT
TWO ADJACENT BARS SPLICES CONDITIONS USE HOOPS @ "Sh" CENTERS.
Sh
PARTITION REINFORCEMENTS 4. IN GENERAL THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING REINFORCED
t OR 1/4 D
SHALL BE 600mm. CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN OR NOTED.
SLEEVES FOR UTILITY
t
IN TWO WAY SLAB EXTEND
WITHIN CENTER
COLUMN TIES AS
L
PER SCHEDULE
D
BARS UP TO BEAM SUPPORT
FOR COL. BAR SPLICES SEE TABLE DOWN INTO EDGE BEAM. EXTENDED
0.25L OMIT TRIMMER BARS WHERE 4- 12@ 1800 LONG TOP BARS BEND SUSPENDED SLABS ----------------------------- 3/4 IN. (19 MM)
OF MIN. LAP SPLICE LENGTH OF PROVIDE 3- 10 EXTRA STIRR.
TOP BARS @ SUPPORT (CONT.) COLUMN REINFORCEMENT EACH SIDE OF SLEEVES
OPENING IS FRAMED BY BEAM BARS MIN. OF 1,200 (4'-0") INTO BARS. SLAB ON GRADE ------------------------------- 1 1/2 IN. (38 MM)
4- 12 BOTT. BARS WALLS ABOVE GRADE ---------------------------- 1 IN. (25 MM)
REQ'D. BOTT. BARS @ SUPPORT
TYP. DET. FOR SLEEVES TYP. SLAB OPENING DET.
CONF. REINF.
BEAM STIRRUPS AND COLUMN TIES --------------------- 1 1/2 IN. (38 MM)
JT. REINF.
0
EARTH BUT POURED AGAINST FORMS -------------------- 2 IN. (50 MM)
60
NOTE:
ALL CONCRETE REINF. DETAIL SHOULD WHERE CONCRETE IS DEPOSITED
0
60
Dbar DIRECTLY AGAINST EARTH -------------------------
BOTTOM BARS BE DONE IN ACCORDANCE WITH ACI 3 IN. (75 MM)
0.165L SPLICE AT MID SPAN
CONF. REINF.
60
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & SECURED IN PLACE
0
TYP. DETAIL OF COL. LAP SPLICE TYPICAL COLUMN ELEV. SHOWING BAR DIAMETER
Dbar
MINIMUM BEND
RADIUS R
EXTENSION
LE TYPICAL CORNER SLAB DETAIL PRIOR TO PLACING OF CONCRETE.
& EXT. GIRDER TO COL. CONNECT. DOWELS AND TIES SPACING 10 TO 25 3Dbar 12Dbar
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENT'S AND
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
28 TO 36 4Dbar 12Dbar NOTE:
PROVIDE THESE ADDITIONAL BARS FOR 9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY AFTER
400
BEAMS -----------------------------------
400
BARS TYPICAL WHERE DEPRESSED FOOTING OR SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS, AND DOWELS
300 300 SLAB OCCURS
(DOWEL)
DOWEL
DOWEL
400
400
400
CHB VERTICAL BARS 6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUT
600 (MIN.)
250
250
(DOWEL)
ELEVATION 3- 10 BOTT. BARS D. FOUNDATION
6- 10 BARS (AS SHOWN)
INTERSECTION WALL INTERSECTING R.C. COL. OR WALL 10 BOTT. BARS @ 300 O.C. 1. FOUNDATION DESIGN WAS BASED ON ASSUMED SOIL BEARING CAPACITY OF 95.76KPA
TYP. DET. OF LINTEL BEAM 400 400 400
TYPICAL CONNECTION DETAIL OF MASONRY WALL AT CHB WALL OPENING TYPICAL CHB FOOTING DETAILS ( WHERE APPLICABLE )
20/12/2016 11:29:59 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER PERSPECTIVE
ARDEE D. EUGENIO S1
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, LOCATION MAP ENGINEERING ASST.
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO VICINITY MAP
CHECKED BY:
SITE DEVELOPMENT PLAN AMELIA PAZ D. VASQUEZ
JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO
TABLE OF CONTENTS ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 2
18.00 SCHEDULE OF FOOTI NG
FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS
FOOTING
C1F1 C1F1 MARK LENGTH WIDTH DEPTH Thickness BAR X BAR Y
(L) (W) (D) (t)
F
6.00 F-1 1600 1600 1800(ver.) 250 7 - 16mm 7 - 16mm SQUARE FOOTING
SQUARE FOOTING
L
C1F1 C1F1
NGL
E
6.00
D
C1F1 C1F1 Y-BARS
Y-BARS
X-BARS
X-BARS
D
t
100
PLAN
30.00
6.00
L
100 mm THICK
GRAVEL BEDDING
SECTION
C1F1 C1F1
C-1
250 250 250
6.00
600
C1F1 C1F1
500
500
500
300
B
20/12/2016 11:30:00 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER
FOUNDATION LAYOUT
ARDEE D. EUGENIO S2
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, FOOTING SCHEDULE
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL ENGINEERING ASST. DPWH-IV-B
MINDORO
FOOTING DETAILS
MAMBURAO, OCCIDENTAL MINDORO CHECKED BY:
COLUMN SCHEDULE AMELIA PAZ D. VASQUEZ
BEAM DETAILS JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
- 2-16 Ø MM MAIN CONT. BARS
1 --- 2 2-16 Ø MM
18.00
L2 L3
9.00 9.00
0.79
LAP SPLICES ARE LAP SPLICES ARE
F 2D 2D
ONLY ALLOWED IN 2D 2D
ONLY ALLOWED IN 2D
TRUSS THIS PORTION THIS PORTION
BEAM
G
STRUT
STRUT
STRUT
IN
BEAM
E C
6.00
KL RA
U SB
NB S
C
R RO
TU C
A
L2/5 L2/5 L2/5 L2/5
TD DI
2-16 Ø MM
W MM
12
/S
E 2-16 Ø MM MM MAIN CONT. BARS
TRUSS
12MM DIA PLN BAR SIGSAG BAR
BEAM
W/STD. NUTS & WASHER
BEAM DETAILS
2
STRUT
STRUT
STRUT
NTS
BEAM
6.00
BEAM
MEMBER 51 450 140 4.85
STRUT
STRUT
STRUT
G
IN
30.00
31.60
E C
6.00
BEAM
KL RA
U SB
STRUT 2LS 63.00 X 63.00 X 6.00 MM 63 200 60 4.85
NB S
C
R RO
TU C
A
TD DI
W MM
12
VERIFY
STRUT
STRUT
BEAM
STRUT
BEAM
6.00
k)
th
m
6m
x
m
3m
SEE SPOT DETAIL-4
x6
m
SPOT DETAIL
3m
B
-( 6
TRUSS 2 EQUAL PANEL @ 1.966 = 5.898 M.
1L
DET. ELEVATION OF STRUT-1
k)
th
m
STRUT
STRUT
STRUT
G
6m
IN
BEAM
E C
x
BEAM
6.00
KL RA
m
3m
U SB
x6
NB S
C
R RO
m
3m
TU C
A
-( 6
TD DI
1L
W MM
12
/S
A
0.80
20/12/2016 11:30:02 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, ROOF FRAMING PLAN S3
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO BEAM DETAILS CHECKED BY:
STRUT DETAILS AMELIA PAZ D. VASQUEZ
JOHNNY M. USI SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
1 18.00 2
GA#26 PRE PAINTED G.I. SHT. RIDGE ROLL
GA#26 PRE-PAINTED RIB-TYPE
°
26.68 G.I. SHT.ROOFING
PURLINS 150 x 65 x 20 x 1.10mm
SPACED @ 0.75 m O.C.
1
0.9
4
S4 STRUT
5.2 2
STRUT
2
0.50
450 x 175 x 12mm thk 175 x 175 x 12mm thk
310 x 175 x 12mm thk
0.25
2
0.3
6-16mm Ø x 600mm
Anchor Bolt 410 x 300 x 18mm thk
0.30
20/12/2016 11:30:05 AM
PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRIC T ENGINEER TRUSS DETAILS ARDEE D. EUGENIO
MINDORO OCCIDENTAL DISTR ICT ENGINEERING OFFICE CONSTRUCTION OF COVERED COURT, S4
BRGY. MAL AWAAN, R IZAL , OCCIDE NTAL BASE PLATE DETAILS ENGINEERING ASST. DPWH-IV-B
MAMBURAO, OCCIDENTAL MINDORO MINDORO TRUSS SPOT DETAIL CHECKED BY:
JOHNNY M. USI AMELIA PAZ D. VASQUEZ SALVADOR E. ABAD JOSEFINO M. MELGAR, JR.
AIRPORT ROAD BRGY 9 MAMBURAO OCC. MINDORO LOCATION : RIZAL , OCC. MINDORO ENGR. II - BLDG. COORDINATOR OIC-CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER