Daily Working Record

Name : PHAL Pisey

Month : Feb 2018


Date Contents Achievement Remark
5 Mon -Finished 12 bridges. -Stay at BTB.
-Checking condition of existing bridge
of CP2 & CP3 at Middle section.
6 Tue -Finished an other 13 bridges. -Back to PP.

-Preparing photos for each bridges. -There are a notable differences


7 Wed -Comparing water condition with google -Completed. of water level between that two
map (Taken on july, 2014). points of time taking photo.
-Finished 30 stations (Cross every
-Claim quantity for IPC No.6 Section 12 20m).
8 Thu -Request work from BTB office.
(Sta. 24+040 to 24+500). -Finished 44 Stations (Additional
cross)
-Finished Sectin 13 (8 Cross sections)
-Claim quantity for IPC No.6 Section 13
9 Fri -Finished Section 17 (22 Cross
and 17.
sections)
-Prepare photos at site for Bridges at
10 Sat CP2 and CP3 Middle section in Excel
file.