PETRONAS CHEMICAL MTBE SDN. BHD.

Lot 111 Kawasan Perindustrian Gebeng


PAGE 1
26080 Kuantan, Pahang

ASSET DEFICIENCY REPORT NO : MTBE/Piping/00863

Plant MTBE System Unit-0200 Asset Type Piping Circuit

Area MTBE-ND Asset ID Piping Area 200 PMT No.

Planner Planner PCMTBE RBI Risk N/A Date 08/02/2018

Component : Piping Big Bore SAP Notification ID: Priority : S2


Location : Pipe Manifolds : LSC-8-1P2-
10010-H-65 Findings:
Damage Type : Leaks - Leak at LSC-8-1P2-10010-H-65(LSC header).
Inspector : Mohd Fazley - Pipe leaking was occur opposite to 1 ½ inlet pipe from D-1004. Piping
Inspection Date : 08/02/2018 line no: LSC-1 ½-1P2-10002-H-40.
- Detail of leak piping:
Piping number: LSC-8-1P2-10010-H-65
P&ID : 64-D-1008-64–D–1012,64-D-1017
Pipe Schedule: 20
Location: Above walkaway nearby battery limit area 200.

Recommendations : Maintenance Repair

- Immediately repair the pipe. If replacement cannot be done,


temporary repair (NSR) can be performed with proper assessment and
approved procedure by technical authority. It shall be registered in
EMOC system for monitoring. Permanent repair shall be performed at
earliest opportunity.

PRIVATE & CONFIDENTIAL


PETRONAS CHEMICAL MTBE SDN. BHD.
Lot 111 Kawasan Perindustrian Gebeng
PAGE 2
26080 Kuantan, Pahang

Overall Condition:
- Leaking was due to the erosion causes from the condensate that flowing in pipe that rapidly lead to thinning the inner wall of the
piping.

Created By Reviewed By Approved By

Mohd Fazley B Fadzel Kartik Shaanmugan Krishnasamy M Faizal B Abu Bakar


08/02/2018 09/02/2018 12/02/2018

PRIVATE & CONFIDENTIAL


APPENDIX : REPORT AUDIT TRAIL

DATE REMARKS ACTION BY ROLE STATUS

08/02/2018 Pipe leak at LSC header Mohd Fazley B Report Submitted


Fadzel Creator

09/02/2018 boss please review and approve Kartik Shaanmugan Reviewer Reviewed
Krishnasamy

12/02/2018 This is the first failure associated to the M Faizal B Abu Bakar Approver Approved
downstream of piping system from D-1004 after
piping system modification during TA 2017.
Forward the report to TSD Process for further
evaluation of performance of D-1004 after
modification. The erosion at T section could be
accelerated from the modification.

PRIVATE & CONFIDENTIAL