National Highways Authority of India =": '# 225/ 2518 / 2488 ( 2552
(Ministry of Shipping, Road Transport and Highways)
5 wa 0, Baew10, ara, Re 110 075
6-5. 6, Sector10, Dwarka, New Deli-110075
NHAWU/MP/BOT/11012/01/2010 BOT —Fin (part file) Dated: 03.08.2016
CIRCULAR
Sub. processing of proposals relating to Change of Scope and
utility shifting estimates — circulation of Cheeklist — reg.
It is noticed that the proposal related to COS & utility shifting are of
emergent nature and needs to be disposed on priority. However, due to non
submission of the essential details, the files are referred back to Technical
Divisions/RO/PD for want of necessary details/information,
In order to expedite the COS & utility shifting proposals, it is requested that
the requisite information may be furnished as per check list- I (for COS) & II (for
utility shifting) enclosed on every such file / proposal of COS & utility shifting.
This issues with the approval of Member (F)
Wie AA
(Nivedita Srivastava)
Chief General Manager (F&A)
Copy to: All ROs/CGMs/PIUs/GMs/DGMs/Managers by email.— pracesing the propsvas related to Change of Scope for BOT projects = =
fA) General information
Project Name | ‘Mode | Concessonaite | TPC Key Dates Project Status Usbiltiesto | Any
tor (reine NAL termination
(TotV/Annuy) Aareenet | Aopaited | onsrvcion | cneson sco | R600. | Pita | Pranc issue
| “pate | bate ead Period | progress | progress
te a
| COSNe. ‘Nature of job in Estimated/ ‘%w.rt TPC | Date of Date of | Executed by % of work ‘Amount |Varlation, if) Variation | Remarks ]
Tet | Awarded Cost (cummulstie)| award | completion |Concesonaire executed | releasedto_ any approved |
/ | |Concesstonair for
contactor 'e/ Contractor
a | I
2 ae 1 J =e
3 - { {
4 { } 4
al
[el Present Propsoal - OO
Ss. Particulars | Nature of jobin | Estimated Cost Basisof | %w.rt.TPC| Dateof | Schedule COS | Effect of COS ‘Cost Estimate details Period of |Malor ters
No. bee te (commas szentiity completion onsthedule Completion for OS order
(60R tern certeateby | — period prosct
nD completion
cate a
| Base Gost | Taxes | Overhead | 08M
_ | | |
— —
| Pace t t cs
ate i t
_ including in-principle approvals for which final estimate approval is awaited.Sit or procs the propesalafelated to wlty siting BOT/EPC Projects
|) Generattotormation ~
Project Name Mode Name of | TPC. ince) Key Dates Project Status ‘Unity sift Grant 7
cost approved) Negative
Or /<9C _Concessionaire/| _
(Tol/annuity) | Contractor ‘ereement date) Appointed Date | Construction | Concesion sPco | COD | Physleal | Fnandal | ImTPC rant
| progress =| |
etlod| eed
|
Executed by | Sofwork | Amount | Physical | Financial [Escaation,| Va
‘Approving | Dateofaward | Dateof
work ‘approved | Authority (RO/ completion | Concssionare/ executed Hany
NMA HQ) User Agency
Period of
‘rested by | Probable date of Status of Compliance of Cul ‘cot Estimate deta
completion
leaking [Bese Cont] Toes [Speniow]| OB | Creditor
|v user vert. Aeeney ‘salvage
‘bate
| jr [Biv signes by Technical Bison)