CHAPTER 3

IMPLEMENTATION PROCEDURE

JOB 1 : CUT AND HONE WITH MANUAL SYSTEM

Procedure

1. a stretch and base about plumb were given after all member prayed.
2. Wrote tool availability was held after check tool availability by us.
3. Made a cut and hone pipe were held after checked tools and materials by all member.
4. The design about cut and hone pipe were given after all member gotten tool ana material
5. every 38 cm were be marked before pipe were cutted by all member.
6. The pipe was honed after a pipe cutter by all member.
Name : Arif Ramadhan Candrasa

Class : 2 MRK 5

JOB 2 : THREAD PIPE WITH MANUAL AND MACHINE

Procedure (Manual)

1. a stretch were given after all member prayed.


2. All tool and material will prepared by all member.
3. A galvanized pipe (φ1”, φ1/2”, φ3/4”) were cutted after the pipes were be marked every
19 cm by all member.
4. The diameter of pipe were sublimated by burring reamer.
5. Thread pipe were began after the pipes were sublimated and clamped with clamp by all
member.
6. Thread rotation were reversed if threader (name of tool) stuck during made a thread
7. Thread of pipe were finished after made as much as seven thread.
Name : Arif Ramadhan Candrasa

Class : 2 MRK 5

JOB 3 : MADE A SHORT INSTALLATION OF PIPE

Procedure

1. a stretch were given after all member prayed.


2. All tool and material were prepared by all member.
3. A requirement pipes were calculated before pipe were cutted by all member.
4. A seal tape were added after the pipes were threaded by all member.
5. Another pipe was plugged after joint pipe was added to another pipe by all member.
6. An installation was measured after all pipes were plugged until made a circuit.
7. A water were added after an installation pipe measured by all member for leak test.
8. The demolition were done if there was a leak during leak test.
Name : Arif Ramadhan Candrasa

Class : 2 MRK 5

JOB 4 : CONTINUE OF INSTALLATION

Procedure

1. a stretch were given after all member prayed.


2. All tool, material and part were prepared by all member.
3. A design about installation was drawn after tools and materials were be prepared by all
member.
4. A joints of pipe were prepared after made a plan by all member.
5. A requirement of pipe were calculated before cutted oleh all member.
6. A water meter was added after added a reducing elbow for pipe.
7. A Tee connected between bidet, sink and tap were added after reducing elbow were
added by all member.
8. A bidet, sink and tap were be added as a sketch after pipe, tee and reducing elbow we be
done as a sketch.
9. A sewer were added at bidet and sink after all part (bidet, sink and tap) were plugged and
connected to the pipe.
10. A leak test were be done during leak test there was not a leak began from pipe, joint until
sanitation parts like bidet, sink and tap.