DAILY REPORT OF ENGINEERING SUPERVISION

Today Weather: Date: 17Mei-2018


Construction 31st
Actual
period Jul,2022
completion
Date
Original:
Contract
Price
After change:

2. Supervision on Construction Work (including checking point, construction inspection , etc.):

3. Specification and Quality of Material (including checking point, material and equipment control point, inspection
and sampling, etc.):

Supervised: Checked: Approved: