Piping Drawings Checking Procedure
Posted by Antony Thomas at Tuesday, October 26, 2010 PIPING HANDBOOK DOWNLOAD PDF
PIPING HANDBOOK piping handbook free download ,
piping handbook pdf , piping handbook download , piping
1 Comments
handbook 7th edition , pip...
Ads by Google
TYPES OF PIPING JOINTS
Drawing Piping PIPING JOINTS Joint design and selection can
have a major impact on the initial installed cost,
Gas Piping the long-range operating and main...
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 1/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
The purpose of this design procedure is to ensure accuracy and completeness of piping PIPING INTERVIEW QUESTIONNAIRE 1.
drawings What factors to consider for site selection? Ans
issued by the Mechanical Design Department; and identify responsibility, criteria, and specific : District classification, Transportation ...
items
to be checked by the Mechanical Design Checker.
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 2/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
4.1 System to P&ID Check. Check that the pipe system matches the approved system P&ID
including comments found on the project’s Master Set of P&ID’s. The checker is
responsible that the piping drawing and the P&ID are in agreement for the following:
CHECKING PIPING DRAWINGS PROCEDURE
http://piping-info.blogspot.com
For Piping Tips and Info Visit http://piping-info.blogspot.com
- Standard end to end dimensions per ASME/ANSI B16.10 for valves 600 lb class and
below may be approved without approved vendor drawings for gates, globe, and
check valves. All other valves shall be on hold until approved vendor drawings are
available.
- Butterfly, control, ball, plug, and relief valve end to end dimensions do not conform to
end to end standards and shall be on hold until approved vendor drawings are
available.
- Identify dissimilar metal welds and wall thickness between component and pipe.
-
- Check that chain wheel operators are provided on non accessible valves.
4.9 Valve, Flow Element, and In-Line Component Installation Requirements.
Check vendor drawings and installation instructions for installation requirements of
valves, flow elements and in-line components within the pipeline.
- Straight pipe upstream and downstream requirements
- Valve stem orientation (especially butterfly valves)
- Clearances for valve maintenance and disassembly.
- Lugged butterfly valves shall be noted on drawings for proper bolting procurement.
- No gaskets required at low pressure butterfly valves and expansions joints.
- Flat face flanges required at flanged expansion joints
- Flat face flanges are required at cast iron equipment flanges
- Flow element upstream and downstream straight pipe requirements according to the
Control System Engineer requirements.
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 3/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
4.10 Vents and Drains. Check quantity and location of vents and drains. Check that all vent
and drain connections reference the correct standard detail number.
4.12 Minimum pipe spool lengths. Check that there are adequate pipe spool lengths
between pipe line components. Use the following as a guide. Large Bore Butt Weld:
Minimum spool length equivalent to the length of a butt weld reducer. Small Bore
Socket Weld: Minimum exposed pipe length between socket weld components ends
shall be 2”.
4.13 Separation Distances for Branches. Check that there is adequate separation distance
between pipe branches and adequate separation distances between branches and
pipe line ends or components.
4.14 Instrument Connection Orientation and Access. Check that instrument connections
that require access are accessible and that the orientation on the pipe is correct.
Check for proper connection type and size. Check that all Instrument connections
reference the correct standard detail number, and there are sufficient clearances for
element removal from pipe.
- Temperature connections shall be located downstream of pressure connections.
- Temperature thermowells cannot be installed in pipes smaller than 3”.
4.15 Insulation and Insulation Support Lugs. Check insulation requirements to Project
insulation class codes and thickness. Add insulation support lugs on vertical runs of
alloy pipe.
CHECKING PIPING DRAWINGS PROCEDURE
http://piping-info.blogspot.com
For Piping Tips and Info Visit http://piping-info.blogspot.com
4.16 Heat Tracing. Check that piping is Heat Traced as identified on the system P&ID and
in accordance with the Project Heat Tracing Criteria.
4.17 Pipe Penetrations symbols. Check that all concrete floor, platform grating, wall, and
grade penetrations are indicated and labeled on piping isometrics. Callout core drilled
openings in existing walls when required.
4.18 Waterstops. Check that water stops are provided on underground piping at floor and
wall penetrations.
4.19 Slope. Check that pipe systems that require slope have the proper minimum slope
and the correct slope direction. For hot piping verify pipe does not reverse slope in hot
position.
4.20 Pipe Supports and Welded Attachments. Check that pipe supports are shown when
required and locations, quantity, and tag numbers have been review and approved by
the Piping Engineering department. Check that shop welded pipe support attachment
details are provided on alloy piping for shop welding before shop stress relieving.
4.21 Material List on Isometrics. Check that all pipe and pipe component material
descriptions in the isometric drawing material list matches the engineering pipe line
specification.
4.22 Insulating Flange Kits. Check that insulating flange kits are identified on aboveground
piping systems connecting to underground pipe systems where required by the
pipeline specification.
4.23 Dissimilar Metal Welds. Check that dissimilar metal welds that may occur at valves,
Shares
equipment nozzles, and material spec changes are identified and transition pieces are
provided if required.
4.24 Dissimilar pipe and/or component wall thickness. Check that dissimilar pipe and
component wall thicknesses that may occur at valves, equipment nozzles, and at
material spec changes are identified and transition pieces or taper bores are provided
if required. ASME Power Piping Code B31.1 Section 127.3C allows a 1/16” (.0625”)
internal pipe wall misalignment (each side) for welding without taper boring the
connecting pipe. Example of piping drawing identification of dissimilar wall thickness
taper bore: TAPER BORE SCH 160 PIPE TO MATCH SCH 80 VALVE
5.0 PIPING SYSTEM ROUTING AND LAYOUT CHECK
5.1 Interference Check. Check that the system is interference free by a visual review of the
model and that a recent electronic interference report from the model had been reviewed
and cleared. If a non 3D project, review all discipline reference drawings. If the pipe
routing is within an existing plant area, verify a field interference check was performed.
For hot piping verify pipe clearances in hot positions.
5.2 Thermal Analysis. For hot piping verify WorleyParsons Piping Engineering Department
has approved the thermal flexibility of the pipe. Checker is responsible to obtain pipe
CHECKING PIPING DRAWINGS PROCEDURE
http://piping-info.blogspot.com
For Piping Tips and Info Visit http://piping-info.blogspot.com
thermal movements and verify clearances in hot position and that pipe does not reverse
slope causing low point pockets. Thermal movement’s direction and distance shall be
noted on check prints in blue for future reference.
5.3 Hazardous Areas. Check that no electronic instrument, valve actuator, or other electronic
component within the pipe or attached to the pipe falls within a Hazardous Area of the
plant.
5.4 Plant Personnel Access, Construction Access, Maintenance Areas, and Safety. Check
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 4/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
that the pipe system layout does not obstruct plant personnel access, construction
access, and maintenance areas of the plant. Check that the pipe system lowest
appendage (including pipe support clamps) is above 6’-8” headroom and does not affect
plant safety.
5.5 Pump and Equipment Requirements. Check that the pipe system layout meets the
requirements of the connecting equipment vendor requirements or common practice.
The checker shall read all vendor criteria. Examples:
- Pump suction straight diameters, eccentric reducers
- Steam Turbine vendor requirements
- Check pipe system against Equipment Vendor P&ID if applicable
- Installation and Maintenance Manuals
5.6 System Discharge Points. Check that safety valve discharges, gas vents, etc are
discharged in a safe location that will not be harmful to personnel, structures, or
equipment. Confirm safety valve discharges do no impact noise abatement requirements.
Confirm gas (fuel gas, hydrogen) discharge points are indicated on hazardous area
location drawings.
5.7 Underground Pipe Burial Depth. Check that underground pipe has adequate cover to
protect from crushing from vehicle, railroad, and crane loads and is below frost depth.
5.8 Pipe Lanes. Check that pipe system layout is within established pipe north/south,
east/west pipe lanes and elevations established within the plant. Underground piping shall
have common bottom of pipe elevations for trenching.
5.9 Structural Gusset Plates. Check that the pipe system does not interfere with areas to be
occupied by structural gusset plates. Not all gusset plates are in the model and those
that are modeled may not represent the actual structural fabricators detail and
requirements. Checkers must do a visual model interference check at gusset plate areas
and interface with structural design to assure sufficient clearances.
5.10 Circulating Water Branch Component Reinforcement Plate clearance. Check for
potential interferences in the area of large pipe component reinforcement plates,
especially at crotch areas of laterals.
5.11 Underground Potable Water and Waste Water Separation. Check local and state
codes for separation requirements between underground potable water and waste
water systems to prevent pollution of potable water.
CHECKING PIPING DRAWINGS PROCEDURE
http://piping-info.blogspot.com
For Piping Tips and Info Visit http://piping-info.blogspot.com
5.12 HDPE Pipe Fitting Separation and Butterfly Valves. Check that there are pipe spools
between all HDPE pipe fittings to accommodate differences in physical dimensions
between HDPE fitting manufactures. Check that Butterfly Valves discs are not
obstructed from opening when connected to heavy wall HDPE pipe. Pipe spacers
may be required between the flange and valve body.
5.13 Clearance from vertical structural columns and walls. Check that pipe routing
maintains approximately 9 inches of clearance from vertical structural columns and walls
(including hot position) to allow space for field routed utilities.
5.14 ‘Olet Branch Dimensions. ‘ Olet type pipe branch fittings (weldolet, sweepolet, etc)
dimensions (run pipe centerline to the fitting outlet) are approximate because the
dimension varies by manufacture. Check that fitting to fitting design on the outlet of
the ‘olet branch fittings is not used. A pipe spool is required for adjustment by the pipe
fabricator to suit actual fitting dimensions while maintaining the overall geometry of
the pipe system.
5.15 Miscellaneous Items for Checking List. Includes commonly found piping isometric
Isogen software errors requiring manual annotation.
a) Orifice Flange pressure tap orientations incorrectly shown by Isogen.
b) Dimensions or dimension strings starting at pipe caps. Isogen dimension is
from cap work point (center of cap where blue line stops) but dimensions
on drawing appears to be from end of cap.
c) Eccentric Reducer offset dimensions incorrectly shown by Isogen do not
match actual fitting offsets as manufactured and should be deleted.
6.0 HOLDS CHECK
6.1 Holds. Check the location and limits of drawing HOLDs to areas of the drawing that are
incomplete or can not be verified and approved by the checker prior to issue due to
insufficient engineering, vendor, client or other discipline information. See Section 2.2.
6.2 Hold List. Check that all drawing holds are included in the Holds List for the project.
7.0 PIPING DRAWING CHECK LIST
7.1 Check List. A summary of the items identified in this procedure is provided in
ATTACHMENT 1 “Piping Drawing Check List”.
This list may be printed and used as a checking tool or record at the discretion of the
Mechanical Design Checker.
CHECKING PIPING DRAWINGS PROCEDURE
http://piping-info.blogspot.com
For Piping Tips and Info Visit http://piping-info.blogspot.com
ATTACHMENT 1
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 5/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
ATTACHMENT 1 (CONTINUED)
http://www.scribd.com/doc/40176904/Checking-Piping-Drawings-
Procedure#
Labels: piping design system, site map, zip download
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 6/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
Add a comment...
1 COMMENTS:
1
Gilsulate International, Inc. said...
POST A COMMENT
Popular Posts
PIPING HANDBOOK DOWNLOAD PDF
PIPING HANDBOOK piping handbook free download , piping handbook pdf
, piping handbook download , piping handbook 7th edition , pip...
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 7/8
12/29/2017 Piping Info: Piping Drawings Checking Procedure
Piping Info
Piping Designer–Jacobs Singapore
Senior Piping Designer - Sakhalin Island
Piping Designer–Wood Group
Piping Designer–Singapore (PDMS/FPSO)
Senior Piping Engineer
https://piping-info.blogspot.in/2010/10/piping-drawings-checking-procedure.html 8/8