Professional Documents
Culture Documents
Resume: Post For Applied: Production / Commissioning/Field Operator
Resume: Post For Applied: Production / Commissioning/Field Operator
Resume: Post For Applied: Production / Commissioning/Field Operator
OBJECTIVE:
Seeking a job to utilize my skills and abilities for the development of organization and professional
growth of my career while being resourceful, innovative and flexible.
PERSONAL DETAILS :
PASSPORT DETAILS:
Passport No : G 7354363
Issue Place : Trichy
Issue Date : 03.03.2008
Expiry Date : 02.03.2018
Status : ECNR
TECHNICAL BACKGROUND :
Ms Office 2000, 2003 & 2007, Ms Word, Excel, power point , Corel Draw, Photo Shop,
Pagemaker etc . Pc Handling, Internet Access Etc
OPERATIONAL SKILLS:
Tracing the flow lines vesselsand make sure as per the P&ID
Punch list preparation and marking as per P& ID.
Flushing the flow lines with water
Blowing (Air drying) of the flow lines
Card board blasting of the lines.
Hydro testing of the flow lines.
Vessel cleaning & inspection.
Functional testing of the running equipment’s.
Purging of the flow lines with Nitrogen.
Chemical cleaning of the compressor section lines.
Mechanical no load test of the Compressor & Pumps.
Lube oil flushing of the compressor.
Following scope of work (SOW) and all kind of Work Permit Systems, Strictly and
Carefully.
Stoke check of Esdv & control valves (Cause & Effect) and communicate with control
room
Following Start-up and Shut-down Procedures as per Requirements
lock close & lock open as per operation
Familiar with wellhead, oil chokes, HP, & LP separators (Three Phase). Dehydration Tank,
Heat Exchangers, Demulsifier & Anti foam injection, other chemicals (Scale inhibitor,
Corrosion Inhibitor, water Clarifier, DRA(drag reduce agent)oxygen scavenger, etc.) injection
rate calculations, chemical injection pumps (Electrical and air drive) Desalting crude
through electric desalters, Produced Water Tank, Skimmer Tank, Tilted plate Tank ,Gas boot,
produced water flash drum, knock out drum, Pig launching and receiving ,foam, scraper, cup
and intelligent preparation of daily production reports (Gas, oil & water), Well
Test Data entry, oil & gas calculation for GOR. Operation & Control of Roof Top
intermediate Tanks (5000 M3 ), handling transfer pumps, booster pumps, Main pumps,
current level of the tanks, Bottom oil transfer operation, water draining and operation of all
motor operation valves at Crude Oil Pumping Station.
WELLHEAD OPERATION
Well head operation, well testing, wing valve, crown valve, upper & lower master valve,
annulus valve, pull plug operation, well maintenance, hand over to wire line job SSSV
operation, SSSV opened up & shutdown-hydraulic pump operation, floor line panel board
operation, choke changing, well equalizing, work over, well completion, circulating valve
operation, drain water pump operation, back pressure valve operation, gas lifting, water
injection, chemical injection change over familiar with startup & shut down emergency
procedure & troubleshooting etc….
GAS FIELD EXPERIENCE : GAS DEHYDRATION UNIT
Methyl Diethanol Amine (MDEA) is used to absorb the H2S from the sour gas. It consists
of two sections; Absorption section is Amine Contactor and Amine regeneration section.
Operation and control of the Absorber, Knock Out Drum, Heat Exchangers and maintain the
MDEA temp. Control the level of rich amine flash drum, Rich & Lean Amine exchanger,
Regenerator, Control the lean amine flash drum, operation of vapor compressors and Reflux
pumps
Propane Column Start up & Shut down Procedure , Propane Compressor operation,
Propane Chilling Unit, Lube oil panel Operation, Accumulator Level maintenance, Pcv
Function , Maintain the chiller level & Scrubber level , Maintain the Propane
Temperature , Isolation, etc.
Acid gas is coming from the sweetening unit to recover the Sulphur. Maintain the
incinerator, knock out drums, oxidizer and absorber, adding catalytic reagents AR1310 and
liquid Sulphur is transferred to Sulphur storage tank by transfer pumps.
The sweet and dehydrated gas is feeding the dew point depression unit in order to avoid
condensation in the pipeline, so the heavy hydrocarbons need to be removed. It consists of
two sections. Chill down section and Propane refrigeration section, Operation of the heat
exchangers, Gas Chillers, Filter separators, Condensate transfer pumps, Propane compressors,
knock out drums and Propane accumulators. Dispatch the gas at -2.5 deg. C.
BOILER :
Fuel gas line operation. Burner ignition system operation. Temperature maintenance,
LCV, PCV operation. Drainage PRV operation, Raw water sump operation, Chemical
injection, Soft water tank operation, Boiler operation, Fuel gas line operation, Burner pilot
operation etc…
GAS INJECTION UNIT :
Inject high pressure dehydrated gas into the well reservoir, Operation and
maintenance of multistage gas compressors (Kawasaki cooper), Scrubbers, Inter Coolers,
After Coolers, separators, Start up and shutdown operations of compressor at gas injection
unit, control the dryers, pressurization/depressurization of the dryer, control the cool box,
operations and maintenance of single state and expander, handling LPG dispatch centrifugal
type compressors and NGL pumps.
WATER TREATMENT & WATER INJECTION PLANT :
To inject high-pressure water into well reservoir for maintaining the Reservoir level &
pressure. Lube oil pump, Booster pump, sea water lifting pump, centrifugal & reciprocating
pump operation, Bactrocide coagulant, demulsifier, water clarifier, deformer, scale inhibiter
all chemical calibration & dosing rate operation.
UTILITIES :
Well experienced in utility operations such as Gas Turbine Generator, Utility &
instrument Air Compressor, Centrifugal Pump, Piston Pumps, Water Treatment Plant,
Produced Water Treatment Plant, Raw Water Treatment, sewage water and effluent treatment,
cooling tower, chemical injection, And fire water pumps. Following first level maintenance,
Issuing & handling the work permit, Directly involving startup /shutdown / isolation etc.
calculating gas flows from Barton chart Preparing shift status reports to Supervisors & Good
Operating Knowledge of computers and taking reading about the current status.
SAFETY :
H2S Safety, Fire safety, using crow can gas tester (CH 4, H2S), fire Extinguisher (Foam,
DCP & CO;) using in fire classification, fusible plug operation, deluge valve operation, fire
water pump operation. Breathing Apparatus, Safety Jacket, Gas detector. Smoke detector,
heat detector operation, H2S deduction, ultra violet systems, Fire eye deluge Valve System
etc,
DECLARATION :
I hereby declare that the information furnished above is true to the best of my
knowledge.