SRIS AI EDUCATIONAL SOCIETY’S GROUP OF INSTITUTIONS, KODAD

GANDHI ACADEMY OF TECHNICAL EDUCATION, KODAD

MIDTERM EXAMINATION-I

SUB: PPC COURSE: IV/IV B.TECH, II-SEM BRANCH: ME

_________________________________________________________________________

1. The main characteristics of mass and flow production are [ ]

A) Continuous flow of material B) High skilled labor C) Low skilled labour

D) Easy supervision

2. In a mass production assembly shop following work measurement techniques are used
[ ]

A. Time study B. Work measurement study C. Work sampling

D. Production study

3. Work measurement is responsibility of [ ]

A. PPC B. Material department C. Industrial engineering D. Production department

4. They are type of analytical estimate- [ ]

A. Moving average B. Exponential smothering C. Curve fitting D. Products per hour

5. What factors affect the status of PPC department in the company for achieving informal status?
[ ]

A. Manufacturing Process B. Work is highly repetitive C. Number of workmen is very large


D. Number of workmen is not very large

6. If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time.
[ ]

A. 1 month B. 2 months C. 3 months D. 4 months E. 5 months

7. Total lead time is the summation of following factors :- [ ]

\A) Queue and transit time B) Delay time C) Manufacturing time D) Order preparation time

8. Find EOQ in Rs from the following data :-Annual consumption = 20, 000 units, Ordering and receiving
cost of material = Rs 20 per order, Annual carrying cost or storage cost = 10% of unit cost of material,
Cost of material = Rs 50. [ ]
A) 10000 B) 20000 C) 15000 D) 1500

9. Long termed forecasts are for the period of :- [ ]

A) One year B) Two year C) 3 to 5 years D) 5 to 10 years

10. Given the following data :- procurement cost per order = Rs 30 ; frequency of ordering per year =4 ;
number of suppliers = 3 . Form the above data, total procurement cost would be Rs ________.
[ ]

A) 40 B) 360 C) 320 D) 300

Fill in blanks

1. Being capable to adjust their production facilities shortly just after change in demand for
products and without incurring heavy expenses, greater flexibility in production is
provided by ________.

2. Proper Production Planning and Control can reduce cost in_____________


3. ________ Inventories help to balance company's supply with market demand.

4. Forecasting is function of ________.

5. What shall be the consequence of acceptance of frequent rush orders by sales department
__________________

6. Exponential smoothening is ________________________ method


7. Ordering of raw material is based on_________________________
8. Mass & flow production and process production are categorized under_____________________
9. Lead time is ________ for different items
10. As the quantity increases, the procurement cost__________________________