Factory Inspection and Test Record: Tanks

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Factory Inspection and Test Record

Tanks

FA-M-01
Tag No:
Description:
System:
Sub System: Item Description OK N/A PL Comments 1 INSPECTION CHECK LIST 1.01 Nameplate details are
correct in accordance with the datasheet. 1.02 Tank is installed level and as per P and ID's. 1.03 Tank is secure. 1.04 Internals are fitted as per drawing. 1.05 Check coating is
undamaged. 1.06 Tank is clean internally. 1.07 Manway is accessible. 1.08 Manway lifting arrangements are adequate. 1.09 Access ladders and platforms are correctly installed. 1.10
Access to valves, guages and fittings are adequate. 1.11 All gaskets are fitted and are correct to specification. 1.12 All tank trims are fitted and according to drawing. 1.13 Check nozzle
loading is not excessive. 1.14 Adequate clearance exists for removal of internals. 1.15 All bolting is tight and to specification. 1.16 Check earthing / grounding boss is fitted. 1.17 Check
orientation of all tank nozzles. 1.18 Check correct number of nozzles installed. 1.19 Confirm tank manufactured to specification requirements. Note: Tick all check item under OK -
Satisfactory; N/A - Not Applicable; Punch items(s) are to be PL. Completed ByWitnessed ByAccepted ByPIMS Data InputCompany/Dept: Print Name:
Signature: Date:
PREPARED BY WIDYANSYAH RITONGA REVIEWED BY HAMDI BEY