Daily Report of Engineering Supervision: Date

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

DAILY REPORT OF ENGINEERING SUPERVISION

Today Weather: Morning: Date: 14Mei-2018


Construction 31st
Actual
period 1.794 days Jul,2022
completion
Date
Original:
Change Order No.
Contract
Planned Construction Price After change:
Progress (%)

2. Supervision on Construction Work (including checking point, construction inspection , etc.):

3. Specification and Quality of Material (including checking point, material and equipment control point, inspection
and sampling, etc.):

4.

Supervised: Checked: Approved:


DAILY REPORT OF ENGINEERING SUPERVISION

You might also like