The document provides calculations for surface runoff and stormwater drainage for a plot of land before and after development. It measures the plot area, calculates runoff coefficients and discharge rates for different surfaces. It finds that runoff increases by 46% after development. It then calculates the number and dimensions of percolation wells needed to store runoff from a 1-hour rainfall. Finally, it determines the required size of a stormwater drain to handle the increased runoff rate from the site.
The document provides calculations for surface runoff and stormwater drainage for a plot of land before and after development. It measures the plot area, calculates runoff coefficients and discharge rates for different surfaces. It finds that runoff increases by 46% after development. It then calculates the number and dimensions of percolation wells needed to store runoff from a 1-hour rainfall. Finally, it determines the required size of a stormwater drain to handle the increased runoff rate from the site.
The document provides calculations for surface runoff and stormwater drainage for a plot of land before and after development. It measures the plot area, calculates runoff coefficients and discharge rates for different surfaces. It finds that runoff increases by 46% after development. It then calculates the number and dimensions of percolation wells needed to store runoff from a 1-hour rainfall. Finally, it determines the required size of a stormwater drain to handle the increased runoff rate from the site.
a PLOT AREA IN ACRES b PLOT AREA IN SQ MTR. 29999 m2 Terrace area 5350.00 m2 Paved area 2999.90 m2 Green area 4500.00 m2 Open area 17149 m2
SURFACE RUN OFF BEFORE PROJECT SOFT
A DEVELOPMENT AREA a INTENSITY OF RAIN FALL IN MM/HR 100 b TOTAL PLOT AREA SQ MTR. 29999 c RUN-OFF COEFFICIENT 0.30 d DISCHARGE IN CU MT/HR. 899.97 ROAD / GREEN / SURFACE RUN OFF AFTER PROJECT Terrace B HARD SOFT DEVELOPMENT area AREA AREA a INTENSITY OF RAIN FALL IN MM/HR 100 100 100 b AREA UNDER OPEN IN SQ MTR. 5350.0 2999.9 21649.1 c RUN-OFF COEFFICIENT 0.85 0.70 0.30 d DISCHARGE IN CU MT/HR. 454.75 209.99 649.47 e TOTAL DISCHARGE IN CU MT/HR. 1314.22 INCREASE IN SURFACE RUN OFF AFTER C 414.25 PROJECT DEVELOPMENT IN CU MT/HR. D % INCREASE IN SURFACE RUN OFF 46.03 E Percolation wells Cal for One Hr. Storage Total Discharge in One Hr. CUM 414.246 m3 Percolation rate 0.010 m/hr Total percolation area 4.142 m2 Dia of one pit 0.600 m Area of one 0.283 m2 Depth of Pit in Mtr 20 Nos. of Pit 14.6583864
F Storm water drain calculations
Run-off Q 899.97 m3/hr Run-off 0.24999167 m3/sec Q = A x V, where V = 1.5 m/sec A= Q/V Area of storm water drain, A 0.16666111 m2 Considering Width, w = 0.6 m 0.6 m The depth of storm water drain, d 0.27776852 m Considering free board of 75 mm, i.e. 0.075 m, total 0.35276852 m depth