C 7WY0 WH 02 201 LAY000 0 Lay General Construction Areas @work PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

N

ESTACIONAMIENTO 27 CARROS

ESTACIONAMIENTO 34 CARROS
Hazardous
MECHANICAL

BAÑOS
PARKING waste
EXCLUSION AREA PRIMETALS SHOP WPC
50 PAX
storage
OVERHEAD
ELECTRICAL WAREHOUSE 1
POWER LINE
(EQUIPMENT LAYDOWN

FSO
OFFICE
AREA)
OFICINAS TEMPORALES
36.000 M2

BAÑOS
STRUCTURAL
PRIMETALS BAÑOS
40 PAX OFFICE MECHANICAL Outdoor
PT - Site Facilities

WAREHOUSE
LUNCHROOM
WORKSHOP Warehouse
EXPEDITING
WP &
ARCELOR MITTAL ADMINIS- ELECTRICAL PIPIN &
LOGISTICS
50 PAX
TRATIVE STRUCTURAL STRUCTURAL
(option 1) WORKSHOP
OFFICE WAREHOUSE WORKSHOP
Embedded
items Covered
& Warehouse
others Laboratory
Warehouse
IH.8204
F
1
Legend:
F... PHASE 2
ES
IH.72.89.05 F

P F F
F F
F
PERMANENT ROAD

ArcelorMittal
Arcelor
Consortium F

IH.8202

IH.8203
Covered Coil Storage
B15
Space for Electric

Space for electric

B16
M BC03
Space for Electric

O N F
F

BC13 3
PICKLING LINE

F
F
B_01 13
WH.94
IH.8200

P
F

IH.8208 B12 B11


B18
BC01
F

F
F
F

F
F

M
F BARRA DE
COMIDA
RAPIDA

Q H
IH.72.89.02 IH.72.89.04

P
IH.72.89.01 IH.72.89.03 IH.8213
WH.11.20201 WH.14.20201 B03 B04 B06 BC08 BC14 (to be demolished by AMLC)

IH.72.89.06
B05
WH.44.20201 40t

BC12
16t

B10 8
B08 K
A location still to be checked

1
F

M F

12
40t
16t

-Outdoor HRC Storage II

WH.22.20204 WH.22.20205
C WH.24.20202
IH.8214
WH.33.20201
E
MLUP MLUP

Blocker Roller
capacitation

Station
MLUP
D J

change stools

lifting device
lifting device

Backup roll
Backup roll

Work roll
RM & FM

for FM
WH.22.20202

FM
WH.22.20201 WH.22.20203 WH.31.20201
WH.17.20201 WH.16.20201
IH.72.89.07

11 WH.35.20202 AM50pax
ROUGHER W.R. TOP

ROUGHER W.R. BOTTOM

ROUGHER W.R. BOTTOM

ROUGHER W.R. BOTTOM

ROUGHER W.R. BOTTOM

10
L WH.24.20201 WH.35.20201
bottom d.s.

bottom d.s.

bottom d.s.

bottom d.s.
ROUGHER W.R. BOTTOM

ROUGHER W.R. BOTTOM

ROUGHER W.R. BOTTOM

ROUGHER W.R. BOTTOM

ROUGHER W.R. TOP

WH.61.20201 2 WH.44.20203
bottom o.s.

bottom o.s.

bottom o.s.

bottom o.s.

Racks for temporary storage of return coils from coil storage


(3 coil positions for receiving, 3 for dispatch)

IH.8215

B09
G
WH.44.20202
B13
B02 6 B07
BC11 B14
7 BC02
BC10

4"Ø

2"Ø
4"Ø
2"Ø
4"Ø

4"Ø
4"Ø R-3
I
2"Ø

6"Ø 2"Ø

4"Ø

6"Ø

6"Ø
N=+3.58 2"Ø
ACCESO

6"Ø
2"Ø

6"Ø
R-4

BC07 BC06
Plant ±0.00 = +4750 above sea level

-Outdoor HRC Storage I


00
Revision Modification Contents Date Made by Checked by

Customer Doc No.

V1.6
Project Sub Supplier
AM LC
Sub Supplier Doc.No.

Plant Date Name


Hot Strip Mill
PROYECTO: ArcelorMittal Lázaro Cárdenas Made by
14.12.2017 F. Ploecking
HSM + HSPM Area
General engineering Checked by
14.12.2017 F.Schmoller
Approved by
CONTROL DOCUMENTAL Equipment Material
Layouts
Mass (kg)

DOCUMENTO Subgroup Security Level

Status
-
Checked
SOLO PARA INFORMACIÓN Drawing Name
Construction Area Layout first draft Document Type
Layout drawing

Material No. Version Scale Size


1/700

1 3a 5a 5b 10 15 20
Sheet No. of Sheets
1 1
Drwg. No. PLM-ID Revision

C.7WY0.WH.02.201/LAY________ 00

You might also like