This document provides calculations of quantities for construction materials needed for tower foundation number one of the Lamahi-Jaluke 33KV transmission line project near the Rapti River in Nepal. It lists seven items needed: excavation, rubble masonry filling, PCC, foundation concrete of various parts of the tower, wooden forms, tor steel reinforcement bars, and a gabbion wall. The quantities calculated include 80.64 cubic meters of excavation, 126 cubic meters of rubble masonry, 2.352 cubic meters of PCC, 13.49 cubic meters of foundation concrete, 26 square meters of wooden forms, 1513.56 kilograms of reinforcement bars, and 75 cubic meters of gabbion wall
This document provides calculations of quantities for construction materials needed for tower foundation number one of the Lamahi-Jaluke 33KV transmission line project near the Rapti River in Nepal. It lists seven items needed: excavation, rubble masonry filling, PCC, foundation concrete of various parts of the tower, wooden forms, tor steel reinforcement bars, and a gabbion wall. The quantities calculated include 80.64 cubic meters of excavation, 126 cubic meters of rubble masonry, 2.352 cubic meters of PCC, 13.49 cubic meters of foundation concrete, 26 square meters of wooden forms, 1513.56 kilograms of reinforcement bars, and 75 cubic meters of gabbion wall
This document provides calculations of quantities for construction materials needed for tower foundation number one of the Lamahi-Jaluke 33KV transmission line project near the Rapti River in Nepal. It lists seven items needed: excavation, rubble masonry filling, PCC, foundation concrete of various parts of the tower, wooden forms, tor steel reinforcement bars, and a gabbion wall. The quantities calculated include 80.64 cubic meters of excavation, 126 cubic meters of rubble masonry, 2.352 cubic meters of PCC, 13.49 cubic meters of foundation concrete, 26 square meters of wooden forms, 1513.56 kilograms of reinforcement bars, and 75 cubic meters of gabbion wall
Distribution And Cosumer Service Directorate Butwal Regional Office Lamahi-Jaluke 33KV Transmission line Project Site : Rapti River Crossing Calculation of Quantity of Tower No. One
AS PER ACTUAL As per Different
S.N Description Unit No. length Breadth height Quantity BOQ Quantity A Construction of tower foundation in different types of tower includining supply of construction of materials 1.1 Excavation of foundation (pit in good fair types soil including site clearing disposal as directed by the employer tower staking tower orientation pit making shoring dewatrering etc. all complete before and after the work) ( hard soil / Gravel / BMS ) cu.m. 4 2.4 2.4 3.5 80.64 78.09 2.55 1.2 Hard rock cu.m. 4 2.5 2.5 2.5 62.5 62.5 2 Rubble Masonry filling work in foundation cu.m. 4 3 3 3.5 126 3 PCC 1:3:6 for foundation for tower foundation cu.m. 4 2.8 2.8 0.075 2.352 1.57 0.782 4 foundation concrete M20 in foundation footing pad and chmney including cube testiing and stub etc all complete as per drawing and specification Raft Portion 1st Pad cu.m. 4 2.4 2.4 0.3 6.912 Raft Portion 2nd Pad cu.m. 4 1.45 1.45 0.2 1.682 Inclined Portion cu.m. 4 0.5 0.5 3.75 3.75 coping cu.m. 4 2.4 2.4 0.03 0.691 total concreting cu.m. 13.49 13.49 5 Preparation of wooden form collection of matrials, nailing, removing and placing as per drawing as including transportation raft portion sq.m Inclined Portion sq.m 4*4 0.5 3.25 26 26
6 Tor Steel Reinforcement bar
including bending & binding Kg 1375.96 10 % Wastage Kg 137.59 Total kg 1513.56 1218 295.56 7 Gabbion wall cu.m 3 layer 25 1 1 75