This document provides a work breakdown structure (WBS) wise report on costs incurred for various construction projects. It lists 4 WBS codes for concreting work totaling Rs. 1200 spent across 4 general ledger codes, with Rs. 400 against the first, Rs. 300 each against the second and third, and Rs. 200 against the fourth. A table at the bottom summarizes the costs by general ledger descriptions and expenditure categories.
This document provides a work breakdown structure (WBS) wise report on costs incurred for various construction projects. It lists 4 WBS codes for concreting work totaling Rs. 1200 spent across 4 general ledger codes, with Rs. 400 against the first, Rs. 300 each against the second and third, and Rs. 200 against the fourth. A table at the bottom summarizes the costs by general ledger descriptions and expenditure categories.
This document provides a work breakdown structure (WBS) wise report on costs incurred for various construction projects. It lists 4 WBS codes for concreting work totaling Rs. 1200 spent across 4 general ledger codes, with Rs. 400 against the first, Rs. 300 each against the second and third, and Rs. 200 against the fourth. A table at the bottom summarizes the costs by general ledger descriptions and expenditure categories.