CS Produktion Plannung
CS Produktion Plannung
CS Produktion Plannung
CS WW v3.63
Tutorial
English Version
This material is owned by CS Indonesia, not for sold separately from CS software package Copyright © 1995 by CS Germany All rights reserved. No
part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other
electronic or mechanical methods, without the prior written permission of CS Indonesia, except in the case of brief quotations embodied in critical
reviews and certain other noncommercial uses permitted by copyright law. For permission requests, write to CS Indonesia.
Contents
CHAPTER 1 ...................................................................................................................................................................................... 1
I n t r o d u c t i o n ............................................................................................................................................................................. 1
CHAPTER 2 ...................................................................................................................................................................................... 2
P r e p a r a t i o n .............................................................................................................................................................................. 2
2.1 Terms Definition ............................................................................................................................................................. 2
2.2 General Master Data preparation ................................................................................................................................... 8
2.2.1 Calendar Setting ................................................................................................................................................... 8
2.2.2 Resources .......................................................................................................................................................... 10
2.2.3 Bill of materials ................................................................................................................................................... 13
2.2.4 Resource Routing ............................................................................................................................................... 17
2.3 Create a production order ..................................................................................................................................................... 22
CHAPTER 3 .................................................................................................................................................................................... 30
E x e c u t i o n ................................................................................................................................................................................. 30
3.1 Material Requirement Planning .................................................................................................................................... 30
3.1.1 Job order / made to order case example ............................................................................................................. 30
3.1.2 Mass production case example........................................................................................................................... 35
3.2 Resource Utilization ..................................................................................................................................................... 42
3.2.1 Create and edit resources in a production order ................................................................................................. 44
3.2.2 Re-sort Resource Usage .................................................................................................................................... 45
3.3 Production Planning ..................................................................................................................................................... 46
3.4 Production Costing ....................................................................................................................................................... 49
3.5 Reports ........................................................................................................................................................................ 52
3.5.1 System – Administration – Resources – Using.................................................................................................... 52
3.5.2 System – Administration – Resources – Overview .............................................................................................. 53
3.5.3 Master Data – Item – Print – Sets ....................................................................................................................... 53
3.5.4 Master Data – Item – Print – Part List ................................................................................................................. 54
3.5.5 Master Data – Item – Print – Production Part List................................................................................................ 54
3.5.6 Master Data – Item – Print – Set tree .................................................................................................................. 55
3.5.7 Master Data – Item – Print – In Which Set .......................................................................................................... 55
3.5.8 Add-On - Production – Resource Utilization ........................................................................................................ 56
3.5.9 Add-On – Statistic Module – Special Reports – Production – Material Usage ..................................................... 56
3.5.10 Add-On – Statistic Module – Special Reports – Production – Resource usage ................................................... 56
3.5.11 Add-On – Statistic Module – Special Reports – Production – Cost Planning ....................................................... 57
3.5.12 Add-On – Statistic Module – Special Reports – Production – Cost Actual ........................................................... 57
3.5.13 Add-On – Statistic Module – Special Reports – Production – Quantity of Resources .......................................... 58
3.5.14 Add-On – Statistic Module – Special Reports – Production - Serial Number labels ............................................. 58
3.5.15 Add-On – Statistic Module – Special Reports – Production - Production Qty Report ........................................... 59
3.5.16 Add-On – Statistic Module – Special Reports – Produciton - Production Profit Report ........................................ 59
3.5.17 Add-On – Statistic Module – Special Reports – Production – Production List ...................................................... 60
CHAPTER 1
Introduction
In general, the production module is divided into 2 major sections, the materials
management, and the resources planning.
Figure 1.100
Each of the sections will require different master data. All these data should be prepared
before running all the production module commands. Missing master data information
could cause a different suggestions from the system.
Requirement
This module should be supported by CS Warehouse Management System and CS
Material Requirement Planning Module. However, and independent implementation of
production planning module is also possible with some disabled features.
Disclaimer
All features are available on version 3.6, coming soon features will be available in version
3.7. The content of this reference may change without prior notice due to routine update
and upgrade sequence.
This reference is not sold separately from the CS Production Module. All rights reserved.
Unauthorized duplicate copies of this reference is prohibited under the law of intelectual
proprietary rights.
Page 1 of 63
CHAPTER 2
Preparation
c. Production costing
The system will calculate the finished goods cost based on materials usage.
Methods
CS Production module support several methods in the production planning and lean
manufacturing concept:
a. Forward Scheduling
Forward scheduling is planning the tasks from the date resources become
available to determine the shipping date or the due date
Production Delivery
Customer Material Production
finished date to
Order Date Arrived Start Date
date customer
Figure 2.1.100
In backward production scheduling, there is a Just in Time (JIT) option available. The
JIT option will make sure that all related resources (material, people, and machine)
are scheduled to be finished or available at the exact defined time based on the
customer due date requirement not earlier nor later. See figure 2.1.101.
Page 2 of 63
Customer
Finished Goods Production Material Purchase Order
Required Due
availability date Start Date availability date Date
Date
Figure 2.1.101
Bill of materials
Bill of materials is a list of the raw materials, sub-assemblies, intermediate assemblies,
sub-components, parts and the quantities of each needed to manufacture an end
product. See Chapter 2.2.3 for more details.
Figure 2.1.102
Case Example,
A painting process in a machine needs 3 hours of process doesn’t matter how many quantity of the
item inside the machine.
b. Delivery time [Qty]: The required time to deliver or to produce the item with quantity
dependence.
Page 3 of 63
Case Example,
An assembling process time of a car is 8 hours per car.
c. Mixed possibilities
If both delivery time [base] and delivery time [qty] is defined following formula will
be applied:
Case example,
A car production time is in any case needs a 3 days preparation, and additional 8 hour per car.
Entry In the delivery time [base] = 3 days, and in the delivery time [qty] = 8 hours.
So when a production order of 10 car is created, the total delivery time will be:
3 days + (8 hours x 10 car) = 104 hours (assuming 1 day = 8 workhours)
“Availability” definition
In some production process, there is a possibility that a material should be available
in the warehouse several hours/days/week before or after the production start.
Case Example:
The material 1 should be arrived in the warehouse at least 1 days before the production start, but
material 2 should be arrived 5 days before the production start for preliminary inspection.
Page 4 of 63
Raw Material 1
Semi Finished [Order Related off]
Goods 1
[Order Related on] Raw Material 2
Finished Goods
[Order Related on] [Order Related off]
Raw Material 3
[Order Related on]
Figure 2.1.104
In figure 2.1.104, the system will create an automatic production order for “Finished
Goods” and “Semi-Finished Goods 1”. The system will create automatic Purchase
Order only for “Raw Material 3”.
To set up this switch: Master Data – Item – Purchase Tab – Order Related Purchase
Figure 2.1.105
Page 5 of 63
Figure 2.1.106
Production Orders
Production order is a document that indicates how many finished products have to be
produced, when, where, with what materials, and in which resources. See Chapter
3.1.2 for more details.
Figure 2.1.107
Add-On – Production – Production Overview
Add-On-Production-Production Plan (New)
Page 6 of 63
End time =
Start time + lag time + preparation time + (usage duration x resource max usage x resource productivity factor) + <non-
working time>
Case Example:
A resource start to work at 08:00 AM, and the resource need 5 minutes warming up preparation, and
there is no lag time from previous process. The resource maximum usage 100%, and productivity factor
is 100%. The resource has to produce 100 pcs of goods, with 1 minute duration per each. There is 15
minutes non-working time meanwhile.
Figure 2.1.108
Example: A machine can print 5 different items at the same time in a chained
conveyor. Thus, the Maximum Usage is 500%
Slot 1 : Item 1
Slot 2 : Item 2
Slot 3 : Item 3
Slot 4 : Item 4
Slot 5 : Item 5
Figure 2.1.109
Resource Utilization
The resource utilization is resource capacity divided by the production task assigned
to it.
Page 7 of 63
A resource is capable of doing 5 production task (500% maximum usage) at the same
time in a chained slot. But only one task is assigned to this resource. That means this
resource utilization is only 20%.
Slot 1 : Task 1
Slot 2 : Empty
Slot 3 : Empty
Slot 4 : Empty
Slot 5 : Empty
Figure 2.1.110
General Calendar
Config Setting
Production
Module
Resources
Resources
Routing
Bill of
materials
Figure 2.2.100
Red Color = Mandatory master data for minimum production module usage.
Go to System->Administration->Calendar
Page 8 of 63
Figure 2.2.1.100
Non Man-days
A weekly rest time/holiday for the resources.
Holidays
The standard holiday
Other Holidays
Additional holidays
Non-Working time
Additional periodic holidays
Daily worktime
Daily productive time
Page 9 of 63
Figure 2.2.1.101
If there are different working time for each resources then, more than one
different calendars should be registered here. For example, if the working group
A work in the morning and working group B work in the night (figure 2.2.1.102)
Figure 2.2.1.102
2.2.2 Resources
Resources can be a worker, a machine, a group of workers, or a group of
machines.
Worker /
Group of
Workers
Resources
Machine /
group of
similar
machines
Figure 2.2.100
Go to System->Administration->Resources
Page 10 of 63
Figure 2.2.2.101
Matchcode
Resources searching code
Group
Group is used for organizing equivalent resources
Figure 2.2.2.102
Selections
Resources can be divided into different allocations. This organization is
completely independent of the group organization by the field 'group'. In addition
resources can belong to several allocations here.
Page 11 of 63
[Resource Group] [Resource Group]
Cutting Machine Printing Machine
Figure 2.2.2.104
Description
The description of the resource can be registered here
Calendar
This resource can have a different calendar than the default calendar. If there is
no entry, the ~default calendar will be used.
Case Example:
A working group with 3 members has similar working capacity can be defined as 1 resource.
The work procedures are implemented by in each case by a member of the group. Thus the
resources can implement 3 work procedures at the same time. Therefore a maximum using of
300% is allowed.
Page 12 of 63
Resources 2
100%
maximum
Resources 1 usage Resources 3
100% 100%
maximum maximum
usage usage
Can be Combined
to
1 RESOURCE with
300%
Maximum Usage
Figure 2.2.2.105
Bill of materials could have several levels, depends on how many controlled
work in process item in a production flow.
Case Example:
A Personal computer sets contains 1 CPU, 1 Monitor, 1 Keyboard, and 1 Mouse. And the CPU
contains 1 Mother board, 1 Power Supply, 1 Hard drive, 2 pieces of RAM chip, 1 VGA card.
Page 13 of 63
Figure 2.2.3.101
To view the structure of the bill of material use the “Set Explorer”
Figure 2.2.3.102
Page 14 of 63
Figure 2.2.3.103
Item No
The material item number
Quantity
The needed quantity
Multiplier
Multiplication factor. Can be used for better information of the bill of materials.
Case Example:
To produce 10 CPU, a 12 meter of electric cable is required. And the cable itself is stored in a
roll of 12 meter.
Instead of entering 1.2 meter per CPU. It is possible to put 12 meter with multiplier 0.1.
Percentage
If a bill of material is a formula with percentage. The percentage can be
calculated to the weight, height, length or width.
Case example:
1 Liter of orange juice needs 30% orange, 60% water, 10% sugar.
In this case a weight percentage is needed.
Part No
Describe the part no, if more than one identical material code is needed.
Page 15 of 63
Available
Each materials can have different availability time.
Negative number means material should be available “before” the required date.
Figure 2.2.3.103
In figure 2.2.3.103 the Keyboard should be available 1 day before the required
date
Remark
Is a remark
Figure 2.2.3.103
Figure 2.2.3.105
Case Example
A CPU is a semi-finished goods item. Every time a customer order a CPU, the production order
will be automatically created, and all the related material request are triggered. The CPU
materials are: Motherboard, VGA Card, Power Supply, RAM Chip. All these materials should be
ready in the warehouse 1 day before the production start except motherboard which needs 3
days for preliminary inspection. The materials come from the same supplier which needs 3 days
to deliver to our warehouse. The production process duration of the CPU is 2 day with no
quantity dependence (doesn’t matter how much the order quantity the production duration is the
same).
Following table describes the settings of this case in the CS Production Module:
Page 17 of 63
a. 1 Operator, duration : 45 Minutes / CPU
b. Assembling machine, Duration : 60 Minutes / CPU
The assembling machine resource start after the operator finishes his job, with 5 minutes setup
time to put the item to the machine.
Figure 2.2.4.101
Resource List
Figure 2.2.4.102
Resource Overview
Page 18 of 63
Figure 2.2.4.103
Resource Overview
Remark
Is a remark
Predecessor
A process / a resource which executed before the current resource.
Cutting Assembling
Process Process
Painting
Process
Figure 2.2.4.104
Connecting / Coupling
The relation between current processes with the predecessor
There are 4 options:
1. End-Begin (common)
The current process will start when the predecessor has finished.
Figure 2.2.4.105
2. End-End
The current process end and the predecessor end is related.
Page 19 of 63
Figure 2.2.4.106
3. Begin-Begin
The current process and the predecessor is related.
Figure 2.2.4.107
4. Begin-End (Not Common)
The predecessor begin and the current process end is related.
Figure 2.2.4.108
Lag Time
The time interval between the current process and the end time of the
predecessors.
Entries Example:
Connecting Lag Time Meaning
entries
End-Begin 3.5 Hours The beginning of the current resource lies 3.5 hours
after the end of the predecessor
End-Begin -2 Hours The beginning of the current resource lies 2 hours
before the end of the predecessor
Begin-Begin 3.7 Days The beginning of the current resource lies 3.7 days
after the beginning of the predecessor
Begin-End 8 Hours The end of the current resource lies 8 hours after the
beginning of the predecessor
Begin-Begin 25 The beginning of the current resource is appropriate
Percent for 25% of the duration of the predecessor
Start Time
The time interval before the current process start if there is no predecessor.
Entries Example:
Start time Meaning
entries
0 Days The current resource begins at the same time as the
production order.
3 Hours The current resource begins 3 hours after the production
order start.
-5 Hours The current resource begins 5 hours before the production
order start.
Page 20 of 63
Duration
Duration is how long the resource usage per 1 unit of the item.
The duration is always counted starting from the starting date of the resources
usage. This starting date is fixed either by the predecessor or by the start of
production order. Different functions can be implemented depending upon
entered value.
If the value is 0 (or no value), the resources usage ends at the end date of
production order.
If a positive value is entered, this is one duration. Input of a negative value: The
usage of resources ends before the end of production order, as much, as the
negative value indicates.
Entries Example:
Start Duration Meaning
Time Entries
entries
0 Days 0 Days The resource usage begin with the start of the
production order and ends at the production order
3 Days 0 Days The resource usage begin 3 days after the start of the
production order and ends at the production order.
0 Days 5 Days The resource usage begin with the production order
and takes 5 days long.
4 Days 3 Days The resource usage begin 4 days after the start of the
production order and takes 3 days long.
2 Days -4 Days The resource usage begin 2 days after the start of the
production order
-3 Days 5 Days The resource usage begin 3 days before the start of
the production order and takes 5 days long.
-3 Days -2 Days The resource usage begin 3 days before the start of
the production order and ends 2 days before the
production order ends.
Using (%)
This field indicates how many percent the resource is utilized.
Default entry is 100%. Which means the resource is occupied 100% and cannot
do another task.
Case Example 1:
A painting machine can paint 4 different items at the same time with the same color. Therefore
when creating the routing for item 1, the resource using (%) of the painting machine is 25%.
Case Example 2:
Mr. X is an operator of two cutting machine, he can setup two machine in the same time. Item 1
will use cutting machine 1, and Item 2 will use cutting machine 2, and the cutting process start
Page 21 of 63
at the same time. Therefore when creating the routing for item 1, the resource using (%) of Mr.
X is 50%.
Order
Confirmation
Manual Material
Creation Request
Production
Order
Figure 2.3.100
Page 22 of 63
Figure 2.3.101
Production Order Basic Data
Description
Description of the production
Status
The current status of the production (manual input).
Text
Auto Updated information
Prod. Location
Production location
Storage (Dest)
The destination storage for the finished goods item of the current production order
Storage (Prod)
Production Storage of the current production order
Storage (Main)
If the main material storage is not identical with the configured main storage, fill in
the material storage here. From this storage the material will be taken when
production material is transferrred to the production storage.
Quantity
Page 23 of 63
The quantity of the produced items. In the disassembly mode, the material
quantity.
Defect Quantity
The defect quantity
Production start
Start date and time of the production
Production deadline
End date and time of the production
Transaction
Underlying transaction in case of an order related item.
Parent Production
In a multilevel bill of materials, the production order is generated level by level in a
child-parent relationship
Remark
Remark field
Approved
Approval of a production order. An IQ102 or supervisor authorization level is
required to approve a production order.
If a resource is needed but occupied, the production step will be executed as soon
as the needed resource is available.
Freeze
In normal case the flow of the production steps is re-calculated whenever the data
of the production order is changed.
If this flag is set, no re-calculation is initiated and the flow of the production is not
changed.
Page 24 of 63
place. Normally changed date e.g quantity, deadline or storage from the customer
order are transferred automatically to production order.
Disassembly
In normal case the main item is created during production process. If this flag is
set the the set-items will be created from the main item during production.
(E.g. Disassembling a car into its parts)
Finished
Material Goods 1
2
Material Material
1 3
Material
Finished
Finished Finished
Goods Goods 2 Goods 3
Figure 2.3.102
Left: Assembly, Right: Disassembly
Finished
Flag marks a completed production order. The flag is set automatically on supply
of the total quantity.
Booked
This flag marks a production order which is completely booked in the financial
account. The flag is maintained automatically by the financial account module.
TAB PROPERTIES
Page 25 of 63
Figure 2.3.103
Production Order Properties
Cost Center
In normal case the cost centers are assigned in the master data of the impersonal
accounts. If the actual production has to be booked to a special cost center, enter
the cost center here. This input has priority.
Cost Unit
In normal case the cost units are assigned in the master data of the impersonal
accounts. If the actual production has to be booked to a special cost unit, enter the
cost unit here. This input has priority.
Calendar
In normal case the standard calendar or the calendar of the resource is used. If a
production uses it’s own calendar this calender has to be referenced here.
Defect storage
A common defect storage is defined in the configuration. If the defect finish goods
of the actual production have to booked to a spacial defect storage, this storage
can be defined here.
Actual user
The reminder will be set to this user at the resubmission date
Resubmission Date
The reminder date
TAB MATERIALS
A production set is the sum of all items, which are required for the associated
production order. With the creation of production order, the set of items needed
(bill of material) are copied into the production set. The set can be modified for
Page 26 of 63
each production order. The current condition of the production set is represented
in the form of a list.
Figure 2.3.104
Production Order Materials
New
Add new material into the set. Adding material in this dialog will not change the bill
of material (master data item part list).
Edit
Edit the material in the set. Editing the material information in this dialog will not
change the bill of material (master data item part list).
Delete/Delete All
Delete the material in the set. Deleting the material information in this dialog will
not change the bill of material (master data item part list).
Reload
Reload the material set information from the item master data (Bill of material)
[ 1/n ] and [ * ]
Input a multiplication or divisor factor.
Page 27 of 63
Figure 2.3.105
Production Order Material – New / Edit
Quantity
The quantity of needed material. In case of disassembly, the quantity of finished
goods product.
Multiplier
The multiplication or division factor.
2. In a disassembly production
Use the [1/n] button and type the resulting quantity of the finish goods before
every delivery.
Part no
Each component can be set with its own name. With electronic building groups
e.g. resistances can to be designated with 'R1' ... 'R..'.
Page 28 of 63
Repeated call of a component
The same item-no. can often be used in a set, as long as it is guarantee that in
addition a different part-no is indicated in each case. If item-no and part-no of an
existing component are shown, then the existing component is overwritten by the
new data.
This field is taken over from the original set with creation of production set.
Available
Enter the period of time when the actual material has to be available after start of
production. See chapter 2.2.3
Deadline
If another date to a current component than for production order is to be
considered, the deviating date is to be registered here. If no special date is
registered here, the deadline of the production and the contents of “Available„ will
be used.
Purchase Price
The average price or the last price of the material
Storage No
In case the material is stored in a different warehouse than the defined warehouse
of the production order
Following data are carried by the system automatically and serve for information:
Quantity accounted
Total quantity of the component, which will be deducted by the stock due to
current production order.
Requested quantity
Quantity of the material request, which will be produced due to current
production order.
Page 29 of 63
CHAPTER 3
Execution
Customer
Finished Goods Production Material Purchase Order
Required Due
availability date Start Date availability date Date
Date
Figure 3.1.1.101
Backward production planning
This method require a certain customer deadline date as a critical point to plan
everything.
Case example,
A factory produce a custom made to order CPU. The salesman will receive the order from a
customer with a certain delivery date. The factory has to produce the requested product and deliver
it in time.
The factory has no material on stock, due to the fast movement and fast changing CPU
components, so the factory will plan to buy the material only when the customer order is received.
The production time of the CPU is 1 day, the delivery time of the material from the supplier is 1
days with a general delivery time buffer of 1 day.
The customer order is 19.10.2015 and the deadline is 30.10.2015, the customer order 2 units of
CPU.
Solution
Step 1:
Create the bill of material of the CPU is as in figure 3.1.1.102:
Figure 3.1.1.102
Bill of materials
Page 30 of 63
Step 2:
All the materials has to be arrived in the factory 1 day before the production start.
In the part list setup, -1 days should be entered in the “available” field.
Figure 3.1.1.103
Step 3:
The production order of the finished goods will be raised when the customer order
received, and all the materials has to be purchased when the customer order
received, this means the finished goods item and the materials items has to be
“Order Related Purchase” item.
Figure 3.1.1.104
Step 4:
The CPU item is a manufacture in house item. Set this switch on.
Figure 3.1.1.105
Page 31 of 63
Step 5:
The delivery times for the CPU is 1 day / per CPU and the material is 1 days doesn’t
matter the quantity.
Set the delivery times in the master data – item – purchase tab
Figure 3.1.1.105
CPU Delivery Time
Figure 3.1.1.106
Materials Delivery Time
Step 6:
Set the general delivery buffer time, in System – Administration – General.
Figure 3.1.1.107
Step 7:
Create the order confirmation of the customer with the deadline 30.10.2015
Page 32 of 63
Figure 3.1.1.108
Material Request
Production Order Purchase Order Date:
25.10.2015
Begin Date:
(JIT option is On)
28.10.2015
19.10.2015
Deadline: (JIT option is off)
30.10.2015 Deadline:
27.10.2015
Calculation formula:
Production Begin date = Order Confirmation Deadline - Finished Goods Delivery Time (base) -
(Finished goods delivery time (qty) * order quantity)
Page 33 of 63
Production deadline = 30.10.2015
Purchase Order Date (JIT) = Order confirmation deadline – finished goods total delivery time –
material availability – supplier delivery time – general delivery time buffer
Purchase Order Deadline (JIT) = Order confirmation deadline – finished goods total delivery time
– material availability
Purchase Order Deadline (Non JIT) = Order confirmation deadline – finished goods Total delivery
time – material availability
Notes:
To turn on the JIT (just in time) option, open the material request and click the
“Order Just In Time”. To make it default, make a ~MUSTER material request for it.
Figure 3.1.1.109
Page 34 of 63
Result Screenshot
Figure 3.1.1.110
Order Confirmation
Figure 3.1.1.111
Production Order
Figure 3.1.1.112
Material Request
The planning department create a series of production orders with the date and
deadline based on their forecast data.
Usually the mass production has a repeated product with the same bill of materials.
Therefore the material planning should consider the current stock availability, the
minimum stock should be available, the current material request, the current
purchase orders and the minimum purchase quantity.
Case Example,
A CPU manufacturer produce a standard model of a CPU for the mass market. The forecast data
shows that in December they will need 25 unit of the CPU, and in January 10 unit of the CPU.
The production time of the CPU is 1 day, the delivery time of the material from the supplier is 1
days with a general delivery time buffer of 1 day.
All materials should arrive 1 day before the production start.
Page 35 of 63
Solution:
Step 1:
Create the Bill of materials as in figure 3.1.2.100
Figure 3.1.2.100
Bill of materials
Step 2:
All the materials has to be arrived in the factory 1 day before the production start.
In the part list setup, -1 days should be entered in the “available” field.
Figure 3.1.2.101
Set the available day
Step 3:
The CPU item is a manufacture in house item. Set this switch on.
Figure 3.1.2.102
Set the manufactured in house flag
Step 4:
The delivery times for the CPU is 1 day / per CPU and the material is 1 days doesn’t
matter the quantity.
Page 36 of 63
Set the delivery times in the master data – item – purchase tab
Figure 3.1.2.103
CPU Delivery Time
Figure 3.1.2.104
Materials Delivery Time
Step 5:
Set the general delivery buffer time, in System – Administration – General.
Figure 3.1.1.107
Step 6:
Create two production orders.
Dated: 5.11.2015 with 25 quantity and 30.11.2015 deadline
Dated: 20.12.2015 with 10 quantity and 31.12.2015 deadline
Page 37 of 63
Figure 3.1.2.105
Production Order 1
Figure 3.1.2.106
Production Order 2
Page 38 of 63
Step 7:
Run the MRP calculation. Go to Master Data – Material Request – Create.
Figure 3.1.2.107
Item Selection
Enter an item selection if not all kind of material needs to be calculated. Usage
example, if in one MRP session only one item group should be processed then
an item group filter is necessary.
Figure 3.1.2.108
Address Selection
Page 39 of 63
Figure 3.1.2.109
Configuration of material request
The available quantity = On hand stock qty – order confirmation qty – production
order qty.
The system will calculate the material needed with following formula:
Calculation Consider Formula
based on Substitute
stock
quantity
V V New request qty = Minimum Stock qty - On stock qty - Substitute item qty – requested
qty – purchased qty
V X New request qty = Minimum Stock qty - On stock qty – requested qty – purchase qty
X V If Minimum stock > available qty:
New request qty = Minimum stock - Available qty – Requested qty – purchased –
Substitute Item qty
Page 40 of 63
Figure 3.1.2.110
Material Requirement Calculation Result
The system will automatically calculate and split the required materials in
separate material request per items and deadlines.
Deadlines calculation are based on the production orders start date -1 days,
because all the material should be arrived 1 day before the production start.
The purchase order date are calculated based on the supplier’s delivery time +
general delivery time buffer.
Figure 3.1.2.111
Resulting Material Requests
Page 41 of 63
3.2 Resource Utilization
When all production order are created either automatically or manually, the resources
set will be copied from the item master data – resources to the production order.
To see the resources of a production order, go to: Production Order – Tab Resources.
Figure 3.2.100
Production Resources
New
To add new resource to this production order
Edit
Edit resource information
Print
Print the visualization graph for the resource usage.
Figure 3.2.101
Print Parameter
Page 42 of 63
With sub production
The chart will display the child production order
Include Material
The chart will display when the material should be ready
Resources
usage duration
Production
Deadline
Material
Availability date
Figure 3.2.102
Resource print
The system will consider the working calendar, and will skip the non-working time
accordingly.
Figure 3.2.103
Enter a period of view
Page 43 of 63
Figure 3.2.104
Resource Utilization view
Figure 3.2.1.100
Production Resource Edit
When a production order is created, the default resources will be copied from the
item master data – resources setting.
Page 44 of 63
If the resources setting in the production order is changed, the resource in the item
master data will remain unchanged.
If the begin time of the resource is different from the production order begin date
or the end of the predecessor, then “Absolute” switch should be turn on, and enter
the correct date and time.
Figure 3.2.1.101
Absolute start time
The percentage of finished process could be entered in the Finished [%] field. It
will give a different color in the resource chart print.
Figure 3.2.1.102
Finished [%] progress
75% progress is
finished
Figure 3.2.1.103
Finished [%] progress in chart
Figure 3.2.2.100
Resource utilization chart
Page 45 of 63
One of the possibilities is the user change manually the start date and time until
the resource is not overlapping.
Figure 3.2.2.101
Simulation or change
Figure 3.2.2.102
Result
The system will detect which resources are overlapping one another. If in the
“Simulation” mode, no changes will be occurred. If in “Change” mode, the system
will search the most proper time which is not overlapping with another resource
and change the production order accordingly.
3.3 Production Planning
If all production order data with the material planning and resource routing already in
the database. The system could help to determine when is possible for an item
requested to be produced based on current availability of the materials and resources.
However the production planning function here is designed for giving a suggestion to
the user when is the possible time to produce something.
Page 46 of 63
Case Example,
In a CPU manufacturing company, the current resource usage is as follows
Figure 3.3.100
Production Planning
Figure 3.3.101
Production Planning
Items
Enter the item name here
Quantity
Enter the desired quantity
Deadline
Enter the desired deadline of the production
Page 47 of 63
If checked, the system will test the entered deadline whether it is possible or not, then
repeat the check by increasing date by date until the system find a possible deadline.
Figure 3.3.102
Production Planning
If an entered deadline is not a possible date, the system will indicate a yellow mark.
Top Priority
An activated switch means:
All material which is reserved for other productions can be used. All resources are
available without restrictions and independent of reservation by other productions.
If the switch is not activated, only the not reserved quantity of the material will be used
(The rest will be purchased) Resources will be used only if they are not reserved by
other productions.
The result from above example with “search for possible deadline” function is:
Page 48 of 63
Figure 3.3.103
Production Planning
Figure 3.3.104
Resource Utilization overview
The production will start on 21.10.2015 10:06 and will skip the holiday and ends at
26.10.2015 14:21
Figure 3.4.100
COGM & COGS components
Page 49 of 63
All the direct and indirect cost can be entered as a part list of a finished goods items.
What to control:
1. Basically all the material cost will use the sum of average purchase price of all
materials. However the user can decide the pricing calculation based on the
average purchase price or the last purchase price.
2. The other cost except the material will use a standardized accrual costing.
Example:
Figure 3.4.101
Part list
In figure 3.4.101, the CPU has several materials as the components. The cost of the
produced CPU per unit will be the sum of all purchase price of the components.
Important Notes: Since the average purchase price will always change from time to
time, the production cost will be calculated based on the average purchase price at
the time of production delivery booking.
If the purchase price in the production order should be maintained/remain the same
as when the production order is created, a “Freeze” switch should be activated in the
production order.
Page 50 of 63
Freeze
Figure 3.4.102
Production Freeze
If the last purchase price of the material should be use instead of the average
purchase price, switch on “Use last pu. Price” switch.
The planned cost will be listed in the item master data part list.
The Actual cost will be listed in each production order of that item.
More detail example:
Figure 3.4.103
Part list with factory overhead and operational expense
Page 51 of 63
Important configuration:
In order to maintain the production cost of a finished goods, following switch in the
System – Administration – General should be set:
Calculate set-prices
switch should be set
Figure 3.4.104
General Config – Calculate set prices
Figure 3.5.1.100
Page 52 of 63
To print this list go to : Add-On- Statistic module – Special Reports – Production
– Resource usage.
Figure 3.5.2.100
3.5.3 Master Data – Item – Print – Sets
This menu will display the bill of materials / part list of a finish goods item include
the material sufficiency status.
Figure 3.5.3.100
Page 53 of 63
3.5.4 Master Data – Item – Print – Part List
This menu will display the bill of materials / part lists including the sub part list.
Figure 3.5.4.100
Figure 3.5.5.100
Page 54 of 63
3.5.6 Master Data – Item – Print – Set tree
This menu will display the structure of the bill of materials/part list.
Figure 3.5.6.100
Figure 3.5.7.100
Page 55 of 63
3.5.8 Add-On - Production – Resource Utilization
This menu will display a visual chart of a resource utilization in a certain period
Figure 3.5.8.100
Figure 3.5.9.100
Page 56 of 63
Figure 3.5.10.100
Figure 3.5.11.100
Page 57 of 63
Figure 3.5.12.100
Figure 3.5.13.100
3.5.14 Add-On – Statistic Module – Special Reports – Production - Serial Number labels
This menu is used for creating a serial number labels of a finished product.
Page 58 of 63
Figure 3.5.14.100
This menu will show the production delivery quantity report of a production order.
Figure 3.5.15.100
This report will show the cost comparison between the bill of material with the
actual cost and actual sales price.
Figure 3.5.16.100
Page 59 of 63
3.5.17 Add-On – Statistic Module – Special Reports – Production – Production List
This menu will display the complete information of production order in a certain
period.
Figure 3.5.17.100
Page 60 of 63
How to contact CS SOFTWARE Office
G E R M A N Y – Head Office
Computer Service Hildebrandt
Bodenseestr. 228
81243 Munich
Germany
Tel : +49 (89) 89 73 679 0
Hotline : +49 (89) 89 73 679 – 12
Email : info@cs88.de
INDONESIA
PT Nukleus Indonesia
Sales & Implementation Office
Golden Boulevard R.15
Jl. Pahlawan Seribu
15322 BSD City, Serpong
Indonesia
Tel: +62 21 5315 2543, +62 21 5370683
Email: Contact@cs88id.com
Inncius
Kopo Permai 2AD No.1
Taman Kopo Indah
Bandung
Indonesia
SINGAPORE
Sales Partner
Infantron (S) Pte. Ltd.
Blk 996, Bendemeer Road,
#06-07, B Central,
Singapore - 339944.