A. Lalu Lintas Harian (LHR) LHR20
A. Lalu Lintas Harian (LHR) LHR20
D LEP = LHR0 x c x
No Jenis Kendaraan LHR0 c e LEP
1 mobil penumpang (1+1) 1700 0.5 0.0004 0.340
2 Minibus 8 ton (3+5) 60 0.5 0.159 4.779
3 truk 2 as 10 ton (4+6) 120 0.5 0.350 21.000
4 truk 2 as 13 ton (5+8) 100 0.5 1.065 53.240
5 truk 3 as 20 ton (6+7+7) 30 0.5 1.375 20.630
TOTAL 99.989
E LEA = LHR20 x c x
No Jenis Kendaraan LHR20 c e LEA
1 mobil penumpang (1+1) 3382.64 0.5 0.0004 0.677
2 Minibus 8 ton (3+5) 119.39 0.5 0.159 9.509
3 truk 2 as 10 ton (4+6) 238.77 0.5 0.350 41.786
4 truk 2 as 13 ton (5+8) 198.98 0.5 1.065 105.936
5 truk 3 as 20 ton (6+7+7) 59.69 0.5 1.375 41.048
TOTAL 198.956
G LER = LET x FP
FP = UR/10
FP = 2.000
LER = 298.945
I Faktor Regional
curah hujan = 120 mm/th
Persentase kelandaian jalan = 7%
Persentase kend. Berat = 25.5 %
FR = 1
J Indeks permukaan (IP0)
Laston dgn roughness = 1300 mm/km
IP0 = 3.9 - 3.5
K Indeks permukaan Akhir Umur Rencana(IPt)
LER = 298.945
Klas Jalan = arteri
Ipt = 2
L Indeks Tebal Perkerasan
IP0 = 3.9 - 3.5
Ipt = 2
DDT = 5.412
LER = 298.945
FR = 1
berdasarkan Nomogram 4 didapat nilai ITP sebesar 7.3
M Tebal Perkerasan
lapis permukaan
Laston 590 kg
ITP = 7.3
D1 = 7.5 cm nilai tabel
a1 = 0.35 nilai tabel
Lapis Pondasi atas
Batu Pecah kelas A
ITP = 7.3
D2 = 20 cm nilai tabel
a2 = 0.14 nilai tabel
lapis pondasi bawah
Laston
ITP = 7.3
D3 = 14.42 cm
a3 = 0.13 nilai tabel
5.425
1.875
e
e
lhr20 = lhr0 x (1+i)^r