Professional Documents
Culture Documents
Tower 33 Pile Foundation Design For 900mm
Tower 33 Pile Foundation Design For 900mm
CPT: Tower 33
ENGINEERING, SCIENTFIC AND BUSINESS CONSULTING Total depth: 6.20 m, Date: 9/27/2018
35 JONES STREET, FREETOWN. Surface Elevation: 0.00 m
iscgsl2004@gmail.com. Tel:+23279358141
Coords: X:388123.00, Y:668188.00
Project: TRANSCO - CLSG 225KV POWER TRANSMISSION LINE Cone Type: Electronics CPTu
Location: TOWER 33 Cone Operator: Ing. Sesay
Pile properties
Shaft diameter: 0.90 m Pile shaft Group: Group IA
Tip diameter: 0.90 m Pile tip Group: Group I
Unit friction area: 2.827 m2 Pile shaft FOS: 3.00
Tip area: 0.636 m2 Pile tip FOS: 3.00
.
Pile group for bearing capacity factor k c Pile group for friction coefficient alpha
⦁ Group I: plain bored piles; mud bored piles; micro piles (grouted under low ⦁ Group IA: plain bored piles; mud bored piles; hollow auger bored piles;
pressure); cased bored piles; hollow bored piles; piers; barrettes micro piles (grouted under low pressure); cast screwed piles; piers;
⦁ Group II: cast screwed piles; driven precast piles; prestressed tubular piles; barrettes
driven cast piles; jacked metal piles; micropiles (small diameter piles grouted ⦁ Group IB: cased bored piles; driven cast piles
under high pressure with diameter < 250 mm); driven grouted piles (low ⦁ Group IIA: driven precast piles; prestresses tubular piles; jacket concrete
pressure grouting); driven metal piles; driven rammed piles; jacket concrete
piles
piles; high pressure grouted piles of large diameter
⦁ Group IIB: driven metal piles; jacked metal piles
CPeT-IT v.2.1.1.6 - CPTU data presentation & interpretation software - Report created on: 12/24/2018, 4:28:12 PM 1
Project file: C:\Users\DIJA\Desktop\LIBERIA CPT REPORT\WEEK 2\cpt 2.cpt
INNOVATIVE SOLUTION CONSULTANCY SL LTD. CPT: Tower 33
ENGINEERING, SCIENTFIC AND BUSINESS CONSULTING Total depth: 6.20 m, Date: 9/27/2018
35 JONES STREET, FREETOWN. Surface Elevation: 0.00 m
iscgsl2004@gmail.com. Tel:+23279358141
Coords: X:388123.00, Y:668188.00
Project: TRANSCO - CLSG 225KV POWER TRANSMISSION LINE Cone Type: Electronics CPTu
Location: TOWER 33 Cone Operator: Ing. Sesay
Pile properties
Shaft diameter: 0.90 m Pile shaft Group: Group IA Shaft displacement: 0.005 x Ds (where Ds = shaft diameter)
Tip diameter: 0.90 m Pile tip Group: Group I Tip displacement: 0.200 x Db (where Db = base/tip diameter)
Unit friction area: 2.827 m2 Pile shaft FOS: 3.00
Tip area: 0.636 m2 Pile tip FOS: 3.00
.
CPeT-IT v.2.1.1.6 - CPTU data presentation & interpretation software - Report created on: 12/24/2018, 4:28:12 PM 2
Project file: C:\Users\DIJA\Desktop\LIBERIA CPT REPORT\WEEK 2\cpt 2.cpt
This software is licensed to: Abdul Koroma CPT name: Tower 33
:: Tabular results ::
No Depth Thickness qt SBT Nature of kc alpha fp Cumulative
(m) (MPa) soil (MPa) fp
CPeT-IT v.2.1.1.6 - CPTU data presentation & interpretation software - Report created on: 12/24/2018, 4:28:12 PM 3
Project file: C:\Users\DIJA\Desktop\LIBERIA CPT REPORT\WEEK 2\cpt 2.cpt
This software is licensed to: Abdul Koroma CPT name: Tower 33
:: Tabular results ::
No Depth Thickness qt SBT Nature of kc alpha fp Cumulative
(m) (MPa) soil (MPa) fp
CPeT-IT v.2.1.1.6 - CPTU data presentation & interpretation software - Report created on: 12/24/2018, 4:28:12 PM 4
Project file: C:\Users\DIJA\Desktop\LIBERIA CPT REPORT\WEEK 2\cpt 2.cpt
This software is licensed to: Abdul Koroma CPT name: Tower 33
Pile properties
Shaft diameter: 0.90 m Pile shaft Group: Group IA
Tip diameter: 0.90 m Pile tip Group: Group I
Unit friction area: 2.827 m2 Pile shaft FOS: 3.00
Tip area: 0.636 m2 Pile tip FOS: 3.00
.
:: Pile bearing capacity calculations (f p restrictions applied) ::
No Tip depth q'ca qca kc qp Qs Qb Q ult Q all
(m) (MPa) (MPa) (MPa) (kN) (kN) (kN) (kN)
Abbreviations
Tip depth: Depth from free surface where tip capacity will be calculated
q'ca: Mean qt value between -a and +a (above and below pile tip depth respectively)
qca: Mean value between -a and +a according to LCPC method
kc: Bearing capacity factor
qp : Pile unit end bearing capacity
Q s: Shaft capacity
Qb: Base capacity
Q ult: Ultimate pile bearing capacity
Q alt: Allowable pile bearing capacity
CPeT-IT v.2.1.1.6 - CPTU data presentation & interpretation software - Report created on: 12/24/2018, 4:28:12 PM 5
Project file: C:\Users\DIJA\Desktop\LIBERIA CPT REPORT\WEEK 2\cpt 2.cpt