Professional Documents
Culture Documents
Floor Beams at EL - 8.630 SB1: Grade of Concrete Grade of Steel
Floor Beams at EL - 8.630 SB1: Grade of Concrete Grade of Steel
Beam Mkd. SB5a size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 59 Mu/bd2 2.018 pt 0.518 Ast 1770 4-Y25+2-Y16(X) (B)
supp +ve BM ™ 82 Mu/bd2 2.804 pt 0.761 Ast 2602 4-Y25+2-Y25` (X) (T)
at deff SF (t) 50 Tv 1.46 beta 3.82 Tc 0.578
** +ve & -ve BM supp and span respectively Vus/d = 3.536 provide Y8-4L-150
Beam Mkd. SB6 size (mm) 450 x 500 deff. = 455 min Ast 430
span - ve BM ™ 15 Mu/bd2 1.610 pt 0.403 Ast 825 4-Y20 BOT
supp +ve BM ™ 3 Mu/bd2 0.322 pt 0.075 Ast 154 4-Y16
at deff SF (t) 18 Tv 0.88 beta 7.21 Tc 0.447
** +ve & -ve BM supp and span respectively Vus/d = 1.944 provide Y8-2L-150
Beam Mkd. SB7 size (mm) 400 x 1250 deff. = 1205 min Ast 1012
span - ve BM ™ 170 Mu/bd2 2.927 pt 0.802 Ast 3864 4-Y25+4-Y25(st) `
supp +ve BM ™ 200 Mu/bd2 3.443 pt 0.987 Ast 4756 5Y25+3-Y32(x)
at deff SF (t) 62 Tv 1.29 beta 2.94 Tc 0.638
** +ve & -ve BM supp and span respectively Vus/d = 2.592 provide Y8-4L-150
Beam Mkd. SB8 size (mm) 300 x 500 deff. = 455 min Ast 287
span - ve BM ™ 4 Mu/bd2 0.644 pt 0.153 Ast 209 3-Y16 BOT
supp +ve BM ™ 12 Mu/bd2 1.932 pt 0.493 Ast 673 3-Y16
at deff SF (t) 15 Tv 1.10 beta 5.89 Tc 0.486
** +ve & -ve BM supp and span respectively Vus/d = 1.839 provide Y8-2L-150
Beam Mkd. SB9 size (mm) 400 x 1200 deff. = 1130 min Ast 927
span - ve BM ™ 103 Mu/bd2 2.017 pt 0.517 Ast 2338 4-Y25+3-Y20(st) BOT
supp +ve BM ™ 130 Mu/bd2 2.545 pt 0.677 Ast 3060 4-Y25+4-Y25(x)
SF (t) 52 Tv 1.15 beta 4.29 Tc 0.552
** +ve & -ve BM supp and span respectively Vus/d = 2.393 provide Y8-2L-125
Beam Mkd. SB10 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 65 Mu/bd2 2.223 pt 0.578 Ast 1977 4-Y25+2-Y20(ST)
supp +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 5-Y20 (T)
SF (t) 10 Tv 0.29 beta 5.02 Tc 0.519
** +ve & -ve BM supp and span respectively Vus/d = -0.904 provide Y8-2L-150
Beam Mkd. SB11 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 60 Mu/bd2 2.052 pt 0.528 Ast 1804 4-Y25+2-Y20(ST) BOT
supp +ve BM ™ 22 Mu/bd2 0.752 pt 0.179 Ast 614 4-Y25+3-Y20(X) TOP
SF (t) 28 Tv 0.82 beta 5.50 Tc 0.500
** +ve & -ve BM supp and span respectively Vus/d = 1.276 provide Y8-2L-100
Beam Mkd. SB12
size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 55 Mu/bd2 1.881 pt 0.478 Ast 1636 4-Y25+2-Y20(ST) BOT
supp +ve BM ™ 83 Mu/bd2 2.838 pt 0.772 Ast 2640 4-Y25+3-Y20(X) TOP
SF (t) 40 Tv 1.17 beta 3.76 Tc 0.581
** +ve & -ve BM supp and span respectively Vus/d = 2.353 provide Y8-2L-100
Beam Mkd. SB13
size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 55 Mu/bd2 1.881 pt 0.478 Ast 1636 4-Y20+2-Y20(ST) BOT
supp +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 3-Y20 (T) TOP
SF (t) 10 Tv 0.29 beta 6.07 Tc 0.480
** +ve & -ve BM supp and span respectively Vus/d = -0.751 provide Y8-2L-150
Beam Mkd. SB14 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 35 Mu/bd2 1.197 pt 0.292 Ast 1000 5-Y20(ST) BOT
supp +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 3-Y20 (T) TOP
SF (t) 15 Tv 0.44 beta 9.93 Tc 0.390
** +ve & -ve BM supp and span respectively Vus/d = 0.193 provide Y8-2L-150
Beam Mkd. SB15/SB16
size (mm) 500 x 1250 deff. = 1205 min Ast 1265
span - ve BM ™ 167 Mu/bd2 2.300 pt 0.601 Ast 3623 4-Y25+4-Y25(X) BOT
supp +ve BM ™ 209 Mu/bd2 2.879 pt 0.786 Ast 4733 4-Y32+4-Y25(X) TOP
SF (t) 89 Tv 1.48 beta 3.70 Tc 0.585
** +ve & -ve BM supp and span respectively Vus/d = 4.460 provide Y8-4L-125
Beam Mkd. SB23
size (mm) 400 x 1000 deff. = 955 min Ast 802
span - ve BM ™ 62 Mu/bd2 1.700 pt 0.427 Ast 1633 4-Y20+3-Y20(X) BOT
supp +ve BM ™ 101 Mu/bd2 2.769 pt 0.749 Ast 2861 4-Y25+3-Y25(X) TOP
SF (t) 48 Tv 1.26 beta 3.88 Tc 0.574
** +ve & -ve BM supp and span respectively Vus/d = 2.728 provide Y8-2L-100
Beam Mkd. SB17 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 39 Mu/bd2 1.334 pt 0.328 Ast 1123 5-Y20 BOT
supp +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 3-Y20 TOP
SF (t) 15 Tv 0.44 beta 8.84 Tc 0.410
** +ve & -ve BM supp and span respectively Vus/d = 0.114 provide Y8-2L-150
Beam Mkd. SB18 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 52 Mu/bd2 1.778 pt 0.449 Ast 1537 4-Y20+3-Y20 (ST) BOT
supp +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 3-Y20 TOP
SF (t) 15 Tv 0.44 beta 6.46 Tc 0.468
** +ve & -ve BM supp and span respectively Vus/d = -0.117 provide Y8-2L-150
Beam Mkd. SB19 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 43 Mu/bd2 1.471 pt 0.365 Ast 1248 4-Y20+3-Y20 (ST) BOT
supp +ve BM ™ 65 Mu/bd2 2.223 pt 0.578 Ast 1977 4-Y20+4-Y20 (X) TOP
SF (t) 15 Tv 0.44 beta 5.02 Tc 0.519
** +ve & -ve BM supp and span respectively Vus/d = -0.320 provide Y8-2L-150
Beam Mkd. SB20 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 50 Mu/bd2 1.710 pt 0.430 Ast 1472 4-Y20+3-Y20 (ST) BOT
supp +ve BM ™ 70 Mu/bd2 2.394 pt 0.630 Ast 2154 4-Y20+4-Y20 (X) TOP
SF (t) 20 Tv 0.58 beta 4.61 Tc 0.537
** +ve & -ve BM supp and span respectively Vus/d = 0.193 provide Y8-2L-150
Beam Mkd. SB21 size (mm) 400 x 900 deff. = 855 min Ast 718
span - ve BM ™ 46 Mu/bd2 1.573 pt 0.393 Ast 1343 5-Y20 (ST) BOT
supp +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 3-Y20 TOP
SF (t) 10 Tv 0.29 beta 7.39 Tc 0.442
** +ve & -ve BM supp and span respectively Vus/d = -0.600 provide Y8-2L-150