d= 250-75
d=175mm 198.837 kN
qeff = 134-.25(23.5)-14.74(1.75)
L2=1.97724798
L=1.50 m
Beam Shear :
Vu= 88.372(0.4)(1.50)
Vu = 53.0232 kN
Vu = 1/6 θ √21 bd
53023=.75/6 √21(1730)d
Punching Shear :
350+d=350+175 ; d=525mm
Vu = ((1.50)2-(.525)2)(88.372)
Vu = 17447.9 kN
θ√𝑓𝑐′ 𝑏𝑑
𝑉𝑢 =
3
b= 4(525)
b=2100mm
0.75√21(2100)𝑑
17447.9 =
3
d= 7.25 <175mm OK!
Mu=108.641 kNm
1.4
𝑃𝑚𝑖𝑛 = = 0.0033735
𝑓𝑦
t=61.71+75+1.50(20)
t=157.21mm
As Required:
As=pbd
As=0.0033735(1500)(157.21)
As=800.58 mm2
Using 20mm∅
π
(20)2N=800.58
4
N= 3 pcs.
S= ~ 400mm