Bagi Hasil

Tahun Laba Kotor (Rp) Untuk pemilik (80%) (Rp)


1 840,875,000 672,700,000
2 840,875,000 672,700,000
3 748,650,000 598,920,000
Untuk Tuan Tanah (20%) (Rp)
168,175,000
168,175,000
149,730,000
TABEL RUGI - LABA

TAHUN
1 (Rp) 2 (Rp) 3 (10 BULAN) (Rp)
KEUNTUNGAN KOTOR 672,700,000 672,700,000 598,920,000
DEPRESIASI 491,733,333 491,733,333 491,733,333
PENGELUARAN
BIAYA OPERASI
solar 248,000,000 248,000,000 220,800,000 Rp 513,400,000
bensin 12,400,000 12,400,000 11,040,000
uang makan 31,000,000 31,000,000 27,600,000
transportasi 15,500,000 15,500,000 13,800,000
perawatan alat 90,000,000 90,000,000 75,000,000
kuku bucket 2,500,000 2,500,000 2,500,000 Rp 1,411,300,000
oli 4,000,000 4,000,000 3,000,000
GAJI KARYAWAN 110,000,000 110,000,000 93,000,000
PEMBELIAN ALAT
EXCAVATOR
uang muka 500,000,000 Rp 897,900,000
kredit alat 394,900,000 430,800,000 359,000,000
ALKON 3,000,000
TOTAL PENGELUARAN 1,411,300,000 944,200,000 805,740,000 650,713,333

KEUNTUNGAN BERSIH - 246,866,667 220,233,333 284,913,333


CATATAN :

-246866666.7
220233333.33
284913333.33
PERHITUNGAN NPV

TAHUN NET CASH FLOW (Rp) FAKTOR PV PV (Rp)


1 246,866,667 0.9 222,180,000 i=10%=0,1 fpv 0.9
2 220,233,333 0.82 180,591,333 0.827198
3 284,913,333 0.75 213,685,000 0.75234
NPV 616,456,333

fpv= 1/(1+i^n) Rp2,226,200,000

RUMUS UMUM NPV > 0 = Baik


NPV = (NCFn/1+i^n+...)-modal proyek NPV < 0 = Buruk
NPV = Rp 616.456.333 - Rp 2.226.200.000 NPV = 0 = Tidak menarik
NPV = (Rp 1.609.743.667)

Rp1,609,743,667
- 1,609,743,667

284913333.3333
Tahun Uang (Rp) Faktor FV NFV (Rp)
1 246,866,667 1.1 271,553,333 220,233,333
2 491,786,667 1.1 540,965,333 284913333.3333
3 825,878,667 1.1 908,466,533

NFV = Rp 908.466.533 - Rp 2.226.200.000


NFV = (Rp 1.317.733.467)
PERHITUNGAN PUY BACK PEROID

Uang Masuk
Tahun Uang Keluar (Rp) Net Profit (Rp) Depresiasi (Rp) NCF (Rp) COMMULATIVE NCF (Rp)
0 2,226,200,000 - 2,226,200,000
1 1,411,300,000 672,700,000 491,733,333 - 246,866,667 - 2,473,066,667
2 944,200,000 672,700,000 491,733,333 220,233,333 - 2,252,833,333
3 944,200,000 672,700,000 491,733,333 220,233,333 - 2,032,600,000
4 944,200,000 672,700,000 491,733,333 220,233,333 - 1,812,366,667
5 944,200,000 672,700,000 491,733,333 220,233,333 - 1,592,133,333
6 944,200,000 672,700,000 491,733,333 220,233,333 - 1,371,900,000
7 944,200,000 672,700,000 491,733,333 220,233,333 - 1,151,666,667
8 944,200,000 672,700,000 491,733,333 220,233,333 - 931,433,333
9 944,200,000 672,700,000 491,733,333 220,233,333 - 711,200,000
10 944,200,000 672,700,000 491,733,333 220,233,333 - 490,966,667
11 944,200,000 672,700,000 491,733,333 220,233,333 - 270,733,333
12 944,200,000 672,700,000 491,733,333 220,233,333 - 50,500,000
13 944,200,000 672,700,000 491,733,333 220,233,333 169,733,333

PBP = kapan kembali modal


dilakukan sampai mendapat hasil positif
NCF= cash in - cash out
CNCF= NCF-tahun (hingga dapat positif)