Bill of Materials: 2 Beam Required As Drawn Marked-B1
Bill of Materials: 2 Beam Required As Drawn Marked-B1
F1 F1 F1 F1
M32
F1 F1 F1
3557 972 1065 863
6457
35 6312 60 50
B F1 C F1
A F1
69
F1 F1 F1
3 - 26 ø HOLES F1 A
B C 6 - 22 ø HOLES
FOR INFORMATION
APPROVED
21
RETURN DATE
100 90
100 90
F1
100 89
100 90
47 65
65
65
6 - 22 ø HOLES
40
PROJECT ORGINATOR
241
RECEIVED DATE
155
155
60
155
155
60
NEILSMITH BUILDSYS
100
100
241
100
100
141
F1 F1
40
65
65
65 6 - 22 ø HOLES F1 F1
46 8
M32 3SIDE TYP HKG ISSUED FOR FABRICATION PS RK NS 0 22.02.2019
21
21
8 B-B C-C
94 100 100 77 21 329 21 REV:
DATE: REVISION DESCRIPTION BY: CHKD: APPD:
A-A NO:
CLIENT
KRISHNA BUNK
DESIGNER
PRIME STEEL ENGINEERING
NO 978, SECTOR-4, KOPARKHAIRNE,
Navi Mumbai - 400709
WEB: WWW.PSENGG.CO.IN
CONTRACT
AGENCY
Shayona Drilling Engineers
MUMBAI - MAHARASTRA
A1
QTY= 2 IPE400
SHEET NO. 01 OF 01
- 0
841 mm x 594 mm B1