Professional Documents
Culture Documents
NLCPR Projects PDF
NLCPR Projects PDF
DAM UNDER GSWSS FUNDED UNDER NLCPR
Public Health Engineering Department,
8/22/2017
Meghalaya
TURA PHASE‐III
TURA PHASE III WSS(NLCPR)
WSS(NLCPR)
• The
The scheme will cater to the needs of newly
scheme will cater to the needs of newly
grown up localities of Tura town.
• Estimated Cost Rs. 2160.24 Lakhs.
Estimated Cost Rs. 2160.24 Lakhs.
• Expenditure up to 31.3.07 = Rs. 1889.81 Lakhs
against release of Rs.1978.58 Lakhs.
against release of Rs.1978.58 Lakhs.
• Physical Progress 77%.
• Likely Date of Completion:‐
Likely Date of Completion:‐ 31.3.08.
31 3 08
Public Health Engineering Department,
8/22/2017
Meghalaya
COMPLETED RCC WEIR
UNDER TURA PHASE-III
WSS
Public Health Engineering Department,
8/22/2017
Meghalaya
Public Health Engineering Department,
8/22/2017
Meghalaya
Public Health Engineering Department,
8/22/2017
Meghalaya
Public Health Engineering Department,
8/22/2017
Meghalaya
Nongpoh WSS(NLCPR)
Nongpoh WSS(NLCPR)
• This
This will cater to the needs of Nongpoh
will cater to the needs of Nongpoh town
town
& adjoining villages.
• ESTIMATED COST
ESTIMATED COST = Rs. 1746.72 Lakhs.
Rs. 1746.72 Lakhs.
• Sanction Accorded in 2006‐07.
Public Health Engineering Department,
8/22/2017
Meghalaya
Nongpoh Urban WSS
Urban WSS
Nongpoh Urban WSS
Urban WSS
Nongpoh Urban WSS
Urban WSS
MAIRANG WSS(NLCPR)
MAIRANG WSS(NLCPR)
• This will cater to the needs of Mairang
s ca e o e eeds o a a g town & adjoining
o adjo g
villages.
• ESTIMATED COST = Rs. 806.61 Lakhs.
• Sanction Accorded in 2005‐06.
Public Health Engineering Department,
8/22/2017
Meghalaya
Public Health Engineering Department,
8/22/2017
Meghalaya
Mairang WSS
Mairang WSS
Mairang WSS
Name of Scheme Greater Selsella WSS
Programme NLCPR
NO.
NO
PHE/335/2008/84
Sanctioned NO and date dated 28‐03‐2013
Sanctioned amount 1204 lakhs
Funding Pattern 90:10 (Central:State)
Type of Scheme
Type of Scheme Gravity
Rate of supply 40 LPCD
8/22/2017
Name of Scheme Greater Selsella WSS
Name of Source River Galwang
Type of Intake RCC weir
Simplified Treatment
Si lifi d T t t
Type of treatment plant plant
Treatment Plant Capacity 1.02 MLD
8/22/2017
Greater Selsella
G t S l ll
Name of Scheme WSS
Total Villages /hamlets/ institutions
to be covered
to be covered 86
Total population tobe covered (
P
Prospective)
ti ) 22185
Total water Demand 11.81 liers/sec
Type of pipes for Feeder and GI pipes
distribution system
distribution system
8/22/2017
Greater Selsella
G t S l ll
Name of Scheme WSS
Original date of completion 3/31/2015
Mild steel pipe, 200
mm diameter, 5500
di 5500
Type , Length and size of pipe for Rm
Gravity main
8/22/2017
Intake & Treatment Plant of Selsella
WSS
8/22/2017
ZONAL RESERVOIR NO. I WITH 1,20,000 LITRES CAPACITY AT
MAKBILKOLGRE UNDER GREATER SELSELLA W.S.S .
8/22/2017
LAYING OF FEEDER MAIN PIPELINE OF GREATER SELSELLA
8/22/2017
Laying of Distribution Pipe Line
Laying of Distribution Pipe Line
8/22/2017
Greater Sohryngkham Water Supply Scheme‐Meghalaya‐East
Khasi Hills
Hills‐Mawryngkneng
Mawryngkneng Block
Block‐Funded
Funded under NLCPR
under NLCPR
8/22/2017
Greater Sohryngkham WSS
Greater Sohryngkham WSS‐contd..
contd..
• Components of the scheme :
• ( ) Construction of RCC Weir Including Footpath
(a) C t ti f RCC W i I l di F t th
• (b) Laying of Gravity Main – 250mm dia DI Pipe
• (c) Construction of RCC 0.76 MLD Treatment Plant
• (d) Construction of Clear Water Reservoir of 2 x 3,83,800 liters capacity and Sub‐
MainReservoir of 1,44,000 liters capacity
of 1 44 000 liters capacity
• (e) Laying of Distribution Main – 80mm, 65mm, 50mm & 40mm dia GI Pipe
• (f) Construction of RCC Zonal Reservoir – 8 (eight) nos. of 2,33,400 liters each
• (g) Laying of Distribution System – 65mm, 50mm, 40mm, 25mm, 20mm, & 15mm dia
GI Pipe
p
• (h) Construction of Protection Wall with fencing, painting for Treatment Plant and
• Clear Water Reservoir
• (i) Construction of Staff Quarter
• All the components completed.
p p
8/22/2017
4. Treatment Plant of Greater Sohryngkham W/S/S
5. Intake Chamber of Treatment Plant & Fencing of Greater Sohryngkham W/S/S
6. 2 Nos. of Clear Water & Overhead Sub‐Main Reservoirs of Greater Sohryngkham W/S/S
Platforms‐ Greater Sohryngkham
Platforms Greater Sohryngkham WSS
8/22/2017
Name of Project : Upper Shillong Water Supply Project
District
District : East Khasi Hills
: East Khasi Hills
Project Source of Fund : NLCPR
Funding Agency : MoDONER
Date of approval of Project/Scheme (GOI) : 23.12.2010
Date of Administrative Approval by State Govt : 23.03.2011
Funding Pattern : Central Share : State Share
` 2972.12 Lakhs : ` 330.24 Lakhs
Fund Released : Central Share : State Share
` 2377.68 Lakh : ` 237.77 Lakh
Physical & Financial Progress: Financial : Physical
Physical & Financial Progress: Financial : Physical
` 2615.45 Lakh : 70 %
Progress of main component of works viz. Water Treatment
Plant, Clear Water Reservoir, Pump House, Laying of Gravity Main
upto 11th Mile are well in progress.
After permission sought from PWD for Laying of Pipe Lines
was accorded on 3rd February 2017, Pipe Lines works are now in
progress, viz:
i
Mylliem Marbaniang about 150Rm is completed.
Mylliem mawnianglah about 200Rm is completed.
completed
6th Mile trenching of works are in progress.
Earthwork Excavation & Construction of Main Reservoir at
6½ Mile is completed.
Construction of Supporting Pillars for Laying of Gravity Main of 400mm dia are in
progress
Construction of Supporting Pillars for Laying of Gravity Main of 400mm dia are in
progress.
Upper Shillong Wss : Earthwork in excavation for Construction of Main Reservoir at
Upper Shillong Wss : Earthwork in excavation for Construction of Main Reservoir at
6th Mile is in progress.
Upper Shillong Wss : Laying and fitting of gravity main of 400mm dia. from
Marbaniang to 7th Mile are in progress
Greater Umsning WSS‐Meghalaya‐Ri Bhoi District‐Umsning Block under NLCPR
Sub Zonal Reservoir at point ‘N’ of Greater
Water Treatment Plant
Umsning Water Supply Scheme (Recently
Water Supply Scheme (Recently
completed in December‐January 2017)
8/22/2017
Greater Umsning WSS
Greater Umsning WSS‐Photographs
Photographs
Chemical Tank
Laying of Gravity Main Line
8/22/2017
Renovation of Jowai WSS
Renovation of Jowai WSS‐under
under NLCPR
NLCPR
8/22/2017
Renovation of Jowai WSS
Renovation of Jowai WSS‐under
under NLCPR
NLCPR
8/22/2017
Renovation of Jowai WSS
Raw Water Gravity Main crossing Myntdu
Raw Water Gravity Main crossing Myntdu river near Jowai
river near Jowai
2nd Stage Pump House
8/22/2017
GREATER RALIANG WSS‐Meghalaya‐
Janitia Hills‐Khliehriat
ll hl h under NLCPR
d
8/22/2017
Raliang WSS‐ Construction of
Treatment Plant ‐under NLCPR
l d
8/22/2017
Raliang WSS under NLCPR
WSS under NLCPR
Zonal Reservoir at Laskein Zonal Reservoir at Mukhap
Zonal Reservoir at Mukhap
8/22/2017
Ialong WSS under NLCPR
WSS under NLCPR
8/22/2017
Ialong WSS under NRDWP
WSS under NRDWP
• Check Dam
Check Dam • Zonal Reservoir
Zonal Reservoir
8/22/2017
Ialong WSS
8/22/2017
Umroi WSS
WSS‐Intake
Intake
Zonal Reservoir‐Umroi
Zonal Reservoir Umroi WSS
Sub Zonal Reservoir‐Umroi
Sub Zonal Reservoir Umroi WSS
Stand Post‐Umroi
Stand Post Umroi WSS
Mawsynram WSS
WSS‐Intake
Intake
Laying of Pipe Line‐Mawsynram
Laying of Pipe Line Mawsynram WSS
Treatment Plant No‐2‐Mawsynram
WSS
RCC SUMP‐Mawsynram
RCC SUMP Mawsynram WSS
PUMP HOUSE‐Mawsynram
PUMP HOUSE Mawsynram WSS
Delivery Point‐Mawsynram
Delivery Point Mawsynram WSS