RFI#: NPP0036-ACM-RFI-0001
Date Submitted: 7-Oct-2013
Project Information:
Name: Ship-to-Shore and Container Terminal Yard Cranes
Number: NPP/0036
Phone: +974-4406-4433
Fax: +974-4406-4455
AECOM ZPMC
The Pearl Building, 6th Floor - P.O. Box 6650 Dong Fang Road
Doha, Shanghai 200125
Qatar People Republic of China
ZPMC is to provide the following information for PMC’s management of verification by the EDC:
EDC: Please indicate the build-up of the total connected load stated under item 1.
i.e. indicate the calculation of the total connected load.
1.3 Details and ratings of the on-board step down transformer (incoming voltage is 22kV)
ZPMC: please explain what is on-board step down transformer.
EDC: Please indicate the ratings of the transformers installed on the crane.
The ratings should include kVA, voltage, impedance, vector group, full load current.
Please also include the single line diagram for the power distribution on the crane.
Page 1 of 4
AECOM Middle East
PO Box 6650, Doha, Qatar
T +974 4406-4433 F +974 4406-4455 Email: DohaPort@aecom.com
1.4 The average power of the crane per cycle, when lifting 2No 40’ containers (fully laden) in tandem
lift and 1No 40’ container (fully laden)
ZPMC: Under 2No 40’ containers (fully laden) condition:
Duty cycle: 709.4kwx2; Single cycle:714.6kwx2
1No 40’ container (fully laden) single hoist condition:
Duty cycle: 397.1kwx2; Single cycle:392.9kwx2
1.5 Peak load of the crane when hoisting 2No fully laden 40’ containers
ZPMC: 1280kwx2
1.6 Peak load of the crane when hoisting 2No empty 40’ containers
ZPMC: 1189kwx2
1.7 The average power of the crane per cycle, when lifting 1No 40’ containers (fully laden) in tandem
lift and 1No 40’ container (fully laden)
ZPMC: Under lifting 1No 40’ containers (fully laden) in tandem lift condition:
Duty cycle: 940.2kw; Single cycle:936.3kw
1No 40’ container (fully laden) single hoist condition:
Duty cycle: 397.1kwx2; Single cycle:392.9kwx2
1.8 Peak load of the crane when hoisting 1No fully laden 40’ containers
ZPMC: Peak load:1451kw
1.9 Peak load of the crane when hoisting 1No empty 40’ containers
ZPMC: Peak load:1189kw
2 The breakdown of the STS crane electrical power requirements, motor ratings and auxiliaries
Page 2 of 4
AECOM Middle East
PO Box 6650, Doha, Qatar
T +974 4406-4433 F +974 4406-4455 Email: DohaPort@aecom.com
2.5 Boom Raise/Lower System (Although not operating when the crane is loading/unloading
containers the boom raise and lower system)
2.5.1 Motor rating and thermal capacity, type etc
ZPMC: 1LL8317-4PC90-Z, 1780rpm 460kW 500V 635A 60Hz
2.5.2 Number of motors
ZPMC: 1 motor.
2.5.3 Motor efficiency, power factor
ZPMC: 96.2%, 0.88.
2.5.4 Inverter efficiency
ZPMC: 98.1%.
2.5.5 Converter efficiency
ZPMC: 98.4%.
2.5.6 Power factor of Converter
ZPMC: N/A.
2.5.7 Motor overload ratio
ZPMC: 165%
Please clarify the actual power requirement and connection arrangements for the auxiliary power
for the STS crane when not operating and being supplied from an auxiliary electrical supply.
2.6.1 Auxiliary power supply capacity requirements
ZPMC: 137.16kVA.
2.6.2 Auxiliary power supply connection rating: - power kW, power factor, current and and
Page 3 of 4
AECOM Middle East
PO Box 6650, Doha, Qatar
T +974 4406-4433 F +974 4406-4455 Email: DohaPort@aecom.com
voltage.
ZPMC: 115.72kW,0.9,190.82A,415VAC
2.6.3 Any other power system/installation elements.
ZPMC: N/A.
Suggestion: -
About the above issues, Please find the above ZPMC’s reply in blue letter.