Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 112

COMPANY PROFILE

Verger Delporte UAE SWITCHGEAR MANUFACTURING DIVISION


Energy
Industry
Residential
Infrastructure
Ref. 6302K
CONTENTS
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.016 0
17.0
18.0
19.0
20.020 0
21.0
22.0
23.0
24.0
About Switchgear Manufacturing
Organization Chart
Quality Plan
Products
Sales and Marketing
Contact Us
Design
Materials
Manufacturing / Assembling
Factory Inspection and Testing
QHSE Inspection / After Sales
Installation, Testing and Commissioning
Technical Assistance
Warranty and Spare Parts Capability
Standards
Franchised PFhi d Panel B ild C tifi tl Builder Certificate
QHSE Certificate
Type Test Certificate
Final Factory Inspection Certificate
Installation,Installation Testing and Commissioning Certificate
Areas of Concern
Major Projects Executed
Some Major References
jMajor Clients
2 of 51

Ref. 6302K
1.0
ABOUT SWITCHGEAR MANUFACTURING DIVISION
Verger Delporte UAE Ltd has been operating in UAE since 1977 and have developed
extensive experience in the field of Low Voltage Switchgear. Our facility is located in
sharjah where we manufacture wide range of Low Voltage Switchgear products under
franchising agreement with Schneider Electric. The products are listed in the PRODUCTSggp
section of the website.
We adhere to the highest standards of corporate governance by establishing processes
and practices that promote and ensure integrity, compliance and accountability.
Verger Delporte UAE Ltd is committed to environment, health and safety excellence. We
believe in good corporate environmental citizenship in the communities in which we
operate and in providing a healthy and safe work place. We committed to complying with
all environmental, health and safety laws and regulations.
We supplied low voltage switchgear all over UAE for several projects for applications as
diverse as Power Stations, Oil and Gas, Utilities, School, Hospitals, Private Industries,
Airports, Shopping Centres and Commercial Buildings.
We have a state-of-the-art low voltage switchgear manufacturing facility in SHARJAH
spread over 20,000 square feet. The facility is equipped with sophisticated machines for
computer aided design and manufacturing, assembling and testing.
Our high-tech design office is fully capable of meeting client’s requirement while strictly
adhere to BS, IEC standards and Local Regulations. We are constantly updating and
improving our products through advances both in terms of quality and design, in line with
latest product standards and with the technical support from our franchiser We extend ourfranchiser.
after sales service to the customer through well trained service team.
3 of 51

Ref. 6302K
1.0
ABOUT SWITCHGEAR MANUFACTURING DIVISION
Verger Delporte U.A.E. Ltd an ISO 9001, ISO 14001 and OHSAS 18001 certified company
and a franchised panel builder of Schneider Electric, in the services of Low Voltage Switch
Gear panel building, testing & commissioning and after sales activities over three decades
has committed to make every possible endeavor to follow up the development witnessedyppp
by the Industry and to contribute effectively in supporting this progress.
We always exert efforts to adhere to the latest technology with the aim of enhancing our
competitive ability and meeting the goals set by ourselves in terms of quality, functionality
and safety.
We fully understand and exceed our customers’ needs, wants and preferences and
provide greater value to our customers than our competition.
Our team work and culture build on the company’s reputation and image internally and
externally while driving initiatives to ensure Verger Delporte remains as employer of
choice.
We implement best-in-class operating practices and leverage company wide
opportunities and best practices.
With the experience, standard reached by us and our efficient team, we offer outstanding
services of high quality. We have strategies concentrating on all issues and difficulties and
establish in a manner that contribute in enhancing and supporting permanent cooperation
with our Customers satisfying their increasing needs.
4 of 51

Ref. 6302K
2.0
ORGANIZATION CHART
M.RAMAKRISHNA
MANAGER
SWITCHGEAR MANUFACTURING
DIVISION
K. KRISHNARAJ
ASSISTANT MANAGER
ABU DHABI & AL AIN
ARZA MADHUMURTHY
ASSISTANT MANAGER
DUBAI & NORTHERN EMIRATES
SALES
ABU DHABI &
AL AIN
PRODUCTION
SALES
DUBAI &
N.EMIRATES
AFTER SALES
DESIGN
TESTING AND
COMMISSIONING
MATERIALS
QUALITY
5 of 51

Ref. 6302K
2.0
ORGANIZATION CHART
Verger delporte had established its own name in the field of low voltage switchgear as a
reliable manufacturer and has been build up customer confidence for services and after
sales support.
Assembling low voltage switchgear of all kinds under the franchise of Schneider ElectricElectric,
the division profits by the integrated process of panel building, stretching from the Design
(Electrical Calculation and Configuration Lay out) up to the Manufacture, Delivery and
After-Sales Service of finished products.
With a concern to stick closer to client's demand, the company have its branches in Dubai
& Northern Emirates and Abu-Dhabi (Asst. manager outpost) apart from its Sharjah head
office.
This division’s activities are shared out among 7 Sections, which are the Marketing /
Sales, Design, Materials, Production, Quality Control, Testing & Commissioning and After-
Sales Service.
6 of 51

Ref. 6302K
3.0
QUALITY PLAN
Internal organization in business key-processes to meet Project’s Quality requirements.
1.
Offer / Contract review:
Prior to the acknowledgment of order, under the responsibility of SGDg,py
Manager / Asst. Manager
To check that VD offers meet client’s contractual requirements in all respects
To make sure the agreed technical solution / scope of works remain within our
capacity.
2.
Project programming:
Under the direction of SGD Manager / Asst. Manager, to plan adequately the tasks
and their related human and material/equipment resources as to meet project /
contract requirements.
Design, Material selection, with optimal time margin for customers’ approval.
Material procurement and execution.
Final inspection, testing and commissioning.
3.
Design and Materials:
Under the responsibility of Design Engineer and in control of SGD Manager/Asst.
Manager.
To carry out the electrical design in terms of power / control diagrams followed by
general arrangements (taking heed of the environmental constraints as well as
electromechanical interfaces with the use and power generation) on software,
home-developed for our specific activities.
The thoroughly reviewed and approved “design output” depends on initial control
of the “design input” (Specifications, technical guides from franchiser,
International & local standards, tailor- made software).
7 of 51

Ref. 6302K
3.0
QUALITY PLAN
4.
Material Control: (Refer to GP6 – Purchasing and Material Control Procedure)
a). Selection – Under the responsibility of competent personnel:
To pick up from clients suggestions or / and VD list of approved suppliers
(Quality, Health, Safety and Environmental performance rated by senior responsible
and QHSE Manager) the right materials, complying with the specifications and
applicable quality standards.
b). Purchasing:
To place the corresponding comprehensive order, thoroughly reviewed and
approved by SGD Manager.
c). Incoming Goods Inspection:
Under the responsibility of Logistics Manager / Store Keeper to check material
compliance with the specified requirements, from optimally defined scrutiny.
Remarks: The major materials are 100% controlled by the franchiser or / and
approved supplier, with available certificates of conformity to IEC or BS standards.
5.
Production: (Refer to HSIM 6301 & WI 3200 – 3209)
Under the responsibility of Production Supervisor:
From the Production file, to manufacture the panels in accordance with customer
requirements (drawings) Switchgear Assembly and Installation Guide (from our(drawings),
franchiser), while auto-controlling the operations on the corresponding format.
6.
Inspection & Testing:
Carried out by Quality Inspector or / and Assistant:
Before client’s factory acceptance test of completed panels, Quality Inspector, duly
authorized by SGD Manager, performs the corresponding Quality Control of the
panels, logging his results, recording his eventual comments and approval for the
panels delivery on the corresponding formats.
8 of 51

Ref. 6302K
3.0
QUALITY PLAN
7.
Maintenance, Servicing & After Sales:
Under the responsibility of SGD Manager / Asst. Manager
To carry out the required site intervention, after technical expertise of Quality
Inspector or /and Assistant.
To provide spare parts and components for one-year period, with ten years
guaranteed availability of stock by our franchiser (Whenever available).
8.
Project’s Documents control: (Refer to GP1 –
Control)
Under the shared responsibility of different sections head:
General
Documents
To record, file, update, withdraw, and supersede the job-related documents,
when necessary, as per their relevance and importance with regard to quality
requirements.
To make information easy to retrieve, using electronic (diskettes, hard-disks) or
Paper support, where applicable.
Related Process: MP3 – Switchgear Division Management Process
With its Integrated Management System Documentation (IMSD), the company benefits
also from well-thought management processes and functional procedures, making our
organization, if not flawless, at least quick-responding to any challenging quality issues.
The personnel, whose competence and skills are under permanent watch (GP5 – Training
Procedure), can cope confidently with potential or actual anomalies (GP2 – Non-
conformity Procedure), or general issue handling, with (GP3 – Corrective and Preventive
actions Procedure).
Furthermore the whole practices related to business key-processes, which affect the
delivered quality are regularly audited to ensure that optimally defined proceeding quality, proceeding,
conform to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 requirements (GP4
– Internal QHSE Audit Procedure).
Customer oriented QHSE policy, the driving force behind the major decisions and actions
of senior management has led the company to monitor its quality performance against
tough targets of business excellence (GP8 – Indexes and Indicators Procedure)Procedure).
9 of 51

Ref. 6302K
4.0
PRODUCTS
The division proposes a wide selection of low
voltage switchgear, either derived from our
principals standard list or from other reputed
manufacturers, then locally customized under
strict control and acceptance of Schneider
Electric’s Quality Department or house
developed in accordance with the applicable
electrical standards and regulations.
Main Distribution Boards
Motor control Centres
(Fixed / Drawout)
Intelligent Motor control Centres
(Fixed / Drawout)
Sub-Main Distribution Boards
Final Distribution Boards
Automatic Power Factor Correction
Capacitor Panels
Source Changeover System
Fixed Construction
Drawout Construction
(Manual / Automatic)
Generator Control,
Load Management and
Synchronizing Panels
Energy Meter Cabinets
Feeder Pillars
Lighting Control Panels
Starter Panels
6000A Switchboard
10 of 51

Ref. 6302K
5.0
SALES & MARKETING
This department is strategically built-up to cover the complete UAE market.
Abu Dhabi based post to cover Abu Dhabi and Al Ain
Sharjah based post to cover Dubai and Northern Emirates
A team of people with good educational background and sound experience makes up the
mandatory condition to furnish proficiently these duties with customer satisfaction as
motive. The customers / clients are efficiently guided to communicate his practical
expectations. confidence in our products is built-up from the initial stages of discussions,
and the sales engineers are associated with the customers right from the sourcing of
enquiry to after sales serviceservice.
The techno-commercial offer is prepared as per the explicit requirement of client /
consultant while meeting the local regulations. Customized solutions from our range of
products will be provided to the customer within the guidelines of the principals.
A team of qualified and well experienced people render their services in estimation by
handling Qualitative and Quantitative major tendering works well with in the given target
dates.
11 of 51

Ref. 6302K
6.0
CONTACT US
Head Office - Sharjah
M. RAMAKRISHNA
P.O. BOX 5629 Sharjah,
United Arab Emirates
Tel : +971 6 543 2436
Fax : +971 6 543 4139
Mobile: +971 50 631 40 57
E-mail : ramakrishna@verger-delporte.ae
Web. : www.verger-delporte.ae
Abu Dhabi and Al Ain
K. KRISHNARAJ
P.O. BOX 47010, Abu Dhabi,
United Arab Emirates
Tel : +971 2 672 73 17
Fax : +971 2 672 96 99
Mobile: +971 50 797 15 56
E-mail : krishnaraj@verger-delporte.ae
Web. : www.verger-delporte.ae
Dubai and Northern Emirates
ARZA MADHUMURTHY
P.O.P O BOX 5629 SharjahSharjah,
United Arab Emirates
Tel : +971 6 5432 436
Fax : +971 6 5434 139
Mobile: +971 50 4620 874
E-mail : madhu@verger-delporte.ae
Web. : www.verger-delporte.ae
With more than 250 dedicated employees at your service …
12 of 51

Ref. 6302K
7.0
DESIGN
The in-house design office structured with an engineering team of Design Engineers and
assisted by designers is capable to design the client’s requirements strictly according to
local regulations, I.E.C and other International / National Standards. It is equipped with all
records of technical documents provided by our principals and by other suppliers,
catalogues, manuals, product qualification & conformity certificates and complete latest
international standards for ready reference. Verger delporte office expertise in offering
solutions to clients in the electrical power distribution, programmable logic controls and
energy management system.
Total design system is accommodated with local computer network system and also linked
with external offices to extend highest service. Engineering drawings are prepared with
the latest AUTO CAD and EPLAN software. They are standardized with self developed
libraries according to the local regulations, system requirements and principals regulations.
13 of 51

Ref. 6302K
7.0
DESIGN
The marketing / sales, design office, materials control and production sections are all
equipped with the state of the art available technology and networked at all levels to
facilitate communication which helps us in effective time management.
A team of well experienced engineers assist the division in the use of customized
programs developed by verger Delporte based on our principal M/s Schneider electric
technical guides & Technical know how, International standards, National standards and
local regulations, besides standard office automation and latest operating systems.
Our programs act as a useful tool and helps us optimize the technical solution offered to
customers. From environmental and electrical constraints they help to bring-out the very
best definition of the panels in record time. They include (non limitative features)
calculation and design of power and control circuits, selection of components outlay of
external and internal configuration.
Materials and production planning are also done through the computerized network which
resulted in a better material management and inventory of the stocks available.
This total computerization of our process has given us the added bonus of increased
efficiency and output.
14 of 51

Ref. 6302K
8.0
MATERIALS
We stock more than 8000 different items worth of 20 Million UAE Dirhams. The material
section comprises of a well competent Material Co-ordinator and his assistants. The
entire material section is fully computerized, and connected to the common network so
that the management monitoring of the material procurement, allocation, safety stock and
order processes is easily carried out from computer work station.
The materials are selected based on our standard Design Manual, our principal
recommendation and also Client requirements and by adopting the International, National
standards and Local regulations. The Bill of Material is prepared based on the job
requirement, subsequently the purchase order also prepared and under the approval of
Division manager.
In order to ensure quality of materials received we have a special team for checking the
incoming goods. As per the standard procedure, the Non-Conformance is raised to the
supplier if any materials are found as faulty. The major materials are 100% approved by
the franchisee or are from an approved supplier with available certificates of conformity to
International, National standards and Local regulations.
15 of 51

Ref. 6302K
9.0
MANUFACTURING / ASSEMBLING
The Production premises is made up of two shop floor areas of 2000 sq. meters (each of
1000 sq. meter area). Besides a storage capacity of 900 sq. meter area with 8000
different items worth of 20 million UAE Dirhams.
The production team comprises of production incharge a supervisor and a group of team
leaders under whom a batch of trained and well experienced technicians put their
combined efforts to bring out the best in quality products of various L.V. switchgear panels
and control panels etc.. In all above three levels their work-in-progress is documented
through auto-control sheets.
The factory is well equipped with manual bending machines, hydraulic bending machines
for bus bar shaping, punching machines for drilling, shearing and bending machines, free
standing drilling machines for fabrication, besides miscellaneous equipments such as
drilling machines, saw cutters, heat gun for basic operations. this machinery and
equipments are carefully checked on monthly basis so as to ensure a consistency in the
performed operations (corrective and preventive actions are recorded).
Critical assembly tasks are subject to a thorough checking of the hand-equipment.
Crimping, cutting, stripping tools as well as torque wrenches are internally verified with
logged results for traceability purposes and certification is done by certified laboratories in
addition to internal calibration.
As a part of the weekly schedule, production, material, co-ordination and design people
meets to discuss the progress of jobs and planning for new ones.
Our workshop is equipped with latest tools & machines, upgraded time to time inline with
growing technology.
16 of 51

Ref. 6302K
10.0
FACTORY INSPECTION AND TESTING
At the end of the manufacturing process, an LV Switch Gear assembly must undergo
various individual inspections and tests at the factory, following an established programme.
The switchboard must comply with:
The appropriate Standards
The design files (Drawings, diagrams and specific requirements).
Manufacturer’s Installation guide
In–house standards
Local regulations
Tests must be carried out in a clearly defined area and in compliance with applicable
regulations, by qualified personnel. Testing area must be cordoned-off using warning chain
or rope and warning sign.
Inspectors must be qualified personnel, must have attended and passed a special training
course. They must be qualified for working in the proximity of live parts.
The necessary tools should be correctly and periodically calibrated and maintained in good
working condition. Some of the necessary tools are:
Control console (equipped with different control voltage source facilities)
High voltage Test Kit
Insulation Resistance Tester
Primary Current Injection Test Kit
Thermal Imager
Power Quality Analyzer
ACB / MCCB test kit (Secondary)
ELCB / ELR Test Kit
Low Resistance Test Kit.
Digital Multi meter
Torque wrench
3φ Variac
17 of 51

Ref. 6302K
10.0
FACTORY INSPECTION AND TESTING
Routine Tests intended to detect faults in materials and workmanship. Tests are carried out
on every new assembly after it has been assembled or on each transport unit. Hence
repetition of routine tests at the place of installation is not required.
Assemblies, which are assembled using standardized components outside the works of
the manufacturer and assemblies, by the exclusive use of parts and accessories specified
or supplied by the manufacturer for this purpose, shall be routine-tested by the firm which
is going to assemble
18 of 51

Ref. 6302K
11.0
QHSE INSPECTION / AFTER SALES
The duties are carried out by proficient personnel, whose skills are regularly updated
by Schneider Electric’s quality and technical experts.
It is made up of :
1)
2)
3)
4)
5)
QHSE Manager
Quality Control Responsible.
Strictly selected quality conscious technicians from production.
Audit from Schneider Electric.
Audit from external parties (BV, Consultants, Clients, etc.)
The quality inspection procedure ranges from correctness of the component ratings
up to compliance to the international, national standards & local regulations. Apart
from the above standard routine tests are carried out by quality personnel only. The
testing equipment provide for all low voltage testing needs. Functional tests are also
done.
The test equipment are calibrated by certified laboratories while being thoroughly
checked internally, on regular intervals (Results logged and filed accordingly).
19 of 51

Ref. 6302K
12.0
INSTALLATION, TESTING AND COMMISSIONING
When contractually requested, the installation, testing and commissioning team carries-
out the tasks, under the strict supervision of their Engineers / Authorized personnel.
Considering the importance of Testing and Commissioning we upgrade all testing
equipments as per latest technology, and are also calibrating them by certified laboratories
while being thoroughly checked internally on regular intervals (Results are logged for
future reference).
We also undertake optional tests viz. Low Resistance test, Primary injection test,
Secondary injection test, etc. If required contractually.
Infrared Thermography is an ideal technique for inspecting electrical equipment for
defective components or connections. We have a team of well trained and certified
engineers to conduct these tests.
20 of 51

Ref. 6302K
13.0
TECHNICAL ASSISTANCE
It consists of :
External training from Schneider electric personnel in the organization to embrace a
general or specific view, as per the needs of the latest technology / products /
operational skills.
Internal training in the form of seminars, workshops, hands-on courses on products,
software, shop floor practices, quality inspection.
Expertise and technical support for outstanding job or product issues.
On request from our clients we provide training on low voltage switchboards in both
classroom as well as on fieldfield.
Our integral training course is for 3days and it covers, Sales, Design, Production,
Quality, and Ecodial software for load flow studies.
21 of 51

Ref. 6302K
14.0
WARRANTY & SPARES PARTS CAPABILITY
Our goods are guaranteed with a warranty period of 18 months from the date of delivery
or 12 months from the date of commissioning, which ever comes earlier against any defect
in construction or operation arising from faulty design, materials or workmanship.
We stock 8000 different items with a safety level of 2 to 3 months for moving items. This
enables us to provide a speedy service to our customers.
The stock level of every item is maintained by an ERP Integrated Solution, controlled and
maintained by thoroughly trained staff.
22 of 51

Ref. 6302K
15.0
STANDARDS
The division adapts to the reliable technology of manufacturer and it’s standards to provide
the state of the art design to the requirements of the Local Authorities and End users.
All our panel conform to latest IEC and BSEN standards with ASEFA / ASTA / KEMA or
DEKRA certificationscertifications.
All panel designed and assembled at verger delporte are totally type tested as specified
below.
MDB / MCC certified for 100kA for 1sec. / 85kA for 1sec / 50kA for 3sec and
50kA for 1sec.
SMDB’s certified for 50kA / 42kA / 35kA / 25kA for 1sec.
DB’S and FDB’S certified for 25kA for 0.2sec / 17kA for 0.5sec.
Four routine tests are carried out at the premises, which evidences the company’s ability
to produce international / national standards locally.
Conformity to standards are as follows:
Factory Built Assemblies – IEC 60439-1 / IEC 61439-1/2
Resistance to Damp Heat – IEC 68-2-30
Resistance to Salt Mist – IEC 68-2-11
Internal Arc Confinement – AS 3439
Earth Quakes – CBC (California Building Code)
23 of 51

Ref. 6302K
16.0
FRANCHISED PANEL BUILDER CERTIFICATES
Verger Delporte UAE Ltd is a Franchised Panel builder of Schneider Electric since 1977.
Under this franchising agreement we design, manufacture, test and supply LV
switchboards, upto 6300A we hold the certificate for prisma TT and Blokset system.
1.
2.
3.
Certified as Franchised panel builder for Blokset system till 31St March 2013.
Certified as Franchised panel builder for Blokset system till 31St March 2012.
Certified as Franchised panel builder for Prisma TT and Blokset system till
31St March 2011.
Certified as Franchised panel builder for Prisma TT and Blokset system till
31st March 2010.
Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March 2009
4.
5.
24 of 51

Ref. 6302K
16.0
FRANCHISED PANEL BUILDER CERTIFICATES
6.
Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March 2008
Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March31 t M h 2007
Certified as Franchised panel builder for Prisma and Blokset systems till
31st March 2006
Certified as Franchised panel builder for Blokset system up to 6300A till
31st December 2004
Certified as Franchised panel builder for Prisma system up to 4000A till
31st December 2004 1
Certified as Franchised panel builder for Prisma Switchboard systems till 2002
Certified as Franchised panel builder for Prisma, Master block & TDI Motor Control
Centre systems in the year 1C15th January 1991997
Certified as Franchised panel builder for MASTER BLOCK types MB100,
MB200 and MB400 systems in the year 1993
Certified as Franchised panel builder for low voltage switch gear assembling in the
year 1991
Franchising contract was made in 1977 for low voltage switch gear assembling
7.
8.
9.
10.
11.
12.
13.
14.
15.
25 of 51

Ref. 6302K
17.0
QHSE CERTIFICATES
We always believe that Quality Excellence is inseparable from Health, Safety and
environment and it is for this reason we decided to have an Integrated Management
System (IMS – ISO 9001, ISO 140001 and OHSAS 18001). By having IMS, we are
continually proving our deepest concern not only in satisfying our customer’s needs but
also to protect the health and safety of our personnel, customers, any interested parties,
materials/equipments as well as the environment where we work and live.
With the continued dedication and commitment towards QHSE since 1995, we had been
certified in May 2012 for ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007.
1.
2.
3.
ISO 9001:2008 for Quality
ISO 14001:2004 for Environment
OHSAS 18001:2007 for Health and Safety
26 of 51

Ref. 6302K
18.0
TYPE TEST CERTIFICATES
SL.
No.
1
DESIGNATION
CAMGRO SYSTEM – 6000A
Main Distribution Board / MCC
CAMGRO SYSTEM - 4000A
Main Distribution Board / MCC
CAMGRO SYSTEM - 3200A
Main Distribution Board / MCC
CAMGRO SYSTEM - 2500A
Main Distribution Board / MCC
CAMGRO SYSTEM - 1600A
Main Distribution Board / MCC
CAMGRO SYSTEM - 1000A
Main Distribution Board / MCC
CAMGRO SYSTEM - 630A
MDB / SMDB / MCC
CAMGRO SYSTEM - 250A
MDB / SMDB / MCC
Certificate of Internal Arcing
Type: BLOKSET type 132
CAMGRO S4 SYSTEM – 800A
SUB MAIN DISTRIBUTION BOARD
C GOCAMGRO S3 SYSTEM – 630ASS630
SUB MAIN DISTRIBUTION BOARD
CAMGRO S2 SYSTEM – 400A
SUB MAIN DISTRIBUTION BOARD
CERTIFICATE No.
130a-11BT
CERTIFIED BY
ASEFA
2
129c-11BT
ASEFA
3
062-12BT
ASEFA
4
004a-11BT
ASEFA
5
003a-11BT
ASEFA
6
002a-11BT
ASEFA
7
2147939.101
DEKRA
8
2147939.100
DEKRA
9
018a-08BT
ASEFA
10
2137902-105
DEKRA
11
2137902-104
DEKRA
12
2137902-103
DEKRA
*copies available on request
27 of 51

Ref. 6302K
18.0
TYPE TEST CERTIFICATES
SL.No.
13
DESIGNATION
CAMGRO S1 SYSTEM – 250A
SUB MAIN DISTRIBUTION BOARD
CAMGRO F4 SYSTEM -250A
Final Distribution Board O/G-25kA
CAMGRO F3 SYSTEM -250A
Final Distribution Board O/G-15kA
CAMGRO F2 SYSTEM -250A250A
Final Distribution Board O/G-10kA
CAMGRO F1 SYSTEM -125A
Split Type Final Distribution Board
4000A Main Distribution Board
Type: Euroform Switchboardyp
2500A Main Distribution Board
Type: Euroform Switchboard
1600A Main Distribution Board
Type: Euroform Switchboard
1000A Main Distribution Board
Type: Euroform Switchboard
630A Main Distribution Board
Type: Euroform Switchboard
250A Main Distribution Board
Type: Euroform Switchboard
Certificate of Internal Arcing
Type: Euro form Switchboard
CERTIFICATE No.
2137902-102
CERTIFIED BY
DEKRA
14
2145021.101
DEKRA
15
2145021.100
DEKRA
16
2137902.1012137902 101
DEKRA
17
2137902.100
DEKRA
18
18101
ASTA
19
18103
ASTA
20
18105
ASTA
21
18107
ASTA
22
2148038.100
DEKRA
23
2148038.1012148038 101
DEKRA
24
17482
ASTA
*copies available on request
28 of 51
Ref. 6302K
19.0
FINAL FACTORY INSPECTION CERTIFICATES
At the end of the manufacturing process, an LV Switchgear must undergo various
individual inspections and tests as per IEC 61439-1/2
A staff of extremely experienced and competent technicians carry out these testing
activities. They are qualified for working in proximity with live parts. The necessary tools
and equipment are correctly and periodically calibrated by certifying authority.
1.
2.
Final Factory Inspection Report - 3140
Final Factory Inspection Certificate - 3141
29 of 51

Ref. 6302K
3140A
FINAL FACTORY INSPECTION REPORT
Client : …………………………………………………………………
Consultant : …………………………………………………………..
Project : ……………………………………………………………….
Panel Title : …………………………………………………………..
Inspection / Test carried out for
1 Degree of protection of enclosure (11.2)
a Make, model, type & degree of protection
b Presence of gasket as per deg. of protection
2 Clearance and creepage distances (11.3)
a Spacing of bus bars
b Clearance & creepage distance
3 Protection against electric shock (11.4)
a Protection of cables against sharp edges
b Safety on normal operation & maintenance
c Presence of bus bar shrouds & its rigidity
d Presence of door earthing
e Partitions as per form of construction
f Effective continuity of the earthing circuit
g
Bolt & screws tightening of the protective
circuit connection
Status
Date : ………………………………………
Job No. : ……………………………........
Drawing No. : ………………………........
Panel Sl.No. : ……………………..………
Inspection / Test carried out for
Status
Routine tests are carried out in accordance with IEC 61439-1/2 standards sub-clause: 11. Reference documents used are
switchboard drawings, factory inspection & testing procedure
Routine tests are carried out in accordance with IEC 61439-1/2 standards sub-clause: 11. Reference documents used are
switchboard drawings, factory inspection & testing procedure
8 *Insulation test (before Dielectric Test)(11.9)
a Between R-Y circuit
b Between Y-B circuit
c Between B-R circuit
d Between R-N circuit
e Between Y-N circuit
f Between B-N circuit
g Between R-E circuit
h Between Y-E circuit
i Between B-E circuit
j Between N-E circuit
9 Dielectric test (2.2 KV for 1 Second) (11.9)
a Between R-Y circuit
b Between Y-B circuit
c Between B-R circuit
d Between R-N circuit
e Between Y-N circuit
f Between B-N circuit
g Between R-E circuit
h Between Y-E circuit
i Between B-E circuit
j Between N-E circuit
10 *Insulation test (after Dielectric Test) (11.9)
a Between R-Y circuit
b Between Y-B circuit
c Between B-R circuit
d Between R-N circuit
e Between Y-N circuit
f Between B-N circuit
g Between R-E circuit
h Between Y-E circuit
i Between B-E circuit
j Between N-E circuit
11 Electrical operational/functional test(11.10)
a Elec. & mech. operational test for all devices
b Operational test for protection & metering
c Elec. & mech. controls & safety interlocks
d Electrical & mechanical indications
e Functional test as per drawings / procedure
4 Incorporation of built-in components (11.5)
a Conformity of the devices installed
b Conformity of accessories of the devices
c Conformity of the metering instruments
d Identification label of each devices
e Type, rating & breaking capacities
5 Internal elect. circuits & connections (11.6)
a Accessibility of devices & terminations
b Type, size and rating of cables
c Control and power cables crimping
d Type, rating & colour coding of bus bars
e Installation of cables (trunking, supports)
f Devices mounting are proper & satisfactory
6 Terminals for external conductors (11.7)
a External cable termination facilities
b Cabling and glanding spaces
c Adequate no. of metallic cable supports
d Marking/identification of external conn. terminal
7 Mechanical operations (11.8)
a Operation of withdrawable drawers
b Doors, locks & mech. locking systems
c Withdrawable drawers mech. Interlocks
d Transport section, lifting & lifting points
e Interchangeability of drawable units(safety pin)
* Minimum acceptable insulation resistance value 1000 ohms / volt
Client
..………………………….
..………………………….
Consultant
..………………………….
..………………………….
Contractor
..………………………….
..………………………….
Tested by
...………………………….
...………………………….
3141A
FINAL FACTORY INSPECTION CERTIFICATE
Client : …………………………………………………………………...
Consultant : ………………………………………………………….....
Project : ………………………………………………………………....
Panel Title : ………………………………………………………….....
Date :…………………………………...
Job No. :……………………………....
Drawing No. : ………………………....
Panel Sl.No. : ……………………..…..
This is to confirm that the Final Factory inspection of the referred …………………………………………….
……………………………………………………………………………………………………….…………………
was carried out in accordance to the IEC 61439-1/2 standards, approved factory inspection & testing
procedure and drawings.
The results of the inspection & testing were found satisfactory and the panel was found to be in compliance
to the standards, approved drawings and project requirements.
Inspection and Testing Programme
Routine tests as per IEC 61439-1/2 standards
1
2
3
Degree of protection of enclosures as per IEC 61439-1 standard sub-clause 11.2
Clearance and creepage distances as per IEC 61439-1 standard sub-clause 11.3
Protection against electric shock and integrity of protective circuits as per
IEC 61439-1 standard sub-clause 11.4
4
5
Incorporation of built-in components as per IEC 61439-1 standard sub-clause 11.5
Internal electrical circuits and connections as per IEC 61439-1 standard
sub-clause 11.6
6
7
8
9
Terminals for external conductors as per IEC 61439-1 standard sub-clause 11.7
Mechanical operation as per IEC 61439-1/2 standards sub-clause 11.8
Dielectric properties as per IEC 61439-1 standard sub-clause 11.9
Wiring, operational performance and function as per IEC 61439-1 standard
sub-clause 11.10
Verified
Note: For details of inspection and results, refer to "Final Factory Inspection Report"
Client
…………………………..
…………………………..
Consultant
……………………………..
……………………………..
Contractor
……………………………..
……………………………..
Tested by
…………………………..
…………………………..
20.0
INSTALLATION, TESTING AND COMMISSIONING CERTIFICATES
Considering the importance of testing and commissioning of low voltage switchboards, all
testing equipments and certificates are upgraded regularly. The testing and commissioning
certificates are:
1.
2.
3.
4.
Installation Inspection Report - 3124
Installation Inspection Certificate - 3125
Commissioning Report - 3144
Testing and Commissioning Certificate - 3145
30 of 51

Ref. 6302K
3124D
INSTALLATION INSPECTION REPORT
Client : …………………………………………………………………
Consultant : …………………………………………………………..
Project : ……………………………………………………………….
Panel Title :……………………………………………………………
Inspection carried out for
1 Switchboard layout
a Switchboard location is as per the approved drawings, requirements & local regulations
b Minimum clearances around the panel is maintained as per local regulations
c Operational & maintenance access to the switchboard are as per requirement
d Door opening space & withdrawable unit access area are as per requirements
e Clearance above and below panel are sufficient to permit smooth cable / bus raiser entry
f Switchboard is located in clean, dry, safe and easily accessible place
g Switchboard is fixed to floor / wall as per manufacturer's recommendation
h Adequate & approved supports are provided for securing the switchboard to floor / wall
i Switchboard location is away from the proximity of water, drainage and gas pipe
j Switchboard location is free from hazardous item, material or equipment
k Emergency lighting with sufficient illumination level is available
l Fire alarm detectors are present for fire detections in close proximity
Reference Documents Used are
Switch Board Drawings & Installation Procedure
2 Switchboard Installation
a Switchboard assembly - No scratches or deformation, Free from dust and foreign objects
b Switchboard re-assembly-mechanical connections between cubicles & order of cubicles
c Busbar connections tightened to the required torque level at transport section joints
d Verification of protective earth conductor connections on metal component
e General tightening of all the busbar connections and component terminations
f General verification of creepage and clearances after all busbar connections are made
g Installation & connection of all components (if any), which were supplied separately
h Re-verification of circuit breakers rating and setting as per drawings
i Fully drawout all the withdrawable units and re-instate to service position
j All temporary openings are plugged and all gaskets are provided to maintain IP rating
k Labels, busbar protective shrouds, front plates, doors and cover panels are provided
l Mechanical interlocks, key locks and keys for devices and switchboard are provided
3 Cable Installation
a Cable trenches size and location are as per requirement and installation is satisfactory
b Cable tray type, size & accessories are as per requirement and installation is satisfactory
c Cable tray earth connection and earth continuity of cable trays
d Arrangement of cables in cable trays and trenches are satisfactory
e All cables are mechanically protected and tied to cable trays at regular intervals
f Power and ECC cable type and sizes are as per approved drawings and breaker ratings
g Control cables (where applicable) type, no. of cores, sizes & core identification as per approval
h Cable glanding, gland type and armoured cables earthing using earth tags
i Single core cables (if any) are glanded on non-magnetic gland plates
j Cable tags, tag description, circuit marking and coding of cables as per drawings
k Verify minimum bending radius of cables & securing cables inside switchboard
l Cable termination - Lug compatibility, material, contact area, crimping & connection hardware
m No excessive mechanical forces exerted on device connections
Date : ...…………………………………….
Job No. : ….………………………………
Drawing No. : ………………………………
Panel Sl.No. : ………………………………
Verified
Comments
Client
..………………………….
..………………………….
Consultant
..………………………….
..………………………….
Contractor
..………………………….
..………………………….
Tested by
...………………………….
...………………………….
3125A
INSTALLATION INSPECTION CERTIFICATE
Client :……………………………………………………………………
Consultant : …………………………………………………………….
Project : .…………………………………………………………………
Panel Title : ……………………………………………………………..
Date : …………………………………..
Job No. : ………………………………
Drawing No. : …………………………
Panel Sl.No. :………………………….
This is to confirm that the on-site installation inspection of the referred ………………………………
……………………………………………………………………………………………………….……..
was carried out in accordance to the IEC 61439-1 standard, IEEE (Latest edition), local regulations,
approved installation procedure and drawings.
The results of the inspection were found satisfactory and the installation of panel was in compliance to
the standards, approved drawings and project requirements. The panel is approved for testing and
commissioning.
Inspection and Testing Programme
Checks carried out as per approved inspection procedure
1
General inspection of the switchboard after re-assembly at site including
inspection of busbar connections
2
Checking of protective measures of the electrical continuity of the protective
circuits including earthing and earth bonding.
3
4
5
Verification of breaker ratings and final adjusted setting.
Verification of cable sizes, terminations and tags of cables.
Verification of presence of protective shrouds.
Verified
Note: For details of inspection, refer to "Installation Inspection Report"
Client
…………………………..
…………………………..
Consultant
……………………………..
……………………………..
Contractor
……………………………..
……………………………..
Tested by
…………………………..
…………………………..
3144A
COMMISSIONING REPORT
Client :………………………………………………………………….
Consultant :…………………………………………………………...
Project :………………………………………………………………..
Panel Title : …………………………………………………………...
Inspection carried out for
1 Documents and Tools verification
a As-built drawings are provided with in the panel and verified
b Availability of different approved test procedures for testing.
c Spare parts are provided as per the list
Reference Documents Used are As-built drawings, spare parts list, Factory Final Inspection test reports,
Installation Instruction and Test Procedures.
d Factory final inspection reports are verified
e The necessary testing equipments are checked for calibration
2 Conformity of Electrical and Mechanical Connections
a Switchboard is fixed to floor / wall as per manufacturer's recommendation
b Adequate & approved supports are provided for securing the switchboard to floor / wall
c Cubicles are coupled with Gasket and recommended fish-plates
d All the bus bar connections are tightened with appropriate torque pressure
e Outgoing and incoming cables are glanded/terminated properly
f Adequate supports are provided for incoming and outgoing cables
g Verification of electrical clearance between bus bars and creepage distance of the supports
h Verification of additional holes in gland plates (This will reduce the IP rating)
i Control cables are crimped and terminated properly.
j The AC and DC supplies are distinguished by different colour code
k Compatibility between the cable cross section or lugs and the device tunnel or terminal
l Both internal and external Power & Control cables are identified as per the requirement
3 Conformity of Devices and Installation
a The installed switching devices are verified with As-built drawings
b The device accessories are verified as per the as-built drawings
c The devices are mounted as per the manufacturer's recommendation
d Ensure the smooth operation of all the devices.
e Switchboard is installed as per the Manufacturer's recommendation
f The front and rear clearances are maintained as per requirement
4 Precautions before testing
a All relevant safety messages, signs and warning labels are provided
b The panel is free from dust
c The panel is free from foreign objects like cables, wire off-cuts, hardware, tools etc.
d Ensure the insulation level of the panels
5 Protection of Persons
a The connections of protective conductors and connections between the cubicles
b Presence of earth braid in all movable parts of the enclosures
c Ensure the electrical continuity between the cubicles and doors.
d Partitions are as per form of constructions and rigidity of the bus bar shrouds
6 Energizing the switchboard
a Phase sequence of the main power supply
b Outgoing circuits are energized one by one and the operating sequence is verified
c Verification of electrical - mechanical interlocks, indication and measuring instruments etc.
Date :.. ...…………………………………...
Job No. :…….……………………………....
Drawing No. :……………………………….
Panel Sl.No. :……………………………….
Verified
Comments
Client
..………………………….
..………………………….
Consultant
..………………………….
..………………………….
Contractor
..………………………….
..………………………….
Tested by
...………………………….
...………………………….
3145A
TESTING AND COMMISSIONING CERTIFICATE
Client : …………………………………………………………………...
Consultant : ………………………………………………………….....
Project : ………………………………………………………………....
Panel Title : ………………………………………………………….....
Date :…………………………………...
Job No. :……………………………....
Drawing No. : ………………………....
Panel Sl.No. : ……………………..…..
This is to confirm that the on-site installation inspection of the referred ………………………………………….
……………………………………………………………………………………………………….…………………….
was carried out in accordance to the IEC 61439-1 standard, approved testing & commissioning
procedure and drawings.
The results of the tests were found satisfactory. Hence the switchboard was commissioned and put into service.
The functionality of the switchboard was found satisfactory as per project requirements.
Inspection and Testing Programme
Checks carried out as per approved test procedure
1
2
3
4
5
6
Insulation resistance test.
Auto and manual functions and safety interlocks.
Metering functions (where applicable).
Earth leakage and other protection relays (where applicable).
Any other specific test as per requirement.
Commissioning carried out and the switchboard was put into service.
Verified
Note: For details of inspection, refer to "Testing and Commissioning Report"
Client
…………………………..
…………………………..
Consultant
……………………………..
……………………………..
Contractor
……………………………..
……………………………..
Tested by
…………………………..
…………………………..
21.0
AREAS OF CONCERN
Energy
Industry
Residential
Infrastructure
31 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
155
16
17
18
CLIENT
BURJUMAN CENTRE (L.L.C)
EMIRATES
GASCO
AL GHURAIR CENTRE
JUMEIRAH BEACH RESIDENCE
TABREED
TABREED
DUBAI CIVIL AVIATION
GASCO
DUBAI CIVIL AVIATION
DUBAI NATIONAL INVESTMENTS
GULF IMPORT & EXPORT Co.
AL ROSTAMANI GROUP
DUBAI INTERNET CITY
JUJUMEIRAH BEACH RESIDENCECSC
P.W.D
MAJID AL FUTTAIM INVESTMENT
DUBAI INTERNET CITY
CONSULTANT
DAR AL HANDSAH SHAIR AND PARTNERS
ADPI
ARENCO
NGC INTERNATIONAL
DAR
ELLERBE BECKET
ELLERBE BECKET
KENNEDY & DONKIN
S.C.T.P
DAR AL-HANDASAH
NORR GROUP CONSULTANTS
GULF IMPORT & EXPORT Co.
W.S. ATKINS
SPP
HYDER CONSULTINGCO SUG
BELGIAN ARAB CONSULTANTS
WSP
ARENCO
PROJECT
THE NATIONAL CO. (KHARAFI NATIONAL)
EMIRATES NEW ENGINEERING CENTRE
BUHASA ACCOMMODATION COMPLEX
AL GHURAIR CENTRE EXPANSION
JUMEIRAH BEACH RESIDENCE
DISTRICT COOLING PLANT T2 & T3A
DISTRICT COOLING PLANT T4 & 3B
DUBAI AIRPORT EXPANSION TD-196
ASAB ACCOMMODATION COMPLEX
CENTRAL UTILITY COMPLEXES - 4
METROPOLITAN BEACH - RESORT TOWERS
NFM - AGOM
21st CENTURY TOWER, DUBAI
MEDIA CITY PHASE-III, DUBAI
JJBR1- PODIUMOU
GENERAL HOSPITAL AL RAHBA
SOUK AL NAKHEEL
DUBAI INTERNET PHASE III
PRODUCT
MDB,SMDB, MCC, DB, CAP.PANEL&METER CABINET
MDB,SMDB,MCC,CAP.PANEL & DB
MDB,SMDB, MCC & DB
MDB,SMDB, MCC& FINAL DB
MDBS,MCCS,SMDBS,DBS & CAP. PANELS
MOTOR CONTROL CENTRE
MOTOR CONTROL CENTRE
MDB,MCC,SMDB & DB
MCC,MDB,SMDB & DB
MDBS,MCCS,SMDBS & DB
MDB,MCC,SMDB,CAP.PANEL & DB
MCC PANELS
LV PANEL,SMDB,DB & MCC
LV PANEL,SMDB,DB & MCC
MDB,SMDBS,DBS,MCCS & CAP.BANK,SS, S, CCS C
MDB,SYN.PANEL,SMDB,CAP.PANEL & FINAL DB
MDBS,MCCS,CAPACITOR & DB
MDB,MCC,SMDB,DB & CAP.PANEL
32 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL. No.
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
CLIENT
DUBAI MEDIA CITY
EMMAR
TABREED
EMIRATES OF ABU DHABI GENERAL
INDUSTRY CORPORATION
EMMAR PROPERTIES
NATIONAL HYDRO ELECTRIC POWER CORPORATION Ltd.
MAJID AL FUTTAIM INVESTMENTS
ADCO
EMMAR
AL GHURAIR GROUP LLC
EMARAT
DUBAI INTERNET CITY
JEBEL ALI CONTAINAR GLASS FACTORY
EMIRATES OF ABU DHABI WORK DEPARTMENT
EMIRATES OF ABU DHABI GENERAL
INDUSTRY CO OSCORPORATIONO
TABREED
M.P.W.H
H.E.KHALIFA BIN AHMED AL OTAIBA
CONSULTANT
SCHUSTER, PECHTOLD AND PARTNERS
ROBERTS PARTNERS
TABREED
W. S. ATKINS & PARTNERS OVERSEAS
NORR GROUP CONSULTANTS
SNC LAVALIN INC.
HALFORD ASSOCIATES
ECG ENGINEERING
NORR GROUP
AL GURG CONSULTANTS
ARENCO
AL TURATH ENGG.
STONE & WEBSTER
AL BURJ. ENGG. CONSULTANTS
W. SW S. ATKINS & PARTNERS OVERSEAS
SHANKLAND COX Ltd.
H D P OVERSEAS
SYR CONSULT
PROJECT
DUBAI MEDIA CITY PHASE III
RESIDENCES AT BURJ DUBAI
AL- AIN AIR COLLEGE
ABU DHABI INDUSTRIAL CITY
MARINA TOWER
CHAMERA HYDROELECTRIC PROJECT,
STAGE-II HIMACHAL PRADESH
SOUK AL NAKHEEL - SNOW DOME
BAB INFRASTRUCTURE & BAB 13
EMMAR HEAD QUARTERS, DUBAI
DUBAI POLYFILM CO. EXPANSION
G+4 OFFICE COMPLEX PLOT. NO-155/DUBAI
FALCON CABLE LANDING STATION P-109
JEBEL ALI CONTAINAR GLASS FACTORY
GULF LIBRARY MANUSCRIPTS &
STUDIES CENTRE
ABU DHABI INDUSTRIAL CITY (CONTRACT-2A)(CONTRACT 2A)
COOLING PLANTS FOR AL TOWAISA
MILITARY BASE
KALBA HOSPITAL, SHARJAH
FOUR POINT HOTEL BY SHERATON AT SHARJAH
PRODUCT
MDB,MCC,SMDB,DB CAP. PANEL
MDBS, SMDBS, MCCS, DB
LV MCC,MDB & MCC
MDB,SMDB,CAP.PANEL,FEEDER PILLAR,
FINAL DB & CONTROL PANELS
MSB,MCC,SMDB & DB
MDB, SMDB & FINAL DB
MDB,MCC,SMDB,CAP.PANEL & DB
LV PANEL,SMDB,DB & MCC
LV PANEL,SMDB,DB & MCC
MDBS,MCCS,SMDBS & DB
MDB,SMDB & FINAL DB
LV PANEL,SMDBS,CAP.BANK,DBS & ISOLATOR PANEL
MAIN DISTRIBUTION BOARD
MDB,SMDB,CAP.PANEL,FINAL DB &
CONTROL PANELS
MDB,SMDB,CAP.PANEL,FINAL DB &
CONTROL PANELSCOOS
MCC,ATS & DB
LV PANEL,SMDB,DB & MCC
MDB,MCC,SMDB & FINAL DB
33 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL. No.
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
CLIENT
W.E.D.
WED - ALAIN
NATIONAL PROJECTS
ADGAS
TABREED
ABUDHABI NATIONAL OIL CO.
TABREED
CUMMINS DIESEL
FIRST GULF BANK
DEFENCE
CIVIL AVIATION DUBAI
BURJUMAN CENTRE L.L.C
P.W.D
R.A.K. CERAMICS
DUBAI MUNICIPALITY
WOMEN'S ASSOCIATES
DUBAI INTERNET CITY (TECOM)
UNITED ARAB EMIRATES MINISTRY OF
PUBLIC WORKS & HOUSING
CONSULTANT
EWBANK PREECE
CANSULT
EREX CONSULTANT
IAN BANHAM & ASSOCIATES
TABREED
KHATIB & ALAMI
TABREED
CUMMINS DIESEL
AL SALAAM
DEFENCE
INT'L BECHTEL INC.
DAR-AL-HANDASAH
W. S. ATKINS & PARTNERS OVERSEAS
R.A.K. CERAMICS
ITAL CONSULT
IAN BANHAM ASSOCIATES
AL TURATH
GIBB MIDDLE EAST
PROJECT
MIRFA POWER & DISALINATION
100 WELLS & TELEMETRY SYSTEM IN SHUWAIB
AL REEF COMPOUND
PROJECT-8003/DAS ISLAND
TABREED COOLING PLANT-3B EXTENSION
NEW LPG FILLING PLANT-MUSSAFAH
TABREED PHONIX
PHASE-1
PRODUCT
DISTRIBUTION BOARDS
L.T. SW,BD,SYN.PANEL,SOFT STARTER PNL,
WELL HEAD CONTROL PANELS
MDB,SMDB & CAP.PANEL
MDB,MCC,SMDB & FINAL DB
MOTOR CONTROL CENTRE
ANNOLAC,MDB,MCC & ATS
MOTOR CONTROL CENTRE
MAIN DISTRIBUTION BOARD
MDB,SMDBS,DBS & MCCS
MDB, SMDB & DB
MAIN DISTRIBUTION BOARD
SMDBS, DBS,MCP & METER CABINET
MDB,ATS PANEL,SMDB,FINAL DB & CAP. PANELS
MDBS,CAP.BANK & SMDBS
MDB,SMDB & FINAL DB
MDB,SMDB & FINAL DB
LV PANEL, SMDB, DB, & MCC
MDB,SMDB,DB & CAP.PANELS
IRAQ PROJECTS
FIRST GULF BANK HEAD QUARTERS
MW - 1590
TD51 DUTY FREE WARE HOUSE
BURJUMAN CENTER EXPANSION DUBAI
GUARD ADMINISTRATION BUILDING AL AIN
MODERN CERAMICS-9
CUSTOMS HEAD QUARTERS & DOC
WOMEN'S ASSOSIATION BUILDING
MAIN TELEPORT AT JABEL ALI, DUBAI
COMPREHENSIVE TECH. SCHOOL AT RAK
34 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
CLIENT
MAJID AL FUTTAIM
DUBAI CIVIL AVIATION
SHEIKH SULTAN SURROR AL DHAHERI
EAST COST CO.
DUBAI INTERNET CITY
DUBAI INTERNET CITY
ABU DHABI MUNICIPALITY
H.HH H SHEIKH MANSOOR
RULERS REPRESENTATIVE IN EASTERN REGION
HYATT REGENCY
ZADCO
EMIRATES OF ABU DHABI WORK DEPT.
ABU DHABI MUNCIPALITY
P.W.D
ARCOI QATAR INC.
GOVERNMENT OF ABU DHABI GENERAL
AUTHORITY FOR HEALTH CARE
INTERNATIONAL CAPITAL TRADING
P.W.D. AL AIN
CONSULTANT
RENAULT & PARTNERS
DAR AL HANDSAH
AL SUWEIDI ENGG CONSULTANTS
INTERNAL ENGG. CENTER
AL TURATH ENGG. CONSULTANT
AL TURATH ENGG. CONSULTANT
FEDERIC R. HARRIS INC.
INTEGRATED DESIGN BUREAU
KEO INTERNATIONAL CONSULTANTS
SERVEU
SUIDAN & ASSOCIATES
TECHNICAL STUDIES BUREAU
ARABIAN ENGINEERING CENTRE
BELGIAN ARAB CONSULTANT BUREAU
PARSONS TECHNIP
EHA CONSULTING ENGINEERS
BIONA CONSULTING ENGG
T.K.B. CONSULTANT
PROJECT
AJMAN RETAIL DEV. - CONTINENT FIT OUT
DUBAI AIRPORT CARGO VILLAGE EXPANSION
EMIRATES SKY CARGO CENTRE
SHEIKH BUILDING
50 VILLAS PROJECTS AT RAS AL KHAIMA
POP-JUMAIRAH ISLAND
MAIN TELEPORT STATION AT JABEL ALI, DUBAI
MINA ZAYED FREE ZONE
COMMERCIAL BUILDING
DIWAN BUILDING
HYATT REGENCY
ZIRKU FACILITIES NEW CONT. CAMP
AL RAHA BEACH RESORT, ABU DHABI
PUMPS, GENERATOR & 11KV OVERHEAD
LINES IN BEDAA GHANEM AREA.
SGENERAL HOSPITAL AL RAHBA
ARCO AL RAYYAN OIL DEVELOPMENT, QATAR
ADDITION, ALTERNATION,MAINTENANCE
WORKS FOR TAWAM HOSPITAL AL AIN
DEVELOPMENT OF FLATS C1 - C6
COMB. SCHOOL - AL HAYER
PRODUCT
MDB,SMDB,DB & SYN. PANEL
MDB, MCC& DB
MDB,SMDBS,DBS & MCCS
MDB,SMDB & FINAL DB
MDB,SMDB,CAP.PANEL & DB
MDB,SMDB,CAP.PANEL & DB
STREET LIGHTING CONT.PANEL
MDB,SMDBSMDB SMDBS & DB
MDB,SMDBS,CAP.PANEL & DB
CHILLER PANEL,VFD PANEL
MDB,SMDB & FINAL DB
SMDB,DB & CONTROL PANELS
MDB & SYNCHRONISING PANEL
MDB & AC PANELS
MDB,SMDB & FINAL DB
MDB & CAPACITOR BANKS
MOTOR CONTROL CENTRE
MDB,SMDB & FINAL DB
35 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
CLIENT
GASCO
QATAR TELECOMMUNICATION
W.E.D
ADNOC FOD
PWD
RAS AL KHAIMAH CEMENT Co.
W.E.D. ABU DHABI
SEREX INTL CONSULTANT
M.P.W. & H. - DUBAI
AMANA STEEL
KASSIM ISMAIL AHMED MOHAMMED
PWD
ABU DHABI WATER & ELECTRICITY AUTHORITY
TAWAM HOSPITAL
AL KHASANA INSURANCE
AL GAITH HOLDING
EMAAR
JUMEIRAH BEACH RESIDENCE
CONSULTANT
S.C.T.P
QATAR TELECOMMUNICATION
D. BALFOUR & SONS
ADNOC FOD
MAKHLOUF
LAFARGE
TEBODIN CONSULTANT
SEREX INTL CONSULTANT
EHA CONSULTING CENTER.
MOT MAC DONALD
SPACE CONSULT
E. KRAUT CONSULTANT GERMANY
ESB INTERNATIONAL
PAC INTERNATIONAL
AGG
NATIONAL ENGINEERING BUREAU
HYDER CONSULTING
IAN BANHAM
PROJECT
BAB ACCOMMODATION COMPLEX
IDC BUILDING- QATAR
MARFA HILL TOP PUMPING STATION
LOBP / GREASE PLANT
EXTENSION OF EXISTING PRIVATE SUITS AT
AL MAFRAQ HOSPITAL
3100 TPD CEMENT PLANT
PUMPING FAC. FOR SEA PALACE
WARE HOUSE FOR ADIA AT MUSSAFAH
HIGHER SECONDARY SCHOOLS
TUFTED CARPET FACTORY AT MUSSAFAH
G+10 COMM. PLOT - 416
10MG WATER RESERVOIR & PUMPING STATION
NEW 132/11KV SUBSTATION
AL TAWAM HOSPITAL
AL KHASNA INSURANCE BLDG, ABU DHABI
DALMA & YASSAT TOWER, DUBAI
BURJ DUBAI OLD TOWN RESIDENTIAL
AT PHASE-3
JUMEIRAH BEACH RESIDENCE -6
PRODUCT
MCC,MDB,SMDB & DB
MDB,MCCS & DB
MOTOR CONTROL CENTRE
L.V.PANEL BOARDS
MDB,SMDB & FINAL DB
CONTROL PANELS
MOTOR CONTROL CENTRE
ATS,CAP.PANEL,SMDB,LVP,DBATS CAP PANEL SMDB LVP DB & MCCB
MDB,SMDB & FINAL DB
LV,CAP.PANEL,SMDP & DB
MDB,SMDB & DB
CONTROL PANEL,CAP.PANEL & DB
AC MDB,SDB & LDB
MDB,SMDB &FINAL DB
MDB,MCC,SMDB & FINAL DB
MDB,SMDB & DB
ACB, MSB, SMDB, CAP.BANK PANEL, METER CABINET, DB &
CONTROL PANELS
MDB, SMDB, MCC, CAP.BANK PANEL & DB
36 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
CLIENT
DUBAI FESTIVAL CITY
ZAYED UNIVERSITY
EMAAR
Mr. MOHAMMAED ABDALLAH AL GERGAWI
EMAAR
Mr. HUMAID AHAMED BIN DRAI
EMAAR
EMAAR
DUBAI INTERNATIONAL MARINE CLUB
TABREED
DUBAI MUNICIPALITY
ABU DHABI GAS INDUSTRIES
UNITED TEXTILE FACTORY
GULF PHARMACEUTICAL INDUSTRIES
FIRST GULF
DUBAI CIVIL AVIATION
RAS LAFFAN LIQUIFFIED NATURAL GAS CO. Ltd.
AL FUTTAIN REALESTATE
CONSULTANT
HYDER CONSULTING
SHANKLAND COX Ltd
HYDER CONSULTING
IAN BANHAM
HYDER CONSULTING
CCD
HYDER CONSULTING
NOOR GROUP
ARCH GROUP
SNC LAVALIN GULF CONTRACTORS
AL TURATH ENGG CONSULTANTS
SNAMPPROGETTI
CONCEPT CONSULTING ENGINEERING
GULF PHARMACEUTICAL INDUSTRIES
IAM BANHAM
DAR AL HANDSAH
RAS LAFFAN LIQUIFFIED NATURAL
GAS CO. Ltd.
KLING CONSULT
PROJECT
DUBAI FESTIVAL CITY
ZAYED UNIVERSITY
BURJ DUBAI PHASE -3
AL SOUFOUTH MIXED USE DEVELOPMENT DUBAI
BURJ DUBAI PHASE -3
PARK PALACE
DUBAI MARINA-7W7X- DUBAI
BURJ VIEWS PLOT NO 85
G+9 STOREYED LUXUARY BEACH RESORT AL MINA
SEYAHI DUBAI
DIST. COOLING PLANT AT UNIVERSITY LOCATED AT
KHALIA CITY
COLD STORAFGE AT CENTRAL FRUIT AND VEG.
MARKET
GASCO RUWAIS 3rd NGL TRAIN
UNITED TEXTILE FACTORY ON PLOT NO 45.
FUJAIRAH
JULPHAR GULR PHARMACEUTICAL INDUSTRIES
COMM. RESI BLDG, AL NADHA
DUBAI INTRTNATIONAL AIRPORT EXPANRION
(PHASE-2)
GASCO RUWAIS 3rd NLG TRAIN
AL FUTTAIM MOTOR PARTS DISTRIBUTION CENTER
@ DIP
PRODUCT
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
ACB, MCC SSB CAP BANKACB MCC, SSB, CAP.BANK PANEL & DB
MDB, SMDB, MCP, CAP.BANK PANEL & DB
MCC, VFD PANELS AND CAP.BANK PANEL
L.V.PANEL, MDB, SMDB, CAP.BANK PANEL & DB
MCC
MDB, SMDB, CAP.BANK PANEL & DB
MDB
MDB, SMDB, ATS, CAP.BANK PANEL, DB & ISOLATOR
PANELS
CONTROL PANELS
CONROL PANELS
MDB, SMDB, CAP.BANK PANEL & DB
37 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
CLIENT
SAEED HUMAID MATAR AL TAYER
ABDULLA HASSAN AL RUSTAMANI
DEPARTMENT OF CIVIL AVIATION
DUBAI SPORTS CITY
KLEINDIENST & PARTNERS
KHARAFI NATIONAL CO
DUBAI POLICE FORCE
OMNIYAT
ENGINEERS OFFICE
JIWIN INVESTMENTS
LINK INVESTMENTS
ABU DHABI GAS INDUSTRIES
EMITATES OF ABU DHABI
H.H. SHEIKH HAMDAN BIN ZAYED AL NAHYAN
H.H. SHEIKH HAMDAN BIN ZAYED AL NAHYAN &
LINK INVESTMENT
DEPARTMENT OF THE PRESIDENTS AFFAIRS ABU DHABI
HIGHER CORPORATION FOR SPECIALIZED ECONOMIC
ZONES INDUSTRIAL CITY OF AXD
ABU DHABI NATONAL HOTEL
CONSULTANT
IAM BANHAM
IAM BANHAM
ADPI / DAR AL HANDSAH
SINCLARIKNIGHT MERS (SKM)
HALCROW
KHARAFI NATIONAL CO
ARIF & BINTOAK
SPEC
ENGINEERS OFFICE
LACASA
BAINONA
SNAM PPROGETTI
WS ATKINS & PARTNER OVERSEAS
IAN BANHAM & ASSOCIATES
DEWAN
AL SALAAM
AL RAMAHI ENGG.
AL SALAAM
PROJECT
AL TAYER TOWER – AL BARSHA
AL ROSTAMANI TOWERS
JXB1/DB/220 CARGO TERMINAL BUILDING
CRICKET STADIUM-S3
EUROPEAN BUSINESS CENTRE
LABOUR CAMP. DUBAI
TRANSPOET AND RESCUE DEPARTMENT COMPLEX
FOR DUBAI POLICE FORCE
ONE @ BUSINESS BAY
EVENT ARENA @ AL MARMOOM, DUBAI
G+2 LABOUR ACCOMODATION
DEVELOPMENT OF FLATS C1/Z-9 SHK. MOHD BIN
ZAYED CITY AXD
GASCO RUWAIS 3rd NGL TRAIN
ETHIHAD INTERIM TERMINAL
CONSTRUCTION, AXD
AL KAMAL TOWER
COMPLEX OF 18 VILLAS FOR H.H. SHKA.
MOZA BINT HAMDAN AL NAHYAN
MISCELLANEOUS BUILSDINGS AT
ABU AL ARYAD ISLAND
ABU DHABI BUSINESS HUB, PHASE-1 OFFICE
COMPLEX
SPECTRUM GLASS FACTORY-AXD
PRODUCT
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL, CHILLER PANELS & DB
MDB, SMDB, SYNCHRONISING PANEL
L.V. PANEL , SMDB, DB & FEEDER PILLER
L.V.L V PANELS , SMDB MCC, CAP.BANK PANEL & DBSMDB, MCC CAP BANK
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, CAP.BANK PANEL & DB
MCC
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MCC & CAP.BANK PANEL
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB & DB
MDB, SMDB, ATS, & CAP.BANK PANEL
38 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
CLIENT
GENERAL AUTHORITY FOR HEALTH SERVICES
H.H. SHEIKH TAHNOON BIN MOHAMED AL NAHYAN
MUBADALA DEVELOPMENT
SHARJAH MUNCIPALITY
GOVT. OF DUBAI AIRPORT FREE ZONE AUTHORITY
TAMEER
MAF SHOPPING MALLS
ALDAR (MASSEERA)
EMIRATES INTERGRATED TELECOMMUNICATIONS
COMPANY PJSC (DU)
GENERAL AUTHORITY FOR HEALTH SERVICES
BEACON EDUCATION
OMAR AL MANA (QATAR)
AL FUTTAIM REAL ESTATE
DUBAI PROPERTIES
NAKHEEL
EMIRATES MEDIA ASSOCIATION
ALDAR
TABREED
CONSULTANT
HDP (OVERSEAS) Ltd.
AL SALAAM
COX GROUP
HALLCROW
M. ENGINEERING. INC
ADAN SAFFARINI
WSP MIDDLE EAST
HALCROW
AL TURATH ENGINEERING
GENERAL HEALTH AUTHORITY
W.S. ATKINS
ARCHITECTURAL CONSULTING GROUP
N.E. AZZAM & PARTNERS
KHATIB & ALAMI
DYNAMIC ENGINEERING CONSULTANT
TAMMER CONSULTING ENGINEERING &
MANAGEMENT
CLARKEBOND MIDDLE EAST
ENGINEERING AND MANAGAMENT
TABREED
PROJECT
PRIMARY HEALTH CARE CENTER AT AL MUWAIJI- ALMUWAIJI
AIN
AL AIN ROTANA HOTEL EXTENTION PHASE-1
UAE UNIVERSITY NEW CAMPUS
DIBBA AL HISN SEWARAGE NETWORK PHASE-1
CENTRAL CHILLING PLANT MODIFICATION
PRINCESS TOWER (DXB)
MIRDIF CITY CENTRE
YAS ISLAND DEVELOPMENT
TECOM INVESTMENT FZ-L.L.C, SPORTS CITY
VICTORY HEIGHTS & VILLA AL WARQAA
PRIMARY HEALTH CARE CENTER IN
MADINAT ZAYED – ABU DHABI
BEACON EDUCATION SCHOOLS AT
AL RAHA GARDENS (AXD)
AL MANA VILLAS
INTERCON HOTEL STAFF
BAY SQUARE AT BUSINESS BAY
613 VILLAS @ JUMEIRA VILLAGE
UNITED PRINTING AND PUBLISHING
LABOUR VILLAGE @ AL AIN
TABREED COOLING PLANT RB-04 (017721),
AL RAHA BEACH, AXD
PRODUCT
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, MCC & MCP
MDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB
MDB, SMDB, ATS, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
M.V. PANEL, SMDB, CONTROL PANEL & ATS PANEL
MDB, SMDB, MCC, CAP.BANK PANEL & DB
MDB, SMDB & DB
MDB, SMDB, METER CABINET, CAP.BANK PANEL & DB,,,
MDB, SMDB, ACB PANEL, CAP.BANK PANEL & DB
MDB, SMDB, CAP.BANK PANEL & DB
MCC, CAP.BANK PANEL & CONTROL PANEL
39 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
CLIENT
TABREED
TABREED
TABREED
DEPARTMENT OF THE PRESIDENTS AFFAIRS
GOVERNMENT OF DUBAI ROADS & TRANSPORT
AUTHORITY
UAE ARMED FORCES DIRECTORATE OF MILTARY
WORKERS (DMW)
PACIFIC CONTROLS
H.HH H SHAIKH RASHID BIN KHALIFA AL MAKTOUM
GOVERNMENT OF DUBAI ROADS & TRANSPORT
AUTHORITY
GOVERNMENT OF DUBAI ROADS & TRANSPORT
AUTHORITY
SHETH ESTATE (INTERNATIONAL) Ltd.
JULPHAR
Mr. ABDULAH HAMAD OBAID AL SHAMSI
SHARJAH MUNICIPALITY
ABUDHABI INVESTMENT COUNCIL
INTERNATIONAL CAPITAL TRADING
GIFFIN TRAFFIKS LLC
EMIRATES LAND GROUP POST BOX-26536, ABUDHABI
UAE.
CONSULTANT
TABREED
TABREED
TABREED
DEWAN ARCHITECTS & ENGINEERINGS
ATKINS
PROJECT
TABREED COOLING PLANT RB 02 (017721)RB-02 (017721),
AL RAHA BEACH, AXD
TABREED COOLING PLANT T-07, P-7301
ZAYED MILITARY CITY,( AXD)
TABREED COOLING PLANT T-08, P-7301
ZAYED MILITARY CITY,( AXD)
AL RAWDHA PALACE
DUBAI METRO-RASHIDIYA DEPOT
MW/SOC/CFD/SC/208/247
PRODUCT
MCC, CAP.BANK PANEL & CONTROL PANEL
L.V. MCC & CAP.BANK PANEL
L.V. MCC & CAP.BANK PANEL
CAPACITOR BANK PANELS
MDB & MCC
LV PANES & CAP. PANELS
MDB,SMDB,MCC,CAP.PANEL & DB
MDB,SMDB,MCC,CAP.PANELMDB SMDB MCC CAP PANEL & DB
MDB,SMDB & DB
MCC
MDB,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB
LV. PANEL
MDB,SMDB,CAP.PANEL & DB
MDB,MCC & CAP.PANEL
MDB & ACB PANELS
MDB,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB
MDB,SMDB,CAP.PANEL & DB
MCC & CONTROL PANELS
ORBIT ENGINEERING CONSULTANTS
M/S. ARKIPLAN CONSULTING ARCHITECTSS
& ENGINEERS
ATKINS
ATKINS
WS ATKINS & PARTNERS OVERSEAS
CLOUD COMPUTING CENTER
B+G+12 FLOOR PARKING BUILDING
LATIFA TOWER
PROJECT DM-001 DUBAI METRO PROJECT - GREEN
LINE
DUBAI METRO(DM-001)-RASHIDIYA DEPOT
IRIS BAY PLOT NO.BB.A.02.005
JULPHAR - J10
AL NAHDA ENG. CONSULTANT
M/S.HALCROW
ARUP
RAFIK EL - KHOURY & PARTNERS
FIRAS ENGINEERING CONSULTANT
RAMBOLL
PROPOSED (G+4P+20) BLDG
DIBBA AL HISN FOUL MAIN LIFTING PUMP STATION
TANKER DISCHARGE FACILITY
ABUDHABI INVESTMENT COUNCIL NEW
HEADQUARTERS
AL-RAHA BEACH HOTEL EXTENSION ABUDHABI UAE.
FACTORY
SHINING TOWERS AL KHALDIA COMPLEX PLOT-
C9,SECTOR-W9.
40 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
CLIENT
ADNOC
CROWN PAPER MILL LTD.
ABUDHABI INVESTMENT COUNCIL
MUBADALA
KHARAFI NATIONAL CO.(L.L.C.)
EMIRATES LAND GROUP
H.E. SHEAIKH AHMED BIN SAIF BIN MOHAMMAD AL
NAHYAN
ALDAR
DEPARTMENT OF THE PRESIDENTS AFFAIRS, ABU DHABI
DEPARTMENT OF THE PRESIDENTS AFFAIRS, ABU DHABI
TABREED
YAHSAT(UNITED ARAB EMIRATES)
ABU DHABI POLICE GHQ POLICE PROJECTS COMMITTEE
AL DAR
YAHSAT(UNITED ARAB EMIRATES)
AL GHURAIR CITY
SOROUH REAL ESTATE PJSC
CONSULTANT
PROJECT
RUWAIS HOUSING COMPLEX EXPANSION - PHASE III
PRODUCT
CAP. BANK PANELS
MDB's
MDB's, ACB PANEL,GENSET PANEL & ATS PANEL
MDB,SMDB,MCC,CAP.PANEL & DB
MDB,SMDB & DB
MDB,ACB PANELS,ATS,SMDB,CAP.PANEL & DB
MDB,ATS, SMDB, MCC, CAP.PANELS, CONTROL PANELS &
DB
MDB's
MDB,SMDB,MCC,CAP.PANEL & DB
MDB,SMDB,MCC,CAP.PANEL & DB
LV.MCC & MCC's
MDB,SMDB,CAP.PANEL & DB
MDB,SMDB,MCC,CAP.PANEL & DB
MDB,SMDB,CAP.PANEL & DB
MDB,SMDB,CAP.PANEL & DB
MDB,ATS,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB
SMDB's & DB's
PDB,SDB,MCC,CAP.PANEL & DB
CONSULTING ENGINEERING GROUP
ARUP
AECOM
IAN BANHAM AND ASSOCIATES
RAMBOLL
ACG - ARCHITECTURAL CONSULTING
GROUP
HALCROW INTERNATIONAL PARTNERSHIPP
CROWN PAPER MILL FACTORY
ABUDHABI INVESTMENT COUNCIL NEW
HEADQUARTERS
CLEVELAND CLINIC - ABU DHABI
KHARAFI NATIONAL OIL AND GAS EQUIPMENT
FABRICATION PJSC
SHINING TOWERS OF ABUDHABI AL KHALDIA
COMPLEX
NOVOTEL & IBIS HOTEL, MUSSAFAH, ABU DHABI
YAS ISLAND DEVELOPMENT SOUTHERN TUNNEL
CROSSING
PRIVATE VILLA AT LA MISERE SEYCHELLES
PRIVATE VILLA AT BARBARON SEYCHELLES
TABREED
ALTURATH ENGINEERING CONSULTANTS
ARCH.& PLANNING GROUP (APG)
ARCHITECTURE & PLANNING GROUP
ALTURATH ENGINEERING CONSULTANTS
ARIF & BINTOAK
M/S.EWAN
M/s. BURO HAPPOLD CONSULTING
ENGINEERS
TABREED COOLING PLANT SHAMS ISLAND (017906) -
SM01,ABUDHABI,U.A.E
YAHSAT SGS PROJECT SITE-A AL FALAH SWEIHAN
ROAD,ABUDHABI
EXEMPLARY SCHOOL FOR POLICE AL AIN
AL AIN LABOUR VILLAGE ATSEEH AL LAHAMA - AL
AIN
YAHSAT SGS PROJECT SITE-B AL AIN MILITARY
CAMP,CAMP AL AIN
AL GHURAIR CITY EXPANSION (PHASE-
II),DUBAI,U.A.E.
WATANI RESIDENTIAL DEVELOPMENT, PHASE 1A-
ABUDHABI,UAE
THE LAND MARK TOWER - ABU DHABI
41 of 51

Ref. 6302K
22.0
MAJOR PROJECTS EXECUTED
SL.No.
181
CLIENT
H.E.ALH E AL SHAIKH RASHID BIN KHALIFA BIN SAEED AL
MAKTOUM
CONSULTANT
ARKIPLAN
PROJECT
LATIFA TOWER, RESIDENTIAL/COMMERCIALTOWER
(B+G+M+41+2 MECH. FLOORS)
PRODUCT
LV.PANELS, ACB PANELS, CAP. PANELS,MCC, SMDB'S & DB
42 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
CLEVELAND CLINIC
YAHSAT SATTILITE STATION
43 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
AL MAKTOUM INTERNATIONAL AIRPORT
CLOUD DATA CENTRE
44 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
DUBAI FESTIVAL CITY
MIRDIF CITY CENTRE
45 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
ABU DHABI UNIVERSITY
BAVARIA DALMA TOWER
BAVARIA YASSAT TOWER
46 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
BURJ DUBAI – OLD TOWN
ETIHAD TRAINING COMPLEX
47 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
DUBAI MARINA TOWERS – X1, X2
AND X3
DUBAI MARINA TOWERS – W1, W2
AND W3
BURJ VIEWS
48 of 51

Ref. 6302K
23.0
SOME MAJOR REFERENCES
EMIRATES ENGINEERING CENTER
EMIRATES FLIGHT HANGAR
49 of 51

Ref. 6302K
24.0
MAJOR CLIENTS
Abu Dhabi Oil Refining Company (TAKREER)
Abu Dhabi National Oil Company For Distribution (ADNOC FOD)
Abu Dhabi Drilling Chemicals & Products Limited (ADDCAP)
Abu Dhabi Gas Liquefaction & Co Ltd (ADGAS)Co.
Abu Dhabi Marine Operating Company (ADMA OPCO)
Abu Dhabi National Oil Company (ADNOC)
AD Water and Electricity Authority - Village & Islands Department &Street Lighting
Department
Abu Dhabi Municipality - Irrigation and Street Lighting Departments
Abu Dhabi Company for Onshore Oil Operations (ADCO)
Abu Dhabi Gas Industries Limited (GASCO)
Ajman Fisheries
Beach Hotel, Abu Dhabi
Department of Civil Aviation Abu Dhabi International AirportAviation,
Dubai Ports Authority
Dubai Police Force
Dubai Electricity and Water Authority (DEWA)
Dubai Municipality (DM)
Department of Civil Aviation (DCA)
Department of Social Services and Commercial Buildings
EPPCO and ENOC
EMARAT
Emirates Telecommunications Corporation (ETISALAT)
Ministry of Public Works and Housing (MPWH)
Ministry of Interior
Ministry of Information & Culture, Emirates Broadcasting Corporation
National Petroleum Construction Company
50 of 51

Ref. 6302K
24.0
MAJOR CLIENTS
Public Works Department, Abu Dhabi, Beda Zayed & Al Ain
Ras Al Khaimah Cement Plant
Sharjah Electricity and Water Authority (SEWA)
Sharjah Municipality
Sharjah Oil Refinery
Town Planning Department, Abu Dhabi
UAE Armed Forces G.H.Q.
Zakum Development Company (ZADCO)
Dubai Internet City (TECOM)
Sharjah Police
EMAAR
Al Ghurair Group
51 of 51

Ref. 6302K

You might also like