1.1 Introduction
1.1.1 Project overview
Girona
Zaragoza
Lleida
Barcelona
Tarragona
Madrid
Source: Openstreetmap.org
The line connects the two most densely populated urban areas in Spain, Madrid
and Barcelona, with intermediate connections in Guadalajara, Calatayud
Zaragoza, Lleida, Tarragona (station in Camp de Tarragona, between Tarragona
and Reus).
The LAV is part of the TEN-T Priority Project 3 (high-speed railway axis of
south-west Europe), whose main objective is to provide high-speed rail
connections between the Iberian Peninsula (Portugal and Spain) and the rest of
Europe.
The LAV between Madrid and Barcelona covers 621 kilometres, and it was
developed in three stages:
Section Madrid – Lleida: opened in October 2003, and covering around
442 km of high speed rail.
Section Lleida – Tarragona: in operation since December 2006, adding
78 km of railway line to the previous section.
Section Tarragona – Barcelona (Sants station): operational since
February 2008, with an additional length of 100 km.
The LAV is still under construction in the section Barcelona to Figueres in Spain,
with 132 km expected to be completed in 2012. The section between Figueres
and Perpignan in France was completed in 2008.
Currently, the new railway line allows speeds up to 300 km/h, with future
improvements increasing the maximum commercial speed up to 350 km/h. This
implies current journey times for the commercial AVE service (Alta Velocidad
Española) between Madrid and Barcelona of between 2h 38min and 3h 19min,
depending on the number intermediate stations. The AVE service, operated by
RENFE is the fastest railway service offered on the LAV. RENFE is the unique
railway operator offering railway services on the LAV. Current journey times for
the AVE are shown in Table 1.
Stopovers Duration
Zaragoza 2h 52min
Source: RENFE
The project, as defined in the TORs, comprises 12 subprojects that account for
the construction of 72 km of rail bed and the installation of 610 km of railway
tracks. The total cost of the 12 subprojects was around €1,719 million, of which
€1,442 million was eligible for funding. The total Cohesion Fund contribution
for these subprojects in the period 2000-2006 was around €1,042 million, equal
to 72.25% of the eligible project costs.
1,041,946,723
TOTAL
(72.25%)
Source: DG REGIO
Without all these projects, most of the services currently offered on the line
would not be operational.
Capital investments corresponding to the LAV between Madrid and Barcelona
amount to €7,336 million, with total Cohesion Fund contributions around €3,389
million during the period 2000 – 2006.
Socio-economic context
The LAV goes through the Spanish regions (Comunidades Autónomas) of Madrid,
Castilla la Mancha, Aragón and Cataluña. In order to describe the socio-
economic context of the project we focus on the regions of Madrid, Aragón and
Cataluña and the cities of Madrid, Zaragoza, Lleida and Barcelona.1
Even though, anecdotally, it is believed that the LAV has had a significant socio-
economic effect on these regions, we can not conclude that changes in
population, employment and GDP per capita are a direct and only consequence
of the LAV. Moreover, regional figures might also include the impact of other
infrastructure projects being developed contemporaneously, for example the A23
motorway through in Aragón.2
Figure 2 shows the evolution of the GDP per capita between 2001 and 2008 for
the three regions involved, as a percentage of GDP per capita in Spain.
Unemployment rate between 2000 and 2010 for Spain, Madrid, Aragón and
Cataluña are presented in Figure 3. Overall, the evolution of the four series is
very similar but the levels of unemployment in Aragon, Madrid and Cataluña, are
lower throughout the period than in the rest of Spain.
1 We believe that the impact of the LAV on the region of Castilla la Mancha (stop in Guadalajara-Yebes) is
rather limited given the low number of high-speed rail services stopping there. This equally applies to the
cities of Guadalajara and Calatayud. The case of Tarragona is different, but the location of the station
(Camp de Tarragona), 12 km away from the city centre, suggests a more limited impact of the LAV in
Tarragona than in other cities.
2 The sections of the Autovia A23 that received Cohesion Funds during the period 2000-2006 are
considered in this report as a separate case study.
Figure 2. GDP per capita in regions (as % of GDP per capita in Spain)
140%
130%
Aragon
120% Cataluña
Madrid
110%
100%
2001 2002 2003 2004 2005 2006 2007 2008
25.0
20.0
Spain
Aragon
15.0
Cataluña
Madrid
10.0
5.0
0.0
2000 2002 2004 2006 2008 2010
Figure 4 shows the average growth rate of population in Zaragoza and Lleida
before and after the LAV was completed. Both cities have seen their population
increase following the arrival of the high-speed train. This result might be due to
the fact that the new infrastructure has brought these cities closer to Madrid and
Barcelona, making them more attractive areas to reside and work. We explore
this aspect further in the wider socio-economic impacts section.
2.5%
2.0%
1.5%
Before AVE (199-2003)
After AVE (2004-2009)
1.0%
0.5%
0.0%
Zaragoza Lleida Total Spanish capital
cities
As mentioned above, the project is part of the TEN-T Priority Project 3 (high-
speed railway axis of south-west Europe). This axis is expected to enable rail
connections between the Iberian Peninsula (Portugal and Spain) and the rest of
Europe without the need for reloading as a result of the gauge difference
between the rail networks in Spain/Portugal and the rest of Europe. The Madrid
– Barcelona – French borer high-speed railway line represents a decisive step for
the interoperability of Spain‟s high-speed network, as well as the improvement of
connectivity within different regions of the Spanish territory and between Spain
and the rest of Europe. The railway connection between Madrid and Barcelona
means that the two biggest cities in Spain are linked by train in two hours and a
half.
1.1.2 Sources
We have relied on a variety of different sources of information provided by DG
REGIO and by stakeholders in Spain. This allowed us to review the ex ante
analysis used in the applications for EU funding. We have obtained the funding
applications and the funding decisions for each of the 12 subprojects listed above
from DG REGIO. Each application provided a detailed description of the
respective subproject, its objectives and the expected costs. DG REGIO also
provided us with additional supporting documentation, such as the initial overall
cost-benefit analysis and the final reports for each of the 12 subprojects. We also
contacted the Transport Documentation Centre (Centro de Documenatación del
Transporte) from Ministerio de Fomento which provided us with the methodology
used in the economic analysis of railway projects.
The complete list of documents obtained, mainly related with the review of the
ex ante analysis, is provided in Table 3.
Funding Applications
DG REGIO
All subprojects
Funding Decisions
DG REGIO
All subprojects
Ex ante CBA
INECO Report. “Rentabilidad de la Línea Madrid – Barcelona DG REGIO
– Figueres”, May 2001
Methodology used in the economic analysis of the
projects, “Manual de evaluación de inversiones en Ministerio de
ferrocarriles de vía ancha", Dirección General de Fomento
Infraestructuras del Transporte Ferroviario, 1987
To carry out an ex post analysis of the project, we had meetings in Madrid with
representatives of ADIF (the railway network operators) and of RENFE (the
train operating company)
Both institutions made available significant amounts of data. From ADIF, we
have received information on investment and operational costs. They have also
provided us with an updated version of the cost-benefit analysis of the Madrid –
Barcelona – French border high-speed train. RENFE‟s data request was made
through the Ministerio de Fomento. They have provided information on
passenger‟s demand, rolling stock investment and operating costs.
Table 4 summarises the data we have received along with the respective source.
Economic analysis
To capture the uncertainty about future benefits, we have considered a Low case
and a High case. These two scenarios use different assumptions regarding the
traffic growth on the services using the new rail line, from 2009 onwards. Table
5 shows the assumptions on passengers‟ growth used in each case.
We have calculated the economic indicators (NPV, IRR and BCR) covering the
LAV between Madrid and Barcelona and using a 5.5% discount rate. We have
used 2008 as the base year, following the choice of that as base year in the 2009
ADIF analysis. Table 6 summarises the results of the ex post analysis under both
scenarios. In both cases, the NPV of the project is negative. Correspondingly the
benefit-cost ratios are below 1, indicating that the project‟s costs have exceeded
its benefits.
Annexe 1 provides the detailed results of the cost benefit analysis for each
option, following the structure used in the 2008 EC Guide. The values in these
figures are non-discounted and are expressed in 2008 prices.
Financial analysis
We have done an ex post financial analysis for the whole project, calculating the
annual cash flows related to the new rail services using the infrastructure. Table
7 summarises the results of the ex post financial analysis. We have used a 5%
discount rate.
1.2.2 Costs
We have grouped costs into two different categories.
One-off costs. These costs include the capital investment costs incurred by
the network operator (ADIF) to build the infrastructures and the rolling
stock costs incurred by the railway operator (RENFE).
Ongoing costs. The costs including the operational and maintenance costs
incurred by ADIF and RENFE on annual basis.
One-off costs
ADIF provided us with the nominal value of the capital investments for the LAV
Madrid – Barcelona. We have used IMF inflation and exchange rate data to
convert these nominal figures into figures into 2008 Euros.
Figure 5 shows the evolution of capital expenditure over time. Expenditures
started in 1997 and peaked up in 2001, just before the Madrid – Lleida section
was finished. Investment costs decreased substantially from 2009, once the
whole Madrid – Barcelona section was opened.
1,800
1,600
1,400
1,200
Million Euros
1,000
800
600
400
200
0
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Source: ADIF
We assume that ADIF will not incur any further capital costs as the Madrid –
Barcelona segment is completed. We also assume that without this project ADIF
would have not incurred any additional capital cost in the railway line between
Madrid and Barcelona.
Rolling stock costs have been estimated using information available in the 2009
ADIF analysis. Specifically, that document provides information related to the
number of initial trains bought by RENFE to operate a certain rail service on the
LAV, and the additional trains expected to the bought in the following 30 years.
In the absence of information on when these additional trains will be acquired,
we have evenly spread the acquisition of these trains along a 30 years period. In
order to calculate the residual value of the rolling stock, we have used the
approach followed in the ex ante CBA, where it is assumed that annual rolling
stock depreciation is 11.29%. As it can be observed in Figure 6, investment
costs peaked in 2008 when whole Madrid – Barcelona line became operational.
The chart also shows the residual value of the rolling stock in 2033. As the chart
shows costs, the residual value is shown as a negative value.
600,000
500,000
400,000
Thousand Euros
300,000
200,000
100,000
0
2003 2006 2009 2012 2015 2018 2021 2024 2027 2030 2033
-100,000
-200,000
-300,000
Non-discounted
Source: ADIF
Ongoing costs
Both ADIF and RENFE incur ongoing costs.
ADIF‟s ongoing costs include infrastructure maintenance and other general
costs. The 2009 ADIF analysis provides the level of cost differences between the
scenario with the new infrastructure and the counterfactual for the period 2004
to 2012. We have assumed that after 2012, these cost differences remain
constant in real terms. This is because ADIF‟s ongoing costs are based on the
number of stations and the number of kilometres of high speed rail line, and
these are remain constant in the LAV Madrid – Barcelona after 2012.
RENFE‟s ongoing costs can be separated into two groups. The first include
those that depend on the number of passengers on the line. We have assumed
that these costs will grow over time in the same proportion as the number of
passengers. The second group includes those costs that are unrelated to the
number of passengers on the line, but are proportional to the infrastructure size.
We have assumed that after 2012 later costs remain constant in real terms.
Traffic volumes
RENFE provided us with passenger data related to all rail services using the LAV
Madrid – Barcelona and corresponding to years 2008 and 2009. These services
use the LAV Madrid – Barcelona either exclusively or partially. Rail services that
use the LAV exclusively are those between two destinations located along the
LAV. Services in this category include the AVE Madrid – Zaragoza/Barcelona
and the regional service AVMD Lleida – Barcelona. Rail services that use the
LAV partially are those that combine segments of the LAV and other rail
segments. Services in this category include, among others, the AVE Barcelona –
Málaga or the ALVIA Madrid – Pamplona. We obtained passenger data for 19
different rail services using the new high speed line, with the AVE Madrid –
Zaragoza/Barcelona service accounting for around two thirds of the total
number of passengers.
For the rail services that use the LAV Madrid – Barcelona partially, we have
obtained passenger data corresponding to the high speed segment of the service.
For these rail services, we use distance and time parameters corresponding to the
LAV segment. For example the rail service between Barcelona and Bilbao, we
only consider the distance and travel times corresponding to the Zaragoza –
Barcelona segment. We assume that travel times outside the LAV are unchanged.
The 2009 ADIF analysis provides information regarding the origins and
destinations of passengers using the new or improved services on the LAV. For
example, it reports that just over 50% of the passengers going from Madrid to
Barcelona, and vice versa, on the new AVE service used the plane before the
AVE service became operational; 18% used the train, 18% used the car and 4%
used the bus. The remaining 10% of current AVE passengers in this segment are
new passengers that were not travelling before.
ADIF provides this information for all geographical segments covering the
services that use the new rail line. Taking this modal shift information for all
services using the new rail line, we have calculated the average modal shift of
each transport mode and the percentage of induced passengers on the line.
Table 9 shows this average modal shift for all the services operating on the LAV
Madrid - Barcelona
Combining historical passenger data from RENFE and modal shift information
from ADIF, we have estimated, for the years 2008 and 2009, the number of
passengers in each segment of the new line, the distance travelled by each group,
the transport mode used before the opening of the new line and the duration of
the journey before and after the opening of the line.
We have considered the LAV as a new mode of transport. We have then treated
all passengers as new, except those who were already using the old rail service.
Accordingly, the „rule of half‟ (discussed in Annexe 2) has been applied to all
passengers except those already using the old rail previous to the LAV.
We have not received estimated future passenger numbers from either RENFE
or ADIF. Therefore, we have used the estimated future passenger-related
benefits and costs induced by the LAV Madrid – Barcelona for the years 2008
and 2009 and applied them to the 2009 ADIF analysis to estimate future
passengers of rail services on the line. The annual growth rates of these benefits
and costs are shown in Table 10, for the period 2016 to 2033. Information
included in the 2009 ADIF analysis for the years until 2015 are less relevant for
our analysis as growth rates in these years are strongly influenced by the opening
of the line from Barcelona-Sants station to the French border, a section we do
not analyse in this exercise.
Using these estimated growth rates we have build our High and Low case
scenarios. Both scenarios assume three different growth rates of passengers for
the short, medium and long-run. Assumed growth rates of passengers for the
HIGH and LOW case are shown in previous Table 5.
We have not received data from RENFE corresponding to the years 2004 to
2007, when the LAV Madrid - Barcelona was only partially open, between
Madrid and Lleida until the end of 2006 and further extension to Tarragona in
2007. The 2009 ADIF analysis reports the benefits, related to time savings,
vehicle operating costs savings, accidents and externalities, corresponding to
these earlier years. Using the previous approach to estimate future passenger on
the line, we have used the growth rates of benefits and costs in these earlier years
to approximate the number of passengers on the line between 2004 and 2007,
and calculate the associated benefits. Should RENFE provide actual data on
outturn passenger numbers for the years 2004-2009 within the timeframe of this
study, we will update the analysis accordingly in later drafts of this report.
Time savings
Time saving benefits are given by the total number of minutes saved with the
new infrastructure. Door–to–door journey times, including travel time plus
access and waiting time at stations/airports, for different modes of transport and
different segments have been obtained from the 2009 analysis by ADIF and from
RENFE‟s web page. Access and waiting time is nil for car, while for bus and
train ranges from 30 to 50 minutes, and for plane from 130 to 140 minutes.
Using information on modal shifters from the 2009 ADIF analysis, we have
estimated total minutes saved. Table 11 provides examples of door-to-door
journey times for different transport modes for different segments on the line.
High-speed
Route Car Bus Air Trad. rail
rail
According to the 2009 ADIF analysis, the monetary value of time depends on the
purpose of the journey. In that sense, business journey time would have a value
of 17.21 EUR/hour and leisure journey time a value of 7.41 EUR/hour. The
ADIF analysis also provides information on the percentage of business vs. leisure
journey by transport mode and segment on the rail services using the LAV. With
this information, we have calculated a weighted average monetary value of time
of 13.19 EUR/hour for passengers travelling from Madrid to Barcelona, and vice
versa, and a value of 12.92 EUR/hour for all other segments on the line.
Table 12. Vehicle operating cost savings of rail with respect to other transport modes
(EUR/passenger-km, 2008 prices)
Source: ADIF
Revenues
RENFE provided tariff revenues for the years 2008 and 2009. As before, we
have calculated future revenues, and revenues corresponding to years 2004 to
207, using an estimated number of passengers and assuming that real tariffs
remain constant. These figures are calculated as net revenues, as we have also
taken into account the (transport and infrastructure) operators‟ lost revenue from
passengers moving form car, bus and airplane to the rail services offered on the
LAV.
1.2.4 Externalities
Safety
The 2009 ADIF analysis calculated the benefits from the reduced number of
accidents on rail transport if compared with either car or bus. The analysis
provided us with the parameter values related to the cost of accidents. Unit costs
associated to the four modes of transport considered are shown in Table 13. As
rail transportation is slightly less safe than air transport, there is a cost associated
with modal shift away from air travel.
We have calculated the social benefits generated by modal shift switching to safer
modes of transport using the information on passengers in 2008 and 2009
provided by RENFE and modal shifting patterns provided by ADIF. As
mentioned before, for years between 2010 and 2033 and between 2004 and 2007,
we have calculated accident savings using an estimated number of passengers.
Table 13. Social costs of accidents associated to different transport modes (EUR/1000
passenger-km, 2008 prices)
Rail
Car Bus (trad. and Air
high-speed)
Source: ADIF
Environmental
We consider the environmental impact of the new infrastructure by calculating
the social benefits generated by people switching to high-speed rail services,
considered to be a more environmentally friendly mode of transport than car,
bus or air. In order to calculate the environmental benefits generated by the new
infrastructure we have followed a similar approach to the 2009 ADIF analysis.
Environmental social benefits induced by rail transportation can be subdivided in
four different components, pollution, climate change effects, nature and visual
effects, and urban effects. The 2009 ADIF analysis provides parameter values
for unit benefits related to environmental externalities. Table 14 present these
parameters.
Table 14. Environmental cost savings of rail with respect to other transport modes
(EUR/1000 passenger-km, 2008 prices)
Source: ADIF
Impact channels
The build up of HST infrastructure and start of rail service operations can
influence the local socio-economic structures through different channels. Table
15 summarises what is known in the literature about the main wider socio-
economic effects of the HST. The HST can influence mobility and accessibility,
socio-economic structures (especially tourism and market expansion), the image
of urban centres and spatial changes, both urban transformation and urban
planning.
Table 15. Socioeconomic and land-use impacts influenced by the High Speed Train
Specific
Impact area What we know
impacts
Specific
Impact area What we know
impacts
3.2 Local Cities take the opportunity of becoming part of the HST
marketing network to initiate or adapt urban image campaigns
intended to improve their attractiveness and promote the
campaigns
local economy.
Timeframe
Figure 7 summarises the dynamic sequence of the HST impacts. The immediate
short-term impact relates to the construction of the HST infrastructure and the
changes in the urban image in the cities linked by the new HST infrastructure.
The rest of the socio-economic impacts via multiplier effects materialise in the
medium and long terms. Increased mobility and accessibility to urban centres can
change land use patterns and facilitate the expansion of labour markets, for
example. These long term impacts are the result of multiple interrelationships
with other socio-economic phenomena (e.g. urban growth, population dynamics,
planning policies, etc.) which makes it difficult to attribute any of those impacts
exclusively to the HST. The French experience with HST infrastructure suggests
The LAV Madrid – Zaragoza – Barcelona has the potential to produce several
wider effects related to passenger‟s mobility, general image of the cities, socio-
economics and spatial changes. We summarise these wider economic effects
below.
Mobility effects
The number of passengers using the LAV Madrid – Zaragoza – Barcelona has
experienced a significant increase since the start of operations. According to
RENFE, in 2008 around 2.5 million passengers used the AVE service between
Madrid – Barcelona exclusively. In 2009 this number increased to around 3
million.
This substantial increase in the number of passengers is also a consequence of
changes in the modal distribution of transports. For example, for the route
between Madrid and Barcelona, before the AVE service was opened, the train
had a market share of 11.8%. Figures for the first semester of 2009 suggest that
this market share has increased to 48.6%.
A survey carried out by RENFE in October 2009 shows the following average
traveler profile: middle age (from 30 to 44 years), with high levels of education
(57% have university degrees or postgraduate or doctoral studies), 48% are
Socio-economic effects
The HST is seen as an instrument to improve the accessibility of cities and
regions connected to the network. Several studies suggest that accessibility gains
would be higher for medium and small cities (Zaragoza and Lleida) than for
bigger cities (Madrid and Barcelona) because some activities would be reallocated
to these smaller cities. These activities would include activities related to urban
tourism, conference tourism, scientific meetings, and business meeting; and the
relocation of specialized businesses and technical consultancy firms to take
advantage of lower labour costs and availability of skilled labour while keeping
good accessibility to Madrid and/or Barcelona.
New activities
The TAV Madrid – Zaragoza - Barcelona has been running since February 2008.
Thus, it is too early to assess any lasting economic impact caused by the HST on
the two major cities. However, in the case of Zaragoza and Lleida, which have
had HST services since 2003, it is possible to establish a relationship between
some local economic revitalization projects and the HST.
1. Zaragoza: logistics, international events and business land. The arrival of the
LAV was exploited as a tool to develop local socio-economic plans (Plan estratégico
de la ciudad y su entorno –Ebropolis, 1998). The objective was to carry out a thorough
urban and socio-economic transformation of the city of Zaragoza. The
implementation of the infrastructure was accompanied by other important
projects: the 2008 International Exhibition about Water and the consolidation of
PLAZA, a logistics platform.
2. Lleida: the LAV and the technology park. The Agribusiness Science and
Technology Park (Parque Científico y Tecnológico Agroalimentario de Lleida – PCiTAL)
was created in 2005 as a consortium between the University of Lleida and the
Lleida City Council. It was established with the intention of becoming a major
scientific and technological platform in the agribusiness industry in Spain.
Image effects
In terms of image transformation as a consequence of the LAV Madrid –
Barcelona, Zaragoza and Lleida are probably the two Spanish cities that have
benefited the most, even more than Madrid and Barcelona.
In the case of Zaragoza, the arrival of the LAV was used as an instrument
(together with the Expo in 2008 and the logistic platform, PLAZA) to promote
an ambitious urban and socio-economic transformation of the city. According to
a survey by the Employer‟s Confederation of Zaragoza, 91.2% of respondents
believe that the image of the city has improved with the LAV.
In the case of Lleida, a year before the arrival of the LAV, the local Chamber of
Commerce and Lleida City Council released a strategic plan, Plan de Dinamización
del tren de alta velocidad, intended to promote the city as a touristic gateway. Some
of the measures considered in the plan are currently being developed. Also a
marketing campaign was released to reinforce the image of the city of Lleida.
Spatial effects
In Madrid and Barcelona, the implementation of the LAV will have the effect of
converting high-speed train stations into intermodal hubs. For example, the
future Sagrera project will mean an intense process of renewal of the Sant Andreu
district in the north of the city of Barcelona. The Barcelona-Sagrera or Sagrera-
TAV will probably become the most important railway station of Catalonia, the
largest in Spain to international destinations, and the second largets in terms of
national routes.
In Madrid, the project called Operación Chamartin, can easily become one of the
largest urban renewal operations in Europe. It was approved in late 2009 and will
impact over 3 million square meters to be completed in 2023.
The LAV Madrid – Zaragoza – Barcelona has produced the following spatial
effects:
Reinforcement of the two national metropolises, Madrid and Barcelona.
Strengthening Madrid – Barcelona metropolitan dynamics through a
high-speed corridor:
Intensification of the metropolitan dynamics with nearby cities (30
minutes travel time) as Madrid – Guadalajara and Barcelona –
Camps de Tarragona
Inclusion to the metropolitan dynamics of close cities (60 minutes
travel time) as Barcelona – Lleida
Repositioning of large and medium size cities: Zaragoza and Lleida.
Utilisation rates
As requested by the TORs, we have considered the evolution of the utilisation
rates of this project. We have calculated these rates for the last two years, using
the passenger data related to the rail services using the LAV Madrid – Barcelona
provided by RENFE.
Table 16 shows for the years 2008 and 2009 the maximum capacity available in
passenger-kilometre on the services being provided, the total amount of
passenger-kilometre and the resulting capacity utilisation, equal to 61% in 2008
and 57% in 2009. The contribution to this indicator by the high-speed rail
services using exclusively the LAV Madrid-Barcelona, for example the AVE
Madrid – Barcelona, is equal to 79% in 2008 and 67% in 2009. As mentioned
before, there are other rail services using the LAV Madrid-Barcelona. These
correspond to (i) high-speed rail services using the LAV Madrid-Barcelona and
other LAVs, for example the AVE services between Barcelona and Sevilla; and
(ii) rail services using the LAV and other Iberian standard rail segments, for
example the ALVIA service between Barcelona and Bilbao.
Table 16. Utilisation rates on the LAV Madrid - Barcelona (2008 and 2009)
2008 2009
Economic analysis
The ex ante CBA prepared by INECO in 2001, and used to prepare most of
applications for funding, considers only the option implemented. It assesses it
against a counterfactual where the existing rail line is maintained. INECO
considers a 29-year period for the analysis and assumes that the Madrid – Lleida
section would open in 2003 and the Lleida – Figueres section in 2006.
The CBA report presents the results of the calculations of benefits and costs for
each year of the appraisal period. The CBA distinguishes between economic
analysis (Evaluación económica) and social analysis (Evaluación social), the latter
includes positive externalities environmental benefits and employment
generation. For both analyses, the report shows the Net Present Value, the
economic rate of return and the benefit-investment ratios. INECO calculates the
NPV of the project using a 6% discount rate. Table 17 shows the results.
Instead of producing the benefit-cost ratio of the project, the ex ante cost benefit
analysis reports the benefit-investment ratio. This ratio is not directly
comparable with the ex post BCR, used in the other projcts under analysis.
Table 17. Results of ex ante cost benefit analysis for the whole line
Source: INECO Report, “Rentabilidad de la Línea Madrid – Barcelona – Figueres”, May 2001
Financial analysis
The ex ante CBA shows a separate financial analysis for the infrastructure
operator (ADIF) and for the railway operators. For this matter, access charges to
be paid to the infrastructure manager are calculated in such a way that the railway
operators‟ profitability is 9%. Table 18 presents the results of the financial
analysis for the whole line. INECO calculated the financial NPV using a 6%
discount rate.
Table 18. Results of ex ante cost benefit analysis for the whole line
Infrastructure
-7,946.17 -3.82% 0.01
manager
Railway
309.41 9.00% 1.6
operators
Source: INECO Report, “Rentabilidad de la Línea Madrid – Barcelona – Figueres”, May 2001
Demand analysis
The ex ante CBA considers not only the number of “direct” passengers (i.e.
passengers going from Madrid / Zaragoza / Lleida / Tarragona / Barcelona to
Madrid / Zaragoza / Lleida / Tarragona / Barcelona) travelling in high–speed
trains (max. speed 350 km/h) but also “indirect” passengers (i.e. passengers
travelling in routes that use part of the LAV Madrid – Barcelona – French border
rail) travelling in TALGO trains (max. speed 220 km/h). Both national and
international demand is considered.
For national demand three types of services are included: “long-haul internal
relations”, “long-haul external relations” and “regional relations”. Table 19
shows the correspondent routes.
For international demand routes taken into account are those with origin in
Cataluña, Centre-North of Spain, and South of Spain and with destination
France, England, Benelux, Germany, Switzerland, Italy, and others.
Long-haul internal
Long-haul external Regional relations
relations (High–speed
relations (TALGO trains) (TALGO trains)
trains)
Vallés to Girona /
Figueres
Barcelona to Girona /
Figueres
Girona to Figueres
Source: INECO Report, “Rentabilidad de la Línea Madrid – Barcelona – Figueres”, May 2001
The second analysis concentrates on the railway operators. The analysis considers
different investment cost and demand scenarios. Because the operator‟s
profitability is fixed at 9%, the effect of the sensitivity analysis is only observed
on the ADIF‟s profitability. Table 20 presents the results. We note that in all
cases the NPV for ADIF is negative.
Table 20. Sensitivity analysis for the infrastructure manager (ADIF) and railway
operators (RO)
Source: INECO Report, “Rentabilidad de la Línea Madrid – Barcelona – Figueres”, May 2001
results are obtained considering the 1997–2024 period for the analysis while we
consider the 1997-2033 period.
Table 21 compares the results of the ex ante economic analysis carried out by
INECO for the whole infrastructure with our results of the ex post CBA for the
LAV Madrid – Barcelona. Ex ante figures have recalculated these series using a
common base year, 2008, and the discount factor suggested by the EC Guide to
Cost-Benefits Analysis (5.5%). The original ex ante economic analysis used 2005
as the base year and a discount factor equal to 6%.
Table 21. Comparison of ex ante and ex post economic and social CBA (2008 prices)
Net Present
1,091 4,125 -2,736 -1,948
Value (€m)
Economic IRR
6.29% 8.92% 2.63% 3.70%
(%)
Benefit-cost
1.07 1.26 0.6 0.7
ratio
As shown above, the ex ante analysis carried out by INECO in the 2001 report
presents, for the whole LAV Madrid – Barcelona – French border, an IRR of
6.29% and 8.92% for the Economic analysis and Social analysis respectively. The
analysis completed by ADIF in 2009 also considers the whole LAV Madrid –
Barcelona – French border. ADIF reports an IRR of 2.23% and 6.06%
respectively.
Apart from the fact that the ex ante analysis and the ex post analysis do not
consider exactly the same infrastructure, there exist other difference between
INECO and our approach that we summarize below.
Traffic volumes
RENFE provided aggregate data on traffic volume for years 2008 and 2009, and
together with information modal shift information from ADIF we have
estimated the number of 2008 and 2009 passengers in each segment of the new
line. When comparing ex ante and ex post data it can be said that, overall, the
2001 ex ante analysis assumes higher traffic volume than the estimated for the ex
post analysis in 2008 and 2009.
As an example, Figure 8 shows the number of passengers in the ex ante and ex
post analysis for 2008, for a non-exhaustive number of segments considered in
the analysis. The chart shows that, with the exception of the Madrid – Barcelona
segment, the ex ante analysis assumed a higher number of passengers compared
with actual numbers.
3,200
2,800
2,400
Passengers ('1000s)
2,000
Ex ante
1,600
Ex post
1,200
800
400
0
Madrid - Madrid - Zaragoza - Tarragona - Lleida - Lleida - Zaragoza -
Barcelona Zaragoza Barcelona Barcelona Barcelona Tarragona Tarragona
Capital costs
Investment cost profiles are different in the ex ante and in the ex post analysis.
Even though they are not directly comparable because, as mentioned above, the
ex ante analysis includes the whole LAV Madrid – Barcelona – French border, ex
post figures provided by ADIF are overall higher, suggesting an overspend for
the entire infrastructure.
Figure 9 present capital costs profiles for the 2001 ex ante CBA and for our ex
post CBA.
1,800
1,500
1,200
Ex ante
900
Ex post
600
300
0
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
100%
5%
10%
6% 19%
6%
80%
9%
40% 18%
60%
72%
Enviromental
Accidents
40% Time
VOC
54%
45%
20%
18%
0%
EX ANTE EX POST ADIF 2009
Note: For the ex post case, average contribution is calculated taking the mean of the contribution in the
high case and in the low case scenario.
political criteria after which CBA is used to inform the economic feasibility
studies and to identify critical issues such as environmental impacts.
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
BENEFITS
Consumers Surplus
Time Benefits 0 0 0 0 0 0 0 5 5 7 8 66 86
Accidents 0 0 0 0 0 0 0 1 1 1 2 10 12
Vehicle Operating Costs 0 0 0 0 0 0 0 3 3 5 6 83 101
Externalities 0 0 0 0 0 0 0 1 1 1 1 19 23
Producer Surplus
Revenues 0 0 0 0 0 0 0 11.5 12.1 16.2 19.3 222.0 296.3
COSTS
Investment Costs
Track construction 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Rolling stock 0 0 0 0 0 0 0 6 6 6 6 52 58
TOTAL COSTS 166 256 688 940 1569 1471 895 814 764 708 526 452 181
NET BENEFITS -166 -256 -688 -940 -1569 -1471 -895 -793 -742 -678 -490 -52 337
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
BENEFITS
Consumers Surplus
Time Benefits 87 89 91 94 96 98 100 101 102 103 105 106 107
Accidents 13 13 13 14 14 14 15 15 15 15 15 16 16
Vehicle Operating Costs 106 108 111 114 117 120 121 123 124 126 127 129 131
Externalities 24 24 25 26 26 27 27 28 28 28 29 29 29
Producer Surplus
Revenues 300 307 315 323 331 339 343 348 352 357 361 365 370
TOTAL BENEFITS 529 542 556 570 584 599 606 614 621 629 637 645 653
COSTS
Investment Costs
Track construction 0 0 0 0 0 0 0 0 0 0 0 0 0
Rolling stock 61 61 61 61 61 61 61 61 61 61 61 61 61
0 0 0 0 0 0 0 0 0 0 0 0 0
Operating and maintenance costs 71 68 73 74 75 75 76 76 77 77 78 78 79
TOTAL COSTS 132 130 134 135 136 137 137 137 138 138 139 139 140
NET BENEFITS 397 413 422 435 448 462 469 476 484 491 498 506 513
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
BENEFITS
Consumers Surplus
Time Benefits 109 110 111 112 113 114 114 115 116 116 117
Accidents 16 16 16 16 17 17 17 17 17 17 17
Vehicle Operating Costs 132 134 136 136 137 138 139 140 141 142 142
Externalities 30 30 30 31 31 31 31 31 32 32 32
Producer Surplus
Revenues 375 0 0 0 0 0 0 0 0 0 0
TOTAL BENEFITS 287 290 294 296 297 299 301 303 305 307 309
COSTS
Investment Costs
Track construction 0 0 0 0 0 0 0 0 0 0 -2581
Rolling stock 61 61 61 61 61 61 61 61 61 61 61
TOTAL COSTS 140 141 141 141 142 142 142 142 143 143 -2438
NET BENEFITS 146 150 153 154 156 157 159 161 162 164 2746
Figure 12. High speed rail – Spain. Financial return on investment (€m, 2008 prices)
– Low case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Track construction 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Rolling stock 0 0 0 0 0 0 0 6 6 6 6 52 58
TOTAL INVESTMENT COSTS 166 256 688 940 1569 1471 877 749 703 649 448 379 107
CASH FLOW -166 -256 -688 -940 -1569 -1471 -895 -803 -752 -692 -506 -230 116
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
TOTAL REVENUES 300 307 315 323 331 339 343 348 352 357 361 365 370
Track construction 0 0 0 0 0 0 0 0 0 0 0 0 0
Rolling stock
TOTAL INVESTMENT COSTS 61 61 61 61 61 61 61 61 61 61 61 61 61
CASH FLOW 167 178 181 188 195 203 206 210 214 218 222 226 230
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
TOTAL REVENUES 375 379 384 386 389 391 394 396 399 401 404
CASH FLOW 234 239 243 245 247 249 252 254 256 258 2841
Figure 13. High speed rail – Spain. Financial return on capital (€m, 2008 prices) –
Low case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Local contribution
Regional contrintribution
National contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Total national public contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Operating and maintenance costs 0 0 0 0 0 0 18 65 61 58 78 74 74
Total Operating Costs 0 0 0 0 0 0 18 65 61 58 78 74 74
TOTAL FINANCIAL OUTFLOWS 100 154 415 568 948 888 548 514 483 447 345 271 103
NET CASH FLOW -100 -154 -415 -568 -948 -888 -548 -503 -471 -431 -325 -49 193
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Revenues 300 307 315 323 331 339 343 348 352 357 361 365 370
Residual values
TOTAL FINANCIAL INFLOWS 300 307 315 323 331 339 343 348 352 357 361 365 370
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Operating and maintenance costs 71 68 73 74 75 75 76 76 77 77 78 78 79
Total Operating Costs 71 68 73 74 75 75 76 76 77 77 78 78 79
TOTAL FINANCIAL OUTFLOWS 71 68 73 74 75 75 76 76 77 77 78 78 79
NET CASH FLOW 300 307 315 323 331 339 343 348 352 357 361 365 370
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Revenues 375 379 384 386 389 391 394 396 399 401 404
Residual values 2581
TOTAL FINANCIAL INFLOWS 375 379 384 386 389 391 394 396 399 401 2985
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0
Maintenance 79 80 80 80 81 81 81 81 82 82 82
Total Operating Costs 79 80 80 80 81 81 81 81 82 82 82
TOTAL FINANCIAL OUTFLOWS 79 80 80 80 81 81 81 81 82 82 82
NET CASH FLOW 296 300 304 306 308 311 313 315 317 319 2903
Figure 14. High speed rail – Spain. Financial sustainability (€m, 2008 prices) – Low
case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
EU Grant 66 101 272 372 621 582 347 295 276 255 175 129 19
Local contribution
Regional contrintribution
National contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Total national public contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Operating subsidies
FINANCIAL RESOURCES 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Passenger vehicles 0 0 0 0 0 0 0 11 12 16 19 222 296
TOTAL REVENUES 0 0 0 0 0 0 0 11 12 16 19 222 296
TOTAL INFLOWS 166 256 688 940 1569 1471 877 755 710 660 462 548 345
Track construction 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Rolling stock 0 0 0 0 0 0 0 6 6 6 6 52 58
TOTAL INVESTMENTS COSTS 166 256 688 940 1569 1471 877 749 703 649 448 379 107
Operating and maintenance costs 0 0 0 0 0 0 18 65 61 58 78 74 74
TOTAL OPERATING COSTS 0 0 0 0 0 0 18 65 61 58 78 74 74
TOTAL OUTFLOWS 166 256 688 940 1569 1471 895 814 764 708 526 452 181
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
EU Grant 0 0 0 0 0 0 0 0 0 0 0 0 0
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Operating subsidies
FINANCIAL RESOURCES 0 0 0 0 0 0 0 0 0 0 0 0 0
Passenger vehicles 300 307 315 323 331 339 343 348 352 357 361 365 370
TOTAL REVENUES 300 307 315 323 331 339 343 348 352 357 361 365 370
TOTAL INFLOWS 300 307 315 323 331 339 343 348 352 357 361 365 370
Track construction 0 0 0 0 0 0 0 0 0 0 0 0 0
Rolling stock 61 61 61 61 61 61 61 61 61 61 61 61 61
TOTAL INVESTMENTS COSTS 61 61 61 61 61 61 61 61 61 61 61 61 61
Operating and maintenance costs 71 68 73 74 75 75 76 76 77 77 78 78 79
TOTAL OPERATING COSTS 71 68 73 74 75 75 76 76 77 77 78 78 79
TOTAL OUTFLOWS 132 130 134 135 136 137 137 137 138 138 139 139 140
NET CASH FLOW 168 178 181 188 195 203 206 210 214 218 222 226 230
CUMULATED CASH FLOW 184 362 543 731 926 1129 1335 1546 1760 1978 2200 2427 2657
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
EU Grant 0 0 0 0 0 0 0 0 0 0 0
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0
Operating subsidies
FINANCIAL RESOURCES 0 0 0 0 0 0 0 0 0 0 0
Passenger vehicles 375 379 384 386 389 391 394 396 399 401 404
TOTAL REVENUES 375 379 384 386 389 391 394 396 399 401 404
TOTAL INFLOWS 375 379 384 386 389 391 394 396 399 401 404
Track construction 0 0 0 0 0 0 0 0 0 0 0
Rolling stock 61 61 61 61 61 61 61 61 61 61 61
TOTAL INVESTMENTS COSTS 61 61 61 61 61 61 61 61 61 61 61
Operating and maintenance costs 79 80 80 80 81 81 81 81 82 82 82
TOTAL OPERATING COSTS 79 80 80 80 81 81 81 81 82 82 82
TOTAL OUTFLOWS 140 141 141 141 142 142 142 142 143 143 143
NET CASH FLOW 234 239 243 245 247 249 252 254 256 258 261
CUMULATED CASH FLOW 2891 3130 3373 3618 3865 4115 4366 4620 4876 5135 5395
Figure 15. High speed rail – Spain. Economic analysis (€m, 2008 prices) – High case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
BENEFITS
Consumers Surplus
Time Benefits 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.9 5.2 6.8 7.9 66.4 85.7
Accidents 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.9 1.3 1.5 9.9 12.4
Vehicle Operating Costs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3 3.4 4.6 5.6 83.3 101.0
Externalities 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.7 1.0 1.2 18.7 22.8
Producer Surplus
Revenues 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11.5 12.1 16.2 19.3 222.0 292.5
TOTAL BENEFITS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21.2 22.4 29.8 35.5 400.3 514.3
COSTS
Investment Costs
Track construction 166.2 255.7 687.8 940.0 1568.7 1470.7 877.1 743.8 697.5 643.9 442.4 326.3 48.8
Rolling stock 0.0 0.0 0.0 0.0 0.0 0.0 0.0 57.8 0.0 20.8 0.0 491.7 38.9
Operating and maintenance costs 0.0 0.0 0.0 0.0 0.0 0.0 18.0 64.9 61.4 58.5 77.6 73.8 73.8
TOTAL COSTS 166.2 255.7 687.8 940.0 1568.7 1470.7 895.1 866.4 758.9 723.2 520.0 891.8 161.5
NET BENEFITS -166.2 -255.7 -687.8 -940.0 -1568.7 -1470.7 -895.1 -845.2 -736.5 -693.4 -484.5 -491.6 352.8
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
BENEFITS
Consumers Surplus
Time Benefits 89.1 93.6 98.3 103.2 108.4 113.8 116.6 119.5 122.5 125.6 128.7 131.9 135.2
Accidents 13.1 13.7 14.4 15.1 15.9 16.7 17.1 17.5 18.0 18.4 18.9 19.3 19.8
Vehicle Operating Costs 108.4 113.8 119.5 125.4 131.7 138.3 141.8 145.3 148.9 152.7 156.5 160.4 164.4
Externalities 24.4 25.6 26.9 28.2 29.6 31.1 31.9 32.7 33.5 34.3 35.2 36.1 37.0
Producer Surplus
Revenues 307.1 322.5 338.6 355.5 373.3 392.0 401.8 411.8 422.1 432.7 443.5 454.6 466.0
TOTAL BENEFITS 542.1 569.2 597.6 627.5 658.9 691.8 709.1 726.9 745.0 763.7 782.8 802.3 822.4
COSTS
Investment Costs
Track construction 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Rolling stock -5.7 8.3 35.0 168.8 -8.7 231.7 30.7 40.2 -3.0 -2.7 15.5 6.8 -3.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Operating and maintenance costs 71.2 68.4 72.9 74.6 76.2 78.0 79.0 79.9 80.9 81.9 83.0 84.0 85.1
TOTAL COSTS 65.6 76.8 107.9 243.3 67.5 309.7 109.7 120.1 77.9 79.2 98.5 90.8 82.1
NET BENEFITS 476.5 492.4 489.7 384.2 591.4 382.1 599.4 606.7 667.1 684.5 684.3 711.6 740.3
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
BENEFITS
Consumers Surplus
Time Benefits 138.6 142.1 145.6 147.5 149.3 151.2 153.1 155.0 156.9 158.9 160.9
Accidents 20.3 20.8 21.4 21.6 21.9 22.2 22.4 22.7 23.0 23.3 23.6
Vehicle Operating Costs 168.5 172.7 177.0 179.3 181.5 183.8 186.1 188.4 190.7 193.1 195.5
Externalities 37.9 38.8 39.8 40.3 40.8 41.3 41.8 42.3 42.9 43.4 44.0
Producer Surplus
Revenues 477.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL BENEFITS 365.3 374.5 383.8 388.6 393.5 398.4 403.4 408.4 413.5 418.7 423.9
COSTS
Investment Costs
Track construction 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -2580.8
Rolling stock 9.8 12.1 -3.0 -11.1 -5.7 14.9 18.2 57.2 0.0 -5.7 0.0
Operating and maintenance costs 86.2 87.4 88.5 89.1 89.7 90.3 91.0 91.6 92.2 92.9 93.5
TOTAL COSTS 96.0 99.4 85.5 78.0 84.0 105.3 109.1 148.8 92.2 87.1 -2487.3
NET BENEFITS 269.3 275.0 298.3 310.6 309.5 293.1 294.3 259.7 321.3 331.6 2911.2
Figure 16. High speed rail – Spain. Financial return on investment (€m, 2008 prices)
– High case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Track construction 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Rolling stock 0 0 0 0 0 0 0 58 0 21 0 492 39
TOTAL INVESTMENT COSTS 166 256 688 940 1569 1471 877 802 697 665 442 818 88
CASH FLOW -166 -256 -688 -940 -1569 -1471 -895 -855 -747 -707 -501 -670 131
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
TOTAL REVENUES 307 322 339 356 373 392 402 412 422 433 444 455 466
Track construction 0 0 0 0 0 0 0 0 0 0 0 0 0
Rolling stock
TOTAL INVESTMENT COSTS -6 8 35 169 -9 232 31 40 -3 -3 16 7 -3
CASH FLOW 242 246 231 112 306 82 292 292 344 354 345 364 384
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
TOTAL REVENUES 478 490 502 508 514 521 527 534 541 547 554
CASH FLOW 382 390 416 430 430 416 418 385 448 460 3042
Figure 17. High speed rail – Spain. Financial return on capital (€m, 2008 prices) –
High case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Local contribution
Regional contrintribution
National contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Total national public contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Operating and maintenance costs 0 0 0 0 0 0 18 65 61 58 78 74 74
Total Operating Costs 0 0 0 0 0 0 18 65 61 58 78 74 74
TOTAL FINANCIAL OUTFLOWS 100 154 415 568 948 888 548 514 483 447 345 271 103
NET CASH FLOW -100 -154 -415 -568 -948 -888 -548 -503 -471 -431 -325 -49 189
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Revenues 307 322 339 356 373 392 402 412 422 433 444 455 466
Residual values
TOTAL FINANCIAL INFLOWS 307 322 339 356 373 392 402 412 422 433 444 455 466
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Operating and maintenance costs 71 68 73 75 76 78 79 80 81 82 83 84 85
Total Operating Costs 71 68 73 75 76 78 79 80 81 82 83 84 85
TOTAL FINANCIAL OUTFLOWS 71 68 73 75 76 78 79 80 81 82 83 84 85
NET CASH FLOW 307 322 339 356 373 392 402 412 422 433 444 455 466
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Revenues 478 490 502 508 514 521 527 534 541 547 554
Residual values 2581
TOTAL FINANCIAL INFLOWS 478 490 502 508 514 521 527 534 541 547 3135
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0
Maintenance 86 87 89 89 90 90 91 92 92 93 94
Total Operating Costs 86 87 89 89 90 90 91 92 92 93 94
TOTAL FINANCIAL OUTFLOWS 86 87 89 89 90 90 91 92 92 93 94
NET CASH FLOW 391 402 413 419 425 430 436 442 448 454 3042
Figure 18. High speed rail – Spain. Financial sustainability (€m, 2008 prices) – High
case
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
EU Grant 66 101 272 372 621 582 347 295 276 255 175 129 19
Local contribution
Regional contrintribution
National contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Total national public contribution 100 154 415 568 948 888 530 449 421 389 267 197 29
Operating subsidies
FINANCIAL RESOURCES 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Passenger vehicles 0 0 0 0 0 0 0 11 12 16 19 222 293
TOTAL REVENUES 0 0 0 0 0 0 0 11 12 16 19 222 293
TOTAL INFLOWS 166 256 688 940 1569 1471 877 755 710 660 462 548 341
Track construction 166 256 688 940 1569 1471 877 744 697 644 442 326 49
Rolling stock 0 0 0 0 0 0 0 58 0 21 0 492 39
TOTAL INVESTMENTS COSTS 166 256 688 940 1569 1471 877 802 697 665 442 818 88
Operating and maintenance costs 0 0 0 0 0 0 18 65 61 58 78 74 74
TOTAL OPERATING COSTS 0 0 0 0 0 0 18 65 61 58 78 74 74
TOTAL OUTFLOWS 166 256 688 940 1569 1471 895 866 759 723 520 892 161
NET CASH FLOW 0 0 0 0 0 0 -18 -111 -49 -63 -58 -344 180
CUMULATED CASH FLOW 0 0 0 0 0 0 -18 -129 -179 -242 -300 -643 -464
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
EU Grant 0 0 0 0 0 0 0 0 0 0 0 0 0
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0 0 0
Operating subsidies
FINANCIAL RESOURCES 0 0 0 0 0 0 0 0 0 0 0 0 0
Passenger vehicles 307 322 339 356 373 392 402 412 422 433 444 455 466
TOTAL REVENUES 307 322 339 356 373 392 402 412 422 433 444 455 466
TOTAL INFLOWS 307 322 339 356 373 392 402 412 422 433 444 455 466
Track construction 0 0 0 0 0 0 0 0 0 0 0 0 0
Rolling stock -6 8 35 169 -9 232 31 40 -3 -3 16 7 -3
TOTAL INVESTMENTS COSTS -6 8 35 169 -9 232 31 40 -3 -3 16 7 -3
Operating and maintenance costs 71 68 73 75 76 78 79 80 81 82 83 84 85
TOTAL OPERATING COSTS 71 68 73 75 76 78 79 80 81 82 83 84 85
TOTAL OUTFLOWS 66 77 108 243 68 310 110 120 78 79 98 91 82
NET CASH FLOW 242 246 231 112 306 82 292 292 344 354 345 364 384
CUMULATED CASH FLOW -222 24 254 367 673 755 1047 1339 1683 2036 2381 2745 3129
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
EU Grant 0 0 0 0 0 0 0 0 0 0 0
Local contribution
Regional contrintribution
National contribution 0 0 0 0 0 0 0 0 0 0 0
Total national public contribution 0 0 0 0 0 0 0 0 0 0 0
Operating subsidies
FINANCIAL RESOURCES 0 0 0 0 0 0 0 0 0 0 0
Passenger vehicles 478 490 502 508 514 521 527 534 541 547 554
TOTAL REVENUES 478 490 502 508 514 521 527 534 541 547 554
TOTAL INFLOWS 478 490 502 508 514 521 527 534 541 547 554
Track construction 0 0 0 0 0 0 0 0 0 0 0
Rolling stock 10 12 -3 -11 -6 15 18 57 0 -6 0
TOTAL INVESTMENTS COSTS 10 12 -3 -11 -6 15 18 57 0 -6 0
Operating and maintenance costs 86 87 89 89 90 90 91 92 92 93 94
TOTAL OPERATING COSTS 86 87 89 89 90 90 91 92 92 93 94
TOTAL OUTFLOWS 96 99 86 78 84 105 109 149 92 87 94
NET CASH FLOW 382 390 416 430 430 416 418 385 448 460 461
CUMULATED CASH FLOW 3511 3901 4317 4747 5177 5593 6011 6396 6845 7305 7766