PH12 3G 10 40 T001 - RB1
PH12 3G 10 40 T001 - RB1
BE STRICTLY IN ACCORDANCE
WITH THE REQUIREMENTS OF THE PHASE-12
CONTRACT
C
B1 _ 7/12/2016 Re-issued for Construction ar per DTA-16-4205 MV DMK RLG
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
COVER SHEET 1
LIST OF CONTENTS 2
INTRODUCTION PAGE 4
2 GENERAL 5
2.9 FIREWALL 10
3.1 GENERAL 12
3.7 COMMUNICATIONS 15
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 3 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
4 BCU SOFTWARE 20
4.2 CAPABILITY 20
5 GATEWAY SOFTWARE 23
7 GPS RECEIVER 25
8 LAPTOP 25
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 4 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
SECTION 3.4.10
VOLUME 4 SECTION 3.4.10 PAGE 5 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
2. General
2.1.6. Processor
- Supportable/expandable GB 32GB
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 6 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
110,000 hours @
35 °C
2.2.1. Software supplied (Attach a list of software other than Required SICAM PAS
operating systems to be installed)
2.2.2. Remote Access of Server through KVM Switches Yes Yes
2.3.2. Dual LAN ports for Control Centre Communication Yes Yes
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 7 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
2.3.4. Software supplied (Attach a list of software other than Required SICAM PAS
operating systems to be installed)
2.3.5. Remote Access of Server through KVM Switches Yes Yes
2.4.7. LAN Interface for Remote Access from Control Center Yes Yes
2.4.8. LAN Interface for PMR files uploading to Control Center Yes Yes
2.5.4. Placing of the Industrial Computer with Suitable Ventilation Yes Yes
2.5.7. Provision for Routing Communication Cables & Power Cables Yes Yes
Manufacturer Knurr
- Number No 2 2
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 8 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
2.7.3. Transmission medium (e.g. optical fiber) and physical Optical Optical
specification
2.7.4. Protocols
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 9 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
Type of Ports -
LC/ST/RJ45
- % of spare for each type of port % 20 % 20 %
2.7.8. Management software package, functions and facilities, etc. Yes Yes
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 10 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
Type of Ports -
LC/ST/RJ45
2.8.19. LAN configuration to support availability and failure scenario Yes Yes
to be specified.
2.8.20. Type test
2.9. Firewall
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 11 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
2.9.11. Real time violation alarms & Rules (IPS/IDS) Yes Yes
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 12 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
2.10.17. Functions
3.1. General
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 13 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 14 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
3.3.3. Date of Type test certificate by independent LAB Not older than 5 Yes
years
3.4. BCU Functions
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 15 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
3.5.5. LCD Display and selector Buttons on front of BCU Yes Yes
Functionality to include
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
3.7.11. Number and type of communication ports No 2 Channels (FO 2x LC-FO ports for
port) 61850
3.7.12. Meantime between failure h NA
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 17 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
module: 3W
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 18 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
3.10.12. Are the outputs fused and fuse status monitored? Yes
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 19 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 20 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
4. BCU Software
4.2. Capability
4.2.1. BCU program downloading from HMI/Control Centre Yes Through HWS on
LAN
4.2.2. Application configuration from HMI/Control Centre Yes Through HWS on
LAN
4.2.3. Remote selection of processing parameters On demand
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 21 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
4.3.5. Testing and Diagnostics Programs Functions and capabilities Yes Yes
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
Chatter blocking
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
5. Gateway Software
5.1.7. Alarm and Event Separation for NCC and DCC Yes
5.1.8. Alarm and Event storage and remote / local access Yes
5.1.9. All IEDs (including Third Party) can be interfaced on Yes Yes
IEC61850 Protocol
5.1.10. IEC 61850/IEC 60870-5-101/IEC60870-5-104 Logging Yes
Facility
5.2. Capability of:
5.3.1. Operating System (Monitor) Functions and capabilities Yes, Part of FDS
5.3.3. Time Synchronization Program Functions and capabilities Yes, Part of FDS
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 24 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
5.3.4. Data Base Updating program Functions and capabilities Yes, Part of FDS
5.3.5. Testing and Diagnostics Programs Functions and capabilities Yes, Part of FDS
6.2. No. of IEDs Software can handle No Yes Max. 450 Via
PAS Server
6.3. No. of Tags Software can handle No Yes Max. 65536 Via
PAS Server
6.4. Software has provision for future IEDs. % 20% spare is
available for future
use
6.5. No. of Spare tags for future use % 20% spare is
available for future
use
6.6. Status updating Time Yes Yes
6.12. Alarm list, Event, reports and Trends with filter option. Yes Yes
6.15. Export of Events, Graphical trends and Reports in PDF Yes Yes
format
6.16. Online modification and DB generation Yes Yes
Modification of
screens/Texts is
possible
6.17. Monitoring healthiness of all components of SCS Yes By monitoring port
including the LAN cables status and SNMP
Signals
6.18. Monitoring Healthiness of ports in Ethernet Switches, Yes Yes
GPS ,Router, etc
6.19. Remote end bay details in SCS Yes Yes
6.23. Third Party IED interfaces on IEC 61850 Protocol. Yes Yes
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 25 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
7. GPS Receiver
8. Laptop
8.1.4. Processor
- Supportable/expandable GB 32GB
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 26 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
VOLUME 4 SECTION 3.4.10 PAGE 27 OF 27
GTC/643G/2014
QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE 12 – SUBSTATIONS
_1.DOCX
SECTION 3.4.10 SUBSTATION CONTROL SYSTEM
TECHNICAL AFFAIRS
Electrical Projects Dept.
Software List
Station Server
Windows 7 Operating System Professional
SICAM PAS "full Server" Software – Runtime
License OPC Client
License CFC Automation
License - IEC 61850 (Client)
Teaming Utility Software
Trend Micro Office Scan Client
Gateway
Windows 7 Operating System Professional
SICAM PAS "full Server" Software – Runtime
License OPC Client
License CFC Automation
License - IEC 61850 (Client)
License - IEC 104 (Slave)
Teaming Utility Software
Trend Micro Office Scan Client
HWS PC
Windows 7 Operating System Professional
SICAM SCC
SIMATIC Win CC System Software
Teaming Utility Software
PDF Writer
Trend Micro Office Scan Client
EPC/HMI
Windows 7 Operating System Professional
Trend Micro Office Scan Server
SICAM SCC
SIMATIC Win CC System Software
Teaming Utility Software
PDF Writer
Microsoft Office
SICAM PAS Configuration Tool
Incident Explorer for Evaluation of Fault records
Watch Directory - Professional
Firewall Software
Digsi
ABB PCM600, if applicable
ALSTOM MICOM S1 Agile
SCHNEIDER MiCOM S1 Studio
AVR Software
Net view
WinZip
Unrestricted