Boiler 1 Boiler 2 ESP Switchyard: DAILY QC-Mech Report Dated: Sr. Steel Structure Erected Welded Joints UT Remarks

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

DAILY QC- Mech Report Dated:

Sr. Steel Structure Erected Welded Joints UT Remarks

Boiler 1
Boiler 2
ESP
Switchyard

Boiler No. of Joint Welded RT Repair


Boiler 1
Boiler 2

Demin Water Storage No. of Joint Welded RT Repair

WQT Conducted
Welder Qualified
Welder Rejected