REPUBLIC OF THE PHILIPPINES

TABLE OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL

OF
CONTENTS
DISTRICT/CITY/MUNICIPALITY

LAND USE & ZONING


ARCHITECTURAL

A-1 PERSPECTIVE VIEW & TABLE OF CONTENTS

A-2 GROUND FLOOR PLAN SECOND FLOOR PLAN

A-3 THIRD FLOOR & ROOF PLAN

A-4 FRONT, RIGHT, REAR & LEFT ELEVATION

A-5 LOGITUDINAL & CROSS SECTION, REFLECTED


CEILING

A-6 SCHED. OF DOORS & WINDOWS RAMP DETAILS,


EAVES DETAIL, SUNBREAKER DETAIL DAMP LINE & GRADE
PROOFING DETAIL, BALCONY RAILING DET.

A-7 STAIR & HANDRAIL DETAIL

A-8 TOILETS DETAIL

ARCHITECTURAL

1 PERSPECTIVE VIEW STRUCTURAL


S-1 FOUNDATION, 2ND&3RD FLR FRAMING PLAN
A-1 SCALE : N T S
SCHEDULE AND ELEVATION OF COLUMN

S-2 ROOF FRAMING,SCHED OF SLAB&FOOTING DET STRUCTURAL


OF TIE BEAM,STAIR ON GRADE&RAMP

S-3 GROUND & SECOND FLOOR


LIGHTING LAYOUT

E-4 THIRD FLOOR LIGHTING & POWER


LAYOUT

SANITARY

ELECTRICAL
E-1 GENERAL NOTES, SINGLE LINE DIAGRAM, LOAD
SCHEDULE, LEGEND, RISER DIAGRAM

E-2 GROUND & SECOND FLOOR POWER LAYOUT

E-3 SCHEDULE OF BEAMS/GIRDERS


DETAIL OF STAIR

S-4 TRUSS DIAGRAM DETAILS OF STEEL ELECTRICAL


CONNECTION

SANITARY
P-1 ROOF DRAIN LAYOUT , PLUMBING
RO-IN LAYOUT

P-2 ISOMETRIC VIEW

P-3 SEPTIC TANK, CATCH BASIN & COVER MECHANICAL


DETAIL, LEGEND, NOTES & DESIGN
CRITERIA

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-1
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
TABLE OF CONTENTS
27 OCT. 2002 PERSPECTIVE VIEW, TABLE OF CONTENTS
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


SCHEDULE OF FINISH

1 1 2 3 4 5 6 7 8 FLOORS :

9000 9000 9000


4500 4500 4500 4500 4500 4500 4500 4500 FL1 - PLAIN CEMENT FLOOR FINISH

200x200mm VITRIFIED
UNGLAZED FLOOR TILES

FL2 - PLAIN CEMENT FLOOR ROUGH

950
W-3 W-3
WITH GROOVES
A SS UD
D-4 D-4
FL3 - 200X200 VITRIFIED FLR TILES

HE ( UNGLAZED )
D-4 SD
1
FL3
SHE D-3 A-5 FL4 - 300X300 VINYL TILES

SINK COUNTER
FL3

D-3
7000

D-2 STO.

SINK COUNTER
FL5 - PLAIN CEMENT FLOOR FINISH
STO. D-2
1 2 3 WITH WATER PROOFING
9500

WF1 WALLS :
D-2 D-2

WF1 - 150 MM THK. CHB W/ PLAIN


CEMENT PLASTER FIN (PAINTED)
B UP UP

WF2 - 150 MM THK. CHB W/ PLAIN


C O R R I D O R
2500

CEMENT PLASTER FIN (PAINTED)


FL1 PROVIDE GROOVES

C WF3 - 200X200 VITRIFIED WALL TILES

( GLAZED )
RAMP UP UP RAMP
UP UP
WF4 - 100 MM THK. CHB W/ PLAIN
ENTRY 6 CEMENT PLASTER FIN (PAINTED)
A-6
1 GROUND FLOOR PLAN WF5 - 50 MM SQ. CYCLONE WIRE ON
75mm G.I. PIPE VERT
A-2 SCALE : 1 : 100 METERS
@1200mm O.C. & 50mm
G.I. PIPE HOR. @600mm O.C.

1 SUNBREAKER
SEE DETAIL
2 3 4 5 6 7 8 9
150mm THK CHB WALL 9000 9000 9000
PLAIN CEMENT PLASTER 4500 4500 4500 4500 4500 4500 4500 4500
& PAINT FIN.
950

A
LANDING LANDING

1 FL1 FL1

A-5
50mm G.I. PIPE

HANDRAIL w/19mm SQ.


7000

BAR RAILING @146mm DN DN


ON CENTER PAINT FIN.
4 5 6
9500

WF1 WF1 WF1

B
2500

C O R R I D O R C O R R I D O R
2 FL1 FL1

A-7
C

2 SECOND FLOOR PLAN


A-2 SCALE : 1:100 mts.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-2
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
TABLE OF CONTENTS
GROUND & SECOND FLOOR PLAN
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8
1 1
9000 9000 9000 4500

4500 4500 4500 4500 4500 4500 4500

GA#26 G.I. CORR SHT.


ROOFING FOR
SUNBREAKER ON STL.
FRAMING

950
A
WF5 WF5 WF5 WF5 WF5 WF5 WF5 WF5
LANDING LANDING

A-5

50mm G.I. HANDRAIL 50mm G.I. HANDRAIL

DN w/19mm SQ. BAR w/19mm SQ. BAR DN

7000
@600mm OC ANCHORED @600mm OC ANCHORED
ON CHB WALL ON CHB WALL

MULTI-PURPOSE
FL1 FL1 FL1
50mm G.I. HANDRAIL 50mm G.I. HANDRAIL

w/19 SQ. BAR RAILING w/19 SQ. BAR RAILING


@146mm O.C. PAINT FIN. @146mm O.C. PAINT FIN.

B
2500

WF5 WF5 WF5 WF5 WF5 WF5 WF5 WF5

ROOF LINE

1 THIRD FLOOR PLAN


A-3 SCALE : 1 : 100 METERS

1 2 3 4 5 6 7 8 9
600 9000 9000 9000 4500

4500 4500 4500 4500 4500 4500 4500


1000

LIGHTING FIXTURES
7000

EXPOSED STEEL TRUSS

b 6mm THK. ORD.

PLYWOOD W/6mm
GROOVE ON 50x50mm
2500

CEILING JOIST @600mm


O.C BOTHWAYS

c CONC. PEDESTAL
1000

A-6
GA. 24 PLAIN G.I.

2 THIRD REFLECTED CEILING PLAN SHEET GUTTER


25X300 FASCIA BD.
ON

( PAINTED FINISH )
A-3 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-3
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY ARCHITECT IV
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
SHEET CONTENTS :
PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
THIRD FLOOR TABLE OF CONTENTS
PLAN
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : REFLECTED CEILING PLAN
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


C B A
1 1
2 3 4 5 6 7 8
1 9

600 9000 9000 9000 600

9500

4500 4500 4500 4500 4500 4500 4500 4500 1000 2500 7000 1000

APEX LINE OF TRUSS APEX LINE OF TRUSS

GA. 24 CORR. G.I. SHEET


GA. 24 CORR. G.I.
GA. 24 PLAIN G.I. GA. 24 PLAIN G.I. ROOFING (PAINTED FINISH)

2500
SHEET ROOFING
2500

SHEET GUTTER ON SHEET RIDGE ROLL


( PAINTED FINISH ) 25X300 FASCIA BD.
(PAINTED FIN.)
( PAINTED FINISH )
TOP OF ROOF BEAM LOWER LEVEL OF TRUSS
GA. 24 PLAIN G.I. SHEET
GUTTER ON 25X300 FASCIA

BD. (PAINTED FINISH)


50x50mm CYCLONE WIRE

50mm G.I. PIPE ON 50mm G.I. PIPE


50x50mm CYCLONE WIRE
HOR. @600mm O.C.&
4000

4000
HANDRAIL ON 50mm G.I. PIPE
PAINTED FIN. VERT. 1500mm O.C.
HOR. @600mm O.C.&
PAINTED FIN.
VERT. 1500mm O.C.
PAINTED FIN.
900

CONCRETE CURB
675

400
THIRD FLOOR LEVEL
75mm PVC PIPE
COURT FLR. LVL. DOWNSPOUT PAINTED FIN.
10725

10725
3200

3200
W-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 D-1 W-2
PLAIN CEMENT PLASTER
PAINTED WALL FINISH

100 MM THK. CHB GA. 26 CORR. G.I. SHEET


SECOND FLOOR LEVEL SECOND FLR. LVL.
RAILING W/50mm % SUNBREAKER ON STEEL FRAMING
G.I. PIPE RAILING
(SEE DETAIL)
3200

3200
D-2 D-1 W-2 W-2 D-1 D-1 W-2 W-2 D-1 W-2 D-1 D-1 W-2 D-1 32mm G.I. PIPE 32mm G.I. PIPE HANDRAIL
HANDRAIL WITH 32mm
WITH 32mm VERT. SUPPORT @
VERT. SUPPORT @ 600mm
O.C. (PAINTED FINISH) 600mm O.C. (PAINTED FINISH)
GROUND FLOOR LEVEL GROUND FLR. LVL.
325

325
NAT. GRD. LN. NAT. GRD. LN.

1 FRONT ELEVATION 3 RIGHT SIDE ELEVATION


A-4 SCALE : 1 : 100 METERS
A-4 SCALE : 1 : 100 METERS

A B C
9 8 7 6 5 4 3 2 1

600 4500 9000 9000 9000 4500 600


9500

4500 4500 4500 4500 4500 4500 1000 7000 2500 1000

APEX LINE OF TRUSS APEX LINE OF TRUSS

GA#24 PL. G.I. GA. 24 CORR. G.I. SHEET


GA. 24 CORR. G.I. CORR. SHT ROOFING
GA. 24 PLAIN G.I. GA. 24 PLAIN G.I. ROOFING (PAINTED FINISH)
±2500

SHEET ROOFING

2500
SHEET GUTTER ON SHEET RIDGE ROLL
( PAINTED FINISH )
25X300 FASCIA BD.
(PAINTED FIN.) GA#24 PL. G.I. SHT
( PAINTED FINISH ) GUTTER ON 25x300mm

TOP OF ROOF BEAM FACIA BD. (PAINTED FINISH) LOWER LEVEL OF TRUSS
GA. 24 PLAIN G.I. SHEET
GUTTER ON 25X300 FASCIA

BD. (PAINTED FINISH)


50x50mm CYCLONE WIRE

50mm G.I. PIPE ON 50mm G.I. PIPE


HOR. @600mm O.C.& 50x50mm CYCLONE WIRE
HANDRAIL
4000

4000
VERT. 1500mm O.C. ON 50mm G.I. PIPE
PAINTED FIN.
PAINTED FIN. HOR. @600mm O.C.&
VERT. 1500mm O.C.
PAINTED FIN.
900

CONCRETE CURB

400
13225

THIRD FLOOR LEVEL


GA#26 CORR G.I. SHT.
SUNBREAKER ON STL
COURT FLR. LVL.
FRAMING (SEE DETAIL)

10725
3200

3200
PLAIN CEMENT PLASTER
PLAIN CEMENT PLASTER
PAINTED WALL FINISH
PAINTED WALL FINISH

W-1 W-1 W-1 W-1 W-1 W-1 W-1 1-W


SECOND FLOOR LEVEL SECOND FLR. LVL. GA. 26 CORR. G.I. SHEET
SUNBREAKER ON STEEL FRAMING

(SEE DETAIL)

32mm G.I. PIPE HANDRAIL


3200

3200
W-3 3-W WITH 32mm VERT. SUPPORT @

600mm O.C. (PAINTED FINISH)

W-1 W-1 W-1 W-1 W-1 W-1


GROUND FLOOR LEVEL GROUND FLR. LVL.
325

325
NAT. GRD. LN. NAT. GRD. LN.

2 REAR ELEVATION 4 LEFT SIDE ELEVATION


A-4 SCALE : 1 : 100 METERS
A-4 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-4
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY ARCHITECT IV
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
SHEET CONTENTS :
PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
FRONT, REAR, RIGHT OF CONTENTS
& LEFT
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : ELEVATION
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


SEE STRUCTURAL DET.

A B C

1 2 3 4 5 6 7 8 9 1000 9500

7000 2500
600 4500 9000 9000 9000 4500 135

4500 4500 4500 4500 4500 4500


TOP OF TRUSS

SEE TRUSS DETAILS

2500
APEX OF TRUSS
2500

6mm THK. PLYWOOD TRUSS LOWER LEVEL


CEILING ON 50x50mm
CLG. JST. @600mm O.C.
B.W. PAINT FIN.
THIRD FLOOR LEVEL

50x50mm CYCLONE WIRE

4000
ON 50mm G.I. PIPE
HOR. @600mm O.C.&
VERT. 1500mm O.C.
50x50mm CYCLONE WIRE PAINTED FIN.
4200

ON 50mm G.I. PIPE


HOR. @600mm O.C.&
VERT. 1500mm O.C.
PAINTED FIN.

THIRD FLOOR LEVEL

3200
W-1 W-2
3200

SECOND FLOOR LEVEL CLASSROOM 5 CORRIDOR

6725
10200

W-1 W-1 CLASSROOM 4 W-1 W-1 CLASSROOM 5 W-1 W-1 CLASSROOM 6 W-1 W-1
SECOND FLOOR LEVEL

3200
LANDING LANDING
W-1 W-2

1750
3200

GROUND FLOOR LEVEL CLASSROOM 1 CORRIDOR


W-3 W-3

325
NAT. GRD. LN.

HE W-1 CLASSROOM 1 W-1 W-1 CLASSROOM 2 W-1 W-1 CLASSROOM 3 W-1 HE


GROUND FLOOR LEVEL
325

NAT. GRD. LN. EXPOSED CEILING

UNDERSLAB PAINTED FIN.


EXPOSED UNDER SLAB
CEILING PAINTED FINISH

1 LONGITUDINAL SECTION
2 CROSS SECTION
A-5 SCALE : 1 : 100 METERS

A-5 SCALE : 1 : 100 METERS

1 2 3 4 5 6 7 8 9
600 4500 9000 9000 9000 4500 600

4500 4500 4500 4500 4500 4500

GA.24 CORR. G.I.


SHEET ROOFING
PAINTED FINISH
RD RD RD RD RD
1000

GA#24 G.I. PL. RIDGE


ROLL PAINTED FIN.
7000

B GA#24 G.I. PL. FLASHING


ON 25x300mm FASCIA
BD.
2500

C
1000

RD RD RD RD RD

GA#24 G.I. PL. GUTTER


ON 25x300mm FACIA BD. 75mm UPVC PIPE
DOWNSPOUT PAINTED FIN.
3 ROOF PLAN
A-5 SCALE : 1 : 100 METERS

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-5
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

UNDERSECRETARY
MERALCO AVENUE, PASIG CITY ARCHITECT IV
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY:
SHEET CONTENTS :
PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
LONGITUDINAL, CROSS OF CONTENTS
SECTION &
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : ROOF PLAN
01 03
DAMP PROOFING DETAIL, BALCONY RAILING DET.
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


900
32mm G.I. PIPE

12 13
HANDRAIL WITH 32mm
800 900

200
VERT. SUPPORT @ 600mm

4500
O.C. (PAINTED FINISH)

300
600

32 mm G.I PIPE

900
VERTICAL SUPPORT
@ 600mm ON CENTER

B
PROVIDE 12mm STEEL
2400

DOWELS (PAINTED FIN.)

700
2100

2100

2100

1200
800

1500
NON-SKID PLAIN CEMENT
FLOOR FINISH W/ GROOVE

100
300
LINES

300

2500
FFL

CLASSROOM TOILET TOILET (DISABLED) TOILET (CUBICLE) 8


C O R R I D O R
A-6
1200
TANGUILE PANEL DOOR ON 50X150 MM HOLLOW CORE FLUSH TYPE SWING DOOR HOLLOW CORE FLUSH TYPE SWING SWING DOOR ON 50X100

D-1 THK. YACAL/GUIJO JAMB W/ FIXED CLEAR D-2 W/ MARINE PLYWOOD FACING INSIDE AND D-3 DOOR W/ MARINE PLYWOOD FACING D-4 YACAL/GUIJO DOOR JAMB COMPLETE
GLASS TRANSOM COMPLETE WITH
ORDINARY OUTSIDE COMPLETE W/ INSIDE AND ORDINARY OUTSIDE WITH HARDWARES ACCESSORIES 7 DETAIL SECTION
C
HARDWARES AND ACCESSORIES HARDWARES AND ACCESSORIES COMPLETE W/ HARDWARES AND

175
ACCESSORIES PROVIDE KICK PLATE
A-6 SCALE 1:10 M

1400
1400
4 EQUAL PARTS = 2500 2 EQUAL PARTS = 1400 4 EQUAL PARTS = 2500 RAMP UP
32mm G.I. PIPE
6 HANDRAIL WITH 32mm 100
A-6 VERT. SUPPORT @ 600mm
O.C. (PAINTED FINISH)
100X100 CONCRETE

300
300

600
SKIRTING
3600

5150

1200
1200

TOTAL RUN OF RAMP

2400
7
2400

2400
NON-SKID PLAIN CEMENT

100
FLOOR FINISH W/ GROOVE LINES A-6 32 mm G.I PIPE

1800

150
VERTICAL SUPPORT
@ 600mm ON CENTER
5 DET. PLAN OF RAMP PROVIDE 12mm STEEL
DOWELS (PAINTED FIN.)
900
900

A-6 SCALE 1:50 M

FFL

32mm G.I. PIPE


8 SPOT DETAIL
JALOUSIE WINDOWS WITH CLEAR GLASS BLADES ON JALOUSIE WINDOWS WITH CLEAR GLASS BLADES JALOUSIE WINDOWS WITH CLEAR GLASS
HANDRAIL WITH 32mm
STANDARD ALUMINUM CASING AND FIXED CLEAR ON STANDARD ALUMINUM CASING AND FIXED BLADES ON STANDARD ALUMINUM CASING VERT. SUPPORT @ 600mm
A-6 SCALE 1:5 M

W-1 GLASS TRANSOM ON 50X150 YACAL/GUIJO JAMB W-2 CLEAR GLASS TRANSOM ON 50X150 YACAL/GUIJO W-3 ON 50X150 YACAL/GUIJO JAMB COMPLETE O.C. (PAINTED FINISH)
COMPLETE WITH HARDWARES AND ACCESSORIES JAMB COMPLETE WITH HARDWARES AND WITH HARDWARES AND ACCESSORIES
ACCESSORIES NON-SKID PLAIN CEMENT
FLOOR FINISH W/ GROOVE LINES

200
SCHEDULE OF DOORS & WINDOWS
100
1 50mm B.I. PIPE 100
C SCHED. 40 RAILING
C TYPICAL

200

900
W/ 25mm SQ. BAR

700
9

1200
A-6 SCALE : 1 : 50 METERS
STEEL BRACKET @ A-6

900

6mm
6mm

700
EVERY 1200mm 6mm

200
PAINT FINISH 0

300
5
1 NON-SK
ID PLAIN
CEMENT
FLOOR
100mm CHB CONC. CEMEMN
T FINISH
RAILING W/ PLAIN CEM.

900
PLASTER PAINTED FIN.

50
SECOND FLOOR LEVEL
6 DET. ELEVATION OF RAMP
A-6 SCALE 1:50 M

9 SPOT DETAIL
SECTION SPOT DET.
SCALE 1:50 M SCALE 1:20 M A-6 SCALE 1:50 M

DETAIL OF A
GA#24 CORR. G.I. SHT. 3 BALCONY RAILING
ROOFING (PAINTED FIN. 150 X 300 REINFORCED
A-6 SCALE AS SHOWN
CONCRETE COLUMN

38mm TEKSCREW
4-12 mm X 150

300
500
ANCHOR BOLTS

50x150x2.5 C-PURLINS
L I N E O F
@±750mm ON CENTER
T R A N S O M GA. 26 CORR. G.I. SHEET

ROOFING ( PAINTED FINISH )

50
10mm SAG ROD w/
STD. NUTS/WASHERS CONCRETE SLAB

@BOTH ENDS 2-50 x 50 x 6mm ANGLE BAR

BRACKET W/ 50 X 150 X 1.5


2-63.5x50x6mm C-PURLINS SPACE AS SHOWN

400

300
PLOYETHYLENE SHEET
TOP/BOT. CHORD TO FFL DAMP PROOFING

GRAVEL BEDDING

GA#24 PL. G.I. GUTTER 250 x 25mm FASCIA BOARD

250
(PAINTED FIN.) ( PAINTED FINISH )

50
2100

25x3mm THK. GUTTER


STRAP @600mm ON
CENTER
SEE STRUCTURAL DET.

6mm THK. PLYWOOD BASKET STRAINER 2 DAMP PROOFING DET.


w/6mm GROOVE ON
50x50mm CEILING JOIST 75mm PVC DOWN
75 850
A-6 NOT TO SCALE

@600mm ON CENTER
SPOUT (PAINTED FIN.)
925
25mm WIDE GA#24 G.I.
STRAP

2 EAVES SECTION 4 SUNBREAKER DETAIL


A-6 SCALE 1 : 20 M
A-6 SCALE : 1:10 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-6
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
SCHED. OF DOORSTABLE OF CONTENTS
& WINDOWS RAMP DETAILS, EAVES
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03 DETAIL, SUNBREAKER DETAIL DAMP PROOFING DETAIL,
BALCONY RAILING DET.

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


50mm% G.I. PIPE
4
SCHEDULE 40
3
1 2
A-7
(PAINTED FINISH)
A-5
50mm% G.I. PIPE
250.0000
SCHEDULE 40
9.0000 300.0000
4.4000 4.4000 50mm% G.I. PIPE TYPICAL (PAINTED FINISH)
SCHEDULE 40 100.0000
0.2000 50mm% G.I. PIPE
(PAINTED FINISH) SCHEDULE 40
A
19mm SQUARE BAR
WELDED TO G.I. PIPE (PAINTED FINISH)
HANDRAIL @ 300mm O.C.
W-1
19mm SQUARE BAR
900.0000
PLAIN CEMENT STEEL WELDED TO G.I. PIPE 300
TROWELL FIN. HANDRAIL @ 300mm O.C.

TYPICAL
19mm SQUARE BAR 19mm SQUARE BAR

L
WELDED TO G.I. PIPE WELDED TO G.I. PIPE
LANDING

A L
900.0000
5.0000 HANDRAIL @ 300mm O.C. HANDRAIL @ 300mm O.C.
50.0003

7 300.0000

W
168.4220 SECOND F.F.L.
8
A-5
A-5

TYPICAL
168.4210

17 18 ANCHORED @ R.C. STAIR


50

16 19

50mm G.I. PIPE SCH. 15 LANDING 300 ANCHORED @ R.C. STAIR


DN
40 w/19mm SQ. BAR

292mm EACH = 4672mm


14
@146mm ON CENTER
PAINT FIN. 13
14.0000

12 4 HANDRAIL DETAIL TYPICAL


300.0000 5 DETAIL SECTION
11
A-7 SCALE 1:5 M
A-7 SCALE 1:20 M

10
6 CRASH RAILING 7 SPOT DETAIL
A-7 SCALE 1:20 M
A-7 SCALE 1:20 M

9.3440
C B 50mm G.I. PIPE SCH.
SEE TRUSS DETAIL A
BOT. OF STL. TRUSS

@
40 @600mm O.C. HOR.
PAINTED FINISH

TREADS
4.0000 14.0000

50mm SQ. CYCLONE

16
WIRE
50mm G.I. PIPE SCH.
40 @1500mm O.C. VERT. 175
PAINTED FINISH
50

3400
50mm% G.I. PIPE
50mm % G.I. PIPE

4000
SCHEDULE 40 PAIN. FIN. SCHEDULE 40
PAINTED FINISH
(SECOND FLOOR TO GROUND FLOOR)
2 DETAIL PLAN OF STAIR 19mm % ROUND BAR
WELDED TO G.I. PIPE

100
19 mm SQUARE BAR
HANDRAIL @ 300mm O.C. ANCHORED TO THE
1:50 mts
A-5 SCALE :
WALL (PAINTED FIN.)

168
1 2

@
700
150mm THK. CHB. CURB
PLASTER PAINTED FINISH CORRIDOR THIRD FLOOR LINE

RISERS
4500 19
18
1750
17 LANDING 512
16

2
15
14
8 SPOT DETAIL
13

A 11
12
A-7 SCALE 1:5 M

W-1 19mm SQUARE BAR


50mm G.I. PIPE 10

6400
WELDED TO HANDRAIL
HANDRAIL SCH. 40 9
50mm % G.I. PIPE @146mm ON CENTER
8 W-1
SCHEDULE 40 PAIN. FIN. PAINT FIN.
PAINT FIN.
7
TOILET 146
6 5
5
A-7
200

@±168=
3
2
700

1
CORRIDOR 19
SECOND FLOOR LINE

337
17 175
18

RISERS
50mm% G.I. PIPE
16 18
17 LANDING
16 50 SCHEDULE 40
5300

15 19
15 (PAINTED FINISH)

2
14
14 13

=
292mm EACH = 4672mm

12 38mm STAINLESS
13 W-3

900mm FROM TREAD


11 STL. GRAB BAR

17 RISERS @±168
14.0000
10
12

3200
9
50mm % G.I. PIPE 50

2863
11 SCHEDULE 40 PAIN. FIN. 8
19 mm SQUARE BAR
7
ANCHORED TO THE
50mm G.I. PIPE SCH. 10 6
WALL (PAINTED FIN.)

1819
40 w/19mm SQ. BAR 5
@146mm ON CENTER 9 4
PAINT FIN. 3

±900
8
900

2
1
7
CORRIDOR STORAGE TOILET GROUND FLOOR LINE
@

650
NATURAL GRADE LINE
9
16TREADS

5
A-5
4
1613

3325 1500 900 925


292

3 15 TREADS @ 300 = 4500


50

2
9 SPOT DETAIL
7025

1
B A-7 SCALE 1:5 M

UP
3 SECTION OF STAIR
(GRD FLOOR TO SECOND FLOOR)
1 DETAIL PLAN OF STAIR A-7 SCALE 1:50 M

A-5 SCALE : 1:100 mts

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM A-7
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 8
8
0010990 149 460 161
PRC NO. : TIN :
STAIR DETAILS TABLE OF CONTENTS
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : HANDRAIL DETAILS
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


100 750 850 850 850

1 2 10 11 200x200mm VITRIFIED
GLAZED TILES

4500 4500

PLAIN CEMENT PLASTER


PAINTED FINISH

SD
1750 100 100 1750 200X200 VITRIFIED
2ND FLR. LVL. 2ND FLR. LVL. CERAMIC WALL TILES
( GLAZED )

600
651
SINK COUNTER

512

512
LANDING LANDING LVL. LANDING LVL. LANDING

125

125
200x200mm VITRIFIED

1013

1013
GLAZED WALL TILES

3500

3200

3200
W-3 W-3

2688

2688
2713

2738
DET. PLAN
2613

2613
SINK
1600

1600
URINAL DET. ELEVATION

900
200 250
150

FEMALE MALE

150
CORRIDOR LVL. WC CLASSROOM LVL. CLASSROOM LVL. WC CORRIDOR LVL.

50

50
25

25
PLAIN CEM. PLASTERED
300

300
TOILET LVL. TOILET LVL. TOILET LVL. TOILET LVL.
PAINTED FIN.
FIN. GRADE LN. FIN. GRADE LN.

3 DET. SECTION OF FEMALE TOILET W-3

A-8 SCALE 1:50 M 200x200mm GLAZED


WALL TILES

200 150 250

4 DET. SECTION OF MALE TOILET

150
A-8 SCALE 1:50 M

URINAL
100

1 2 12 13 CONC. COUNTER

4500 9000 15

300
600 1750

70
200x200mm VITRIFIED

800
150 1500 UNGLAZED FLOOR TILES
1500 650
W-3 200
250 W-3 100

600
A
600

SLOP
900

UD

900
SINK
D-4 D-4
100

200x200mm VITRIFIED
UNGLAZED FLOOR TILES
DET. SECTION
750

600
2500

SHE

URINAL
900

D-4
SD HE
425

1500
4
FL3 FL3
A-8
D-3
850

PLAIN CEM. PLASTERED


3500
COUNTER

PAINTED FIN.
3mm THK. FACIAL
100
5300

MIRROR ON AL. FRAMING


1500

450

D-3
850
SINK

D-2
COUNTER
600
7000

7000

2100

STO.
425

200x200mm VITRIFIED

2650
600

WALL TILES (GLAZED)


SINK

1750
D-2
STO.

800
450

2500
1100
3450

200
D-2 D-2
1650

1650

300

800
B
UP 2372
UP

150
1 FEMALE TOILET DETAIL 2 MALE TOILET DETAIL
A-8 SCALE 1:20 M
A-8 SCALE 1:20 M
5 DET. OF COUNTER SINK
A-8 SCALE 1:20 M

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: AZB


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

EMMANUEL P. CUNTAPAY
ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED A-8
F O RC E

ALBERT Z. DE BELEN
SIX CLASSROOM
ON

ENCODED BY: Max C


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE

CHIEF, ARCHITECTURAL DIVISION


TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ARCHITECT IV UNDERSECRETARY
MERALCO AVENUE, PASIG CITY
8
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
0010990 149 460 161
PRC NO. : TIN :
TABLE
TOILETS DETAIL OF CONTENTS
27 OCT. 2002
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9

4500 4500 4500 4500 4500 4500 4500 4500 B A


F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3 F-3
C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3 C-3

A TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

2ND FLOOR LEVEL 2ND FLOOR LEVEL

NOTE:
TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2
7000

SEE SCHEDULE FOR


100mm THICK REINFORCEMENT OF
SLAB ON FILL G-4/G-6 MEMBERS.

SEE DEV'T
DEV'T G-5/G-7 G-5/G-7
WITH 10mm SEE

LENGTH
SPACED AT 400 LENGTH
BOTHWAYS

F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2 F-2


C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2

C ELEVATION OF COLUMN
B TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3
SCALE : 1 : 25 M
C-3 S-1 C-4
2500

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1

TG-1
D

S-2
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1
C TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3 TG-3

C O L U M N S C H E D U L E

A FOUNDATION PLAN
LEVEL C-1 C-2 C-3
S-1 SCALE : 1:100 M.

350 350 350

350

350

350
8
1 2 3 4 5 6 7 8 9

TO
FLOOR LEVEL

3RD FLOOR LEVEL


4500 4500 4500 4500 4500 4500 4500 4500

MAIN BAR: MAIN BAR: MAIN BAR:

6-%16mm 12-%20mm 12-%20mm


G-3a G-3 G-3 G-3 G-3 G-3 G-3 G-3a
A TIES : 10 mm TIES : 10 mm TIES : 10 mm

1@50, 8@75, REST @ 1@50, 8@75, REST @ 1@50, 8@75, REST @

2ND
150mm TO CENTER 150mm TO CENTER 150mm TO CENTER

STAIR WELL STAIR WELL


S-1 S-1 S-1 S-1 S-1 S-1

350 350 350


7

7
CB-1 B-1 B-1 B-1 B-1 B-1 B-1 CB-1

G-5
7000

G-5

G -

G -

G -

G -

G -

G -

G -
B-2

B-2
S-2 S-2

350
S-1 S-1 S-1 S-1 S-1 S-1

400

400
TO
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2
B

LEVEL

FLOOR LEVEL
S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 MAIN BAR:
2500

G-4

G-6

G-6

G-6

G-6

G-6

G-6

G-6

G-4
8-%16mm

FOUNDATION
MAIN BAR: MAIN BAR:
TIES : 10 mm
G-1 G-1 G-1 G-1 G-1 G-1 G-1 G-1 14-%20mm 12-%20mm

C 1@50, 8@75, REST @


150mm TO CENTER TIES : 10 mm TIES : 10 mm

2ND
1@50, 10@75, REST @ 1@50, 10@75, REST @
150mm TO CENTER 150mm TO CENTER

B 2ND & 3RD FLOOR FRAMING PLAN


S-1 SCALE : 1:100 M.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

WILFREDO S. LOPEZ
BERNADETTE N. AQUINO
SIX CLASSROOM S-1
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 4
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE OF FLR
FOUNDATION, 2ND&3RD CONTENTS
FRAMING PLAN
PTR NO. : DATE : LOCATION : DATE : 01 03 SCHEDULE AND ELEVATION OF COLUMN

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


AS SHOWN
%10 SPACED

MAIN BARS
%10 @250 10 @250

1 2 3 4 5 6 7 8 9
CUT BARS
1-10
NOSING BAR
4500 4500 4500 4500 4500 4500 4500 4500 NGL

100

125
5
TIE BEAM

12
(SEE SCHEDULE)

100
A 400

4-10 CONT. BARS

10 @250
CUT BARS

C DETAIL OF TIE BEAM D DETAIL OF STAIR ON GRADE


T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1

T-1
7000

SCALE NTS SCALE 1 : 25M


S-2 S-2

B
2500

8 9

10 300mm TEMP
BARS BOTHWAYS

LC-150x65x20x2.0 PURLINS
12mm CROSS
SPACED @ 750 mm O.C
BRACINGS
WITH %10 SAGRODS @ MIDSPAN

125
10mm

C
A ROOF DECK FRAMING PLAN
S-2
S-1 SCALE : 1:100 M.

E DETAIL OF RAMP
SCALE 1 : 50M
S-2

L1 L2

L1/3 TOP BAR


L1/3 L2/3 TOP BAR L

NGL

L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR

D
Y-BARS
X-BARS

W
TYPICAL SLAB ELEVATION

t
B Y-BARS

100
S-2 X-BARS

100 mm THICK
L
GRAVEL BEDDING

PLAN SECTION

S C H E D U L E OF S L A B S F TYP. FOOTING DETAIL


SCALE NTS
REBAR SPACING
in
ALONG
mm
SHORT DIRECTION REBAR SPACING
in
ALONG
mm
LONG DIRECTION S-2
THICK-
FLOOR SLAB
NESS LEFT SUPPORT MIDSPAN RIGHT SUPPORT LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
LEVEL MARK REBAR REBAR
in mm SIZE SIZE
TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT.

S C H E D U L E O F F O O T I N G
LEVEL
SECOND

S-1 100 10 200 300 300 200 300 10 250 300 300 250 300 TWO-WAY
FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS
- -

FOOTING
S-2 100 10 300 300 - 300 300 300 10 300 300 - 300 300 300 TWO-WAY
MARK LENGTH WIDTH DEPTH Thickness
BAR X BAR Y
(L) (W) (D) (t)

F-1 1500 1500 1500 250 8 - 16mm% 8 - 16mm% SQUARE FOOTING

F-2 2600 2600 1500 350 11 - 20mm% 11 - 20mm% SQUARE FOOTING

F-3 2400 2400 1500 300 11 - 20mm% 11 - 20mm% SQUARE FOOTING

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

WILFREDO S. LOPEZ
BERNADETTE N. AQUINO
SIX CLASSROOM S-2
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 4
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE OF OF
ROOF FRAMING,SCHED CONTENTS
SLAB&FOOTING
PTR NO. : DATE : LOCATION : DATE : 01 03 DET OF TIE BEAM,STAIR ON GRADE&RAMP
NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


C

5 S-3
6 A B
4500

2200 100 2200 G


L1 L2 L3
S-3

L2/3 L2/3 L3/3 L3/3


A
3RD FLOOR LEVEL
2D 2D LAP SPLICES ARE ALLOWED 2D 2D LAP SPLICES ARE ALLOWED 2D
SEE SCHEDULE OF
ONLY IN THIS PORTION ONLY IN THIS PORTION
S-2 (2ND/3RD LVL) CB-1
FOR DETAIL OF REIN.
S-2 G-2

2150
D

D
G-3a S-
STB-2
3

L2/5 L2/5 L2/5 L3/6 E

3200
2-12mm SIDE BARS ST
DC-1 B- S-3
DC-1 STB-2 1

269.5
H

TYPICAL BEAM ELEVATION


G

@ 300mm EACH = 4500mm


A DN S-3
S-3

S-3

7000
2ND FLOOR LEVEL
SEE SCHEDULE OF
CB-1 S-2 (2ND/3RD LVL) CB-1
FOR DETAIL OF REIN.
G-2

STB-1

STB-1
D

4500
G-3a S-
STB-2
3

3200
ST

B-2
B E A M S C H E D U L E B-

TREADS
S-3
1

269.5
BEAM S T E E L R E I N F O R C E M E N T S

15
F
DIMENSIONS S T I R R U P S
FLOOR BEAM S-3
LEVEL MARK ( in / mm ) REBAR
LEFT MID SPAN RIGHT
10mm

(mm ) (UNLESS NOTED OTHERWISE)


b h TOP BOTTOM TOP BOTTOM TOP BOTTOM
GROUND FLOOR LEVEL
G-1 200 400 20mm 3 2 2 2 3 2 1@50, 6@100, REST@200

G-2 200 400 20mm 4 3 2 2 4 3 1@50, 6@100, REST@200


B
G-3 200 400 20mm 3 3 2 2 3 3 1@50, 6@100, REST@200 TG-3

G-4 200 400 20mm 3 2 2 2 6 4 1@50, 6@100, REST@200


2ND FLOOR LEVEL

G-5 250 500 20mm 6 4 2 4 6 4 1@50, 8@100, REST@200 B STAIR FRAMING PLAN (TYP) C STAIR SECTION DETAIL
G-6 200 400 20mm 4 3 2 2 6 4 1@50, 6@100, REST@200 S-3 SCALE 1:50 M
S-3 SCALE 1:50 M

G-7 250 500 20mm 6 4 2 6 6 4 1@50, 8@100, REST@200

B-1 200 400 16mm 4 2 2 2 4 2 1@50, 6@100, REST@200

B-2 200 400 16mm 2 2 2 4 2 2 1@50, 6@100, REST@200


200

CB-1 200 400 16mm 4 2 4 2 4 2 1@50, 6@100, REST@200


10 @300
TEMP BARS

200
10 @ 250
TOP MAIN BARS
G-1 200 400 20mm 2 2 2 2 2 2 1@50, 6@100, REST@200
MAIN BAR:

100
G-2 200 400 20mm 3 2 2 2 3 2 1@50, 6@100, REST@200 4-16mm

TIES : 10 mm
G-3 200 400 20mm 3 2 2 2 3 2 1@50, 6@100, REST@200
1@50, 8@75, REST @
150mm TO CENTER
G-4 200 400 20mm 3 2 2 2 5 3 1@50, 6@100, REST@200 STB-1 STB-1
LEVEL

G-5 250 500 20mm 5 3 2 4 5 3 1@50, 8@100, REST@200


DC-1
D SECTION OF STAIR SLAB (FROM LANDING TO
3RD FLOOR

G-6 200 400 20mm 3 2 2 2 6 4 1@50, 6@100, REST@200


2ND/3RD FLOOR LEVEL)
G-7 250 500 20mm 6 4 2 6 6 4 1@50, 8@100, REST@200
S-3 SCALE 1:25 M

B-1 200 400 16mm 4 2 2 2 4 2 1@50, 6@100, REST@200

B-2 200 400 16mm 2 2 2 3 2 2 1@50, 6@100, REST@200

CB-1 200 400 16mm 4 2 4 2 4 2 1@50, 6@100, REST@200 10 @300

10 @300 1-10
NOSING BAR
1-10 10 @300

TG-1 300 500 20mm 5 4 2 2 6 4 1@50, 8@100, REST@200 NOSING BAR 1-10
NOSING BAR
BEAM

ST
TIE

TG-2 300 500 20mm 6 4 2 3 6 4 1@50, 8@100, REST@200 B-


1
100mm
TG-3 300 500 20mm 3 3 2 2 3 3 1@50, 6@100, REST@200

10
CB-1

0
10 @300

100
100
100 100
100

ST
BEAM
STAIR

STB-1 200 400 16mm 3 2 2 4 3 2 1@50, 6@100, REST@200 10 @ 250


B-
MAIN BAR 1 10mm @
TG-3
300mm o.c. 10 @300
3-10mm STB-2

E SPOT DETAIL F SPOT DETAIL G SPOT DETAIL


SCALE 1 : 25 M SCALE 1 : 25 M SCALE 1 : 25 M
S-3 S-3 S-3

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

WILFREDO S. LOPEZ
BERNADETTE N. AQUINO
SIX CLASSROOM S-3
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 4
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE
SCHEDULE OF OF CONTENTS
BEAMS/GIRDERS
PTR NO. : DATE : LOCATION : DATE : 01 03 DETAIL OF STAIR

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


S-4

250

W-3
W-3 W-3
W-3

W-3

W-3

500
12mm DEFORMED
2 W-
W- 2
BARS
D W-3 W-3
S-4
W-3

W-3

W-3
2500

10 EQUAL SPANS @ 450 mm = 4500


W-3 W-3

B 500 W 500
2 -
- 2L-2x2x1/4 STRUT 2L-2x2x1/4 STRUT

W-3

W-3
DIAGRAM OF STRUT-1
S-4 W 2
A
SCALE 1 : 25 M
W-
3 W-
3 S-3

W-3

W-3
W-3

W-3
3
W
3 W

-
-
-
- 3

W
W
3
250

W-3

W-3
W-3 W-3
E
1000 8 EQUAL SPANS @ 1062.5 = 8500
S-4

I
S-4

3
W-

W-
6mm GUSSET
PLATE (TYP.)
3

STRUT-1
D
OR
RD CH
HO P
C
6mm GUSSET TO
P
TO
PLATE (TYP.)
W-3
SCHEDULE OF TRUSS MEMBERS W-3 FULL WELD FULL WELD

D
MARK DESCRIPTION OR
QTY SIZE CH
4000

M
TO
3

W-
T
W-

BO
2.5"x2"x5/16"
=

3
@ 1000

(SHORT LEGS
CONNECTION DETAIL CONNECTION DETAIL
W-1 COLUMN 2L

BACK TO BACK) B C
1 : 10 M 1 : 10 M
W-1

SCALE SCALE

W-1
S-4 S-4
SPANS

W-3 W-2 TOP & BOTTOM CHORDS 2L 2"x2"x1/4" W-3


W-1

W-1
W-3 WEB MEMBERS L 2"x2"x1/4"
EQUAL

3
W-

W-
3
4

6mm GUSSET
PLATE (TYP.)

W-3 W-3 D
FULL WELD
OR
CH
OM
D TT
OR BO
CH 6mm GUSSET
P
TO
PLATE (TYP.)
3

W-
W-

3
FULL WELD

3RD FLOOR LEVEL

250 250

9500 D CONNECTION DETAIL E CONNECTION DETAIL


SCALE 1 : 10 M SCALE 1 : 10 M
S-4 S-4

150x65x20x2.0mm
A DIAGRAM OF T-1
SCALE 1 : 25 M
STEEL
750mm O.C.
C-PURLINS
S-3 250
FULL WELD

10mm% SAG ROD WITH


6mm GUSSET
2L-2x2x1/4
STANDARD NUTS & 50 150 50 STRUT
PLATE (TYP.)
WASHERS @ EACH END
4-%16x300mm LONG 4-%16x300mm LONG
6mm GUSSET
±7
50 BENT ANCHOR BOLTS BENT ANCHOR BOLTS
PLATE (TYP.)

38
250x250x16mm

6mm GUSSET BASE PLATE


FULL WELD

LC-150x65x20x2.0
PLATE (TYP.)

250

175
COLUMN
1-%10mm A-307 PURLINS
ANCHOR BOLT FULL WELD
L-2.5x2.5x1/4

38
250x250x16mm
COLUMN
BASE PLATE

PLAN SECTION

F SAG ROD CONNECTION DETAIL G PURLIN CONNECTION DETAIL H CONNECTION DETAIL I CONNECTION DETAIL
SCALE 1 : 10 M SCALE 1 : 10 M SCALE 1 : 10 M SCALE 1 : 10 M
S-4 S-4 S-4 S-4

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED
F O RC E

WILFREDO S. LOPEZ
BERNADETTE N. AQUINO
SIX CLASSROOM S-4
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW 4
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE OF CONTENTS
TRUSS DIAGRAM
PTR NO. : DATE : LOCATION : DATE : 01 03 DETAILS OF STEEL CONNECTION

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


1 2 3 4 5 6 7 8 9 10
12 13
600 4500 9000 9000 9000 9000 4500 600

4500 4500 4500 4500 4500 4500 4500 4500

1000
7000
2500 RD RD RD RD RD RD

2 ROOF DRAIN LAYOUT


P-1
1000

LN. OF STRUCTURE SCALE : 1 : 100 METERS

RD RD RD RD RD RD

1 2 3 4 5 6 7 8 9

100mm PVCSP
100mm PVCSP
CO
SEPTIC TANK
OUTLET
50mmPVCSP

50mmPVCSP

100mm PVCSP 100mm PVCSP

PVCSP
CO

S
S
S
S
CO
D
D
D
D
CB V
V
V
V
C
C
C
C
150mmCPDL 150mmCPDL
V
V
V
V
100mm
CB CB CB CB
P
P
P
P
50mm PVCVTW
T

m
m
m
m
m
m
m
m
VCVS
R

DS
75mm
5
7
5
7
5
7
5
7
50mmPVCWP

A
m

75mPVC
PIE(VSTR)
FD FD FD FD PVCDS FD

VC
50m
P

VC
75mPVCSTR

PIE(VSTR)
m
WC WC

PVCSP
T
m

PVCWP
T
SS UD

50m
VS
RP
PVCSP

50m
VS
RP

100mm
50mmPVCVSTR

50mm
50mm PVCVR WC LAV
FD
RISER
100mm

12mm
GICWL

GICWL

FD WC
CO

50mm LAV CO

12mm
FD

12mm
CS
12mm

PVCVTW
CO
RT

WC
FD
VCVS

GICWL
12mm
CLASSROOM CLASSROOM CLASSROOM

GICWL
GICWL STO.
m

CO
STO.
CS
50m
P

12mm
GICWL
GICWL
CDP

12mm GICWL

CV
150mm

20mm

20mm
GICWL
B UP
UP

75mm

C
7

PVCDS
5FD D
P

75mPVCDS
m
V

38mm GICWL
C

38mmGIWL
S

RAMP RAMP
UP UP
CB
150mmCPDL

150mmCPDL 150mmCPDL
150mmCPDL CB

MAIN WATER
38mm
150mm
MAIN
SYSTEM

GICWL TO
1 PLUMBING RO-IN LAYOUT
150mm
MAIN DRAINAGE
SYSTEM

DRAINAGE

SYSTEM
CDP TO
P-1 SCALE : 1 : 100 METERS
CDP TO

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED P-1
F O RC E

BERNADETTE N. AQUINO WILFREDO S. LOPEZ


SIX CLASSROOM
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
3
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE, OF
ROOF DRAIN LAYOUT CONTENTS
PLUMBING RO-IN LAYOUT
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


F
D
SD
VC

9
VP
m
m
57

PIPE (VSTR)
75mm
PVC
C
V
F

R mP
8

D
O

S 0m
C
W
VT

T
PIPE (VSTR)

V5
75mm
V

C
T

R
VS

P
m S

C
V

C
m V
50

P
m

B
m m

C
50 ISE

R
m

PVC
00

R
1

C
P
S

V
C
V

R mP
SD m

C
VC W

P
m

S 0m
V 00
P V

C
1

T
7
m

V5
m V 12
57 m LA m
m m O

P
F

C
C
W
W

C
0
V
I

P
1

G
W

C
m
m L
50
T
LE

.
T

O
U
S

D
O m S U

T
m 20

D
75 V V m

C
m

C
D
6 F

D
I

G
W

C
L
L
F W

D
I

C
G
O

P
12 m

C
m
V 12

C
m

B
m S

C
m

C
m I

K
N

P
U

G
TA m W m

S
O

C
L

D
5
0
TI

C
V

C
C

7
0
1
SE

P
SD
V

5
CV
P
m L 3
m M 8m

D
57 AI
N m

P
C

B
m W

C
m AT I W

G
OO

M
F E

C
L

D
0
SY TO

R
1
15 ST

R
M

S
0 EM
LA

75mmPVCDS
SY AIN mm

S
ST
EM

D
AI

C
R
N

D
A

P
T

F
E O

D
L
4 F

G
D

D
P
P

C
m

S
V

C
m

P P
AM

0
5
m

1
75mmPVCDS
m U

R
B
S

C
0

D
1
m
m

S
D
5
SD V

C
7
VC

P
VP
m L
m

D
57

P
C
m
m

B
OO

C
F

D
0
5
1

R
S
LA

75mmPVCDS
S
C
F

L
D

2 F

D
P
C
m
R

m
T

0
L

5
S

1
I
V

C
G
B
C

C
75mmPVCVSTR

m
P

38
S

V
C

m
P

m m
m

S
D
m

5
0

C
7
5
0

75mmPVCVSTR

P
0
1
1

S
C

V
P

B
OO

C
F

D
m
R

m
50
T

R
S

S
LA

75mmPVCDS
S
V
C

C
V

FD
O SS
P

L
P
C

D
C

L
m

P
V W
P

C
P

C
I
m
0

S m
C

m
5

V m
50 m
P

O m

0
m
C

12

5
m
O S

1
50
C
C

F
D

L
IW
B
C

G
m
C

W L m m
m 38
W m
C

S
I
G

D
m

5
ISOMETRIC VIEW
12
V

C
7
1
C

W m

P
F m L
12 I W
D
P

S
V
C

LA
V
P

m
FD

P-1
C

m W
O

00 SCALE : 1 : 100 METERS


S
T

B
1

C
V
R

A
V
C
P

P P
m AM
L
50
W
U
C

R
I
m
G

m VTW m
m L
W
m
P
0

I
m
D

V
C
C

20
5

U
1

G
P

m
0m
15

75mm
PVCDS

L
D
P
C

B
0m
15
B
C

C M 50
SY AIN mm
ST
EM
D

AI
C
R

N
D

A
P

TO
E
G

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED P-2
F O RC E

BERNADETTE N. AQUINO WILFREDO S. LOPEZ


SIX CLASSROOM
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
3
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE
ISOMETRIC VIEW OF CONTENTS
PTR NO. : DATE : LOCATION : DATE : 01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545


150X300mm RC BEAM W/2-16mm
TOP AND BOT. REBARS & 10mm STIRRUPS
1@50,3@100, REST @300mm O.C. CB CATCH BASIN

100mm THK. + FIN. SLAB W/


10mm REBARS AT 200mm O.C. CDP CONCRETE DRAIN PIPE
100mM THK. CHB
BENT UP 2 OUT OF 3 AT L/4 100mm THK. + FIN. SLAB W/
w/10mm @800mm OC. FROM FACE SUPPORT. BOTH WAYS 10mm BENT UP 2 OUT OF 3 AT L/4 FROM
FACE SUPPORT BW CO CLEAN OUT
BW
600
1000
CV CHECK VALVE
NGL AIR SPACE
NGL
HB HOSE BIBB

VAR.
MH MH
MH AIR SPACE
AIR SPACE INLET FD FLOOR DRAIN
100

INLET

100
GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)
300

300
WATER
GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)

50
WATER LEVEL
LEVEL
150 700 150 PLASTERED w/WATERPROOFING PLASTERED W/WATERPROOFING COMPOUND OR GV GATE VALVE
COMPOUND OR APPLY ONE COAT APPLY ONE FACE BITUMEN TAR
BITUMIN TAR
LEACHING
MH MANHOLE
2150

1900
CHAMBER
1600

PVCDS POLYVINYL CHLORIDE DOWNSPOUT


GRAVEL BED WALLS REINFORCEMENT
10mm VERT. & HOR. BAR
DIGESTIVE CHAMBER 10mm REINF. VERT & HOR.
@200mm OC BW PVCDP POLYVINYL CHLORIDE DRAIN PIPE
@200mm O.C BWAYS

PVCDS POLYVINYL CHLORIDE DOWNSPOUT


1SLOPE
150

150
PVCSP POLYVINYL CHLORIDE SOIL PIPE
150mm THK. SLAB W/
10mm REBARS @
150 2500 150
300mm BOTH WAYS PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
150 1000 150 4000 150
2800
5450
PVCVP POLYVINYL CHLORIDE VENT. PIPE

150mm THK. + FIM. SLAB W/


10mm REBARS @300mm O.C. BW PVCVS POLYVINYL CHLORIDE VENT STACK

PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL


2 SECTION DETAIL 3 SECTION DETAIL PVCWP POLYVINYL CHLORIDE WASTE PIPE

P-3 SCALE : 1:40 Mts.


P-3 SCALE : 1:40 Mts.
PVCWS POLYVINYL CHLORIDE WASTE STACK

700 RD ROOF DRAIN

UD URINAL DRAIN
150 400 150

WC WATER CLOSET

LAV LAVATORY
DRAINAGE PIPE

150
CS COUNTER SINK

2-10mm EXTRA BARS


S-1a 100mm THK. + FIN. SLAB W/

700

400
TOP/BOT. ON TWO PARALLEL INLET OUTLET
10mm REBARS @ 300mm O.C.
SIDE
BENT UP 2 OUT OF 3 AT L/4 PLUMBING NOTES:
FROM FACE OF SUPPORT B.W.
1. GRADES OF HORIZONTAL PIPINGS
13624

150
RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2
2500 9999
375 375 375

5a DETAIL PLAN
2. CHANGE IN DIRECTION

500 1500 500 3750 375 1750 375 3750 ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP
QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A
P-3 SCALE : 1:20 M
SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE
LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.
375

3. PROHIBITED FITTINGS
150MM THK. CHB W/ 10mm NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING
2250

REBARS HOR. EVERY 2-LAYERS


OUTLET 700
VERT. @600mm O.C.
OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.

125 (TYP.) 150 400 150 1.


4. PIPE CLEAN-OUTS
INLET CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:
125 1500 125

75 75mm a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2°).
PVCDS b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
7000

6250

MH
S-1a MH
S-1a c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.

100
d) AT THE END OF ANY HORIZONTAL PIPE LINES.
CDP
2
5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.
P-3

(VARIABLE)
min.
50
2250

2SLOPE
6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
CDP
INLET
10mm BAR HANDLE VAULT ROOF SLAB.
3-10mm (E.W.)

600
2SLOPE
50
7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.
375

OUTLET
600

100
250 100 250 8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING

100
S2 100mm THK. + FIN. SLAB W/ CONTRACTOR.
10mm REBARS @ 300mm O.C.
INLET
BENT UP 2/3 OUT AT L/4
FACE SUPPORT AND SHORT SPAN AND DESIGN CRITERIA
100

10mm TEMP BARS @300mm E.W.


3 5b DETAIL SECTION
P-3
50 50
i. LIVE LOAD_________________ 1000Pa
50 50
P-3 SCALE : 1:20 M
ii ALLOWABLE STRESSES
1. CONCRETE

a. FOR FOOTING, BEAMS AND SLABS

1 5 CATCH BASIN DETAIL SECTION


fc'' = 20 MPa
SEPTIC TANK DETAIL 4 MANHOLE DET. SECTION 2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)

P-3 SCALE : 1:40 Mts.


P-3 SCALE : 1:10 Mts. P-3 SCALE : 1:20 MTS.
fm' =6.90 MPa, fm = 2.41 MPa
3. REINFORCING STEEL BARS
FOR BARS SMALLER THAN 16mm

fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa

NOTE:
WATER TABLE IS 1500 BELOW GROUND LEVEL.

CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL : APPROVED FOR ACCREDITATION : CONCURRED : PROJECT TITLE : PROJECT NO: 01-002 OWNER : SHEET NO:

REPUBLIC OF THE PHILIPPINES DESIGNED BY: BNA


DEPARTMENT OF EDUCATION
THREE STOREY
t he PH
E A
f F
o IL
IC I

DEPARTMENT OF EDUCATION (DepED) A-1


T
M
L

P
B

TA
PU

I TO R I NG
IN

SK
RE

ES

SOFIA T. SANTIAGO GILBERTO S. REYES RAMON C. BACANI


DepED P-3
F O RC E

BERNADETTE N. AQUINO WILFREDO S. LOPEZ


SIX CLASSROOM
ON

ENCODED BY: BNA


D

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING


M
PE

NO

EN

MCMXCIX
&

IN
G
I

T
A

E N
E
R

ER
T

IN SM
A

A S SE S
T C
M
E U G ,

w/MULTI-PURPOSE
DE
TN

OIC, DIRECTOR III OIC, DIRECTOR IV


F O

ENGINEER III OIC, STRUCTURAL DIVISION UNDERSECRETARY


MERALCO AVENUE, PASIG CITY
3
SHEET CONTENTS :
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED) CHECKED BY: PERSPECTIVE VIEW
8
PRC NO. :
0074495
TIN :
199-674-196 BUREAU OF DESIGN, DPWH
TABLE
SEPTIC TANK, CATCH OF& CONTENTS
BASIN COVER DETAIL, LEGEND,
PTR NO. : DATE : LOCATION : DATE : NOTES & DESIGN CRITERIA
01 03

NOTE:
THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

You might also like