A GENERAL AND PRELIMINARIES BQ-A/5

B SHEET PILING WORKS BQ-B/3

GRAND TOT AL (INCLUSIVE SST) CARRIED TO FORM OF TENDER (RM)

RINGGIT MALAYSIA

Contract Period : TWELVEJ Months

Signature of Tenderer Signature of Witness

Full Name of Tenderer Full Name of Witness

Designation Designation

Date Date

Company Stamp

GS/1
5ELANCOR

PENGURUSAN A)RSELANGOR Sm4 BHD

SECTION B.12
BILLS OF QUANTITIES
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANTITIES

SECTION A - GENERAL AND PRELIMINARIES

Rate Amount
Item Description Unit Quantity
(RM) (RM)

SECT)ON A : GENERAL AND


PRELIMINARIES

A Allow cost for Performance Bond. L.S

B Allow cost for Insurance of Works (CAR). L.S


(Note : Insurance shall cover the total contract sum
and throughout construction period).

c Allow cost for insurance agaist personal injuries L.S


and damage to property (Third Party/Public
Liability) (to cover throughout construction period
including DLP).

D Allow cost for Workmen Compensation tnsurance L.S


(to cover throughout construction period including
DLP).

E Allow cost for contribution to SOCSO. L.S

F Allow cost for complying with the requirements of L.S


Construction Industry Development Board (CIDB)
including payment for levy and other payment
required.

G Allow cost for mobilisation of Contractor's plant L.S


including transport to Site and removal on
completion of the Works.

H Provide and maintain temporary see office, L.S


workmen accommodation, temporary buildings and
stores for use by the Contractor and subsequent
removal after completion of the Works.

J Provide and maintain temporary water supply. L.S


For item H above.

K Provide and maintain temporary efectricity L.S


supply. For ttem H above.

L Provide and maintain temporary sanitation. L.S


For item H above.

Page Total Carried to Summary of Section A

BQ-A/1
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANTITIES

SECTION A - GENERAL AND PRELIMINARIES

Rate Amount
Item Description Unit Quantity
(RM) (RM)

A Provide two (2) sets of mobile phone with 2.2GHz L.S


CPU, 6GB RAM and storage 64GB, 24MP c/w
minimum 3GB data plan each for the use of C.A.'s
representatives and provision for all charges and
deposit required by the telecommunication
companies, taxes, etc. and revert to Contractor
three (3) months affer issuance of CPC.

B Payment for item A above monthly rental and bill L.S


until three (3) months after issuance of CPC.

c Provide For the C.A. and his staff all necessary L.S
assistance for supervision, testing and measurement
of the Works done for the duration of the Contract.

D Allow for dilapidated survey, all setting out of L.S


boundaries and engineering survey during
the course of works including the provision
of all necessary equipment, materials, licensed
surveyor and labour as specified.

E Provide and maintain project signboard as NO 1


per Air Selangor requirement and to be
removed upon completion of the project.

F Provide and maintain temporary and maintain L.S


existing access roads to the Site for duration of the
Contract. Rate to include reinstatement to
original condition on completions of the.Works.

G Allow cost to maintain the works being kept L.S


clear of water in a]1 situation and temporary
drainage.

H Allow cost for liaison and compliance with L.S


Authorities and Air Selangor for permit application
and working within reserve to meet the requirement
of Authorities. All related cost including application
fees and mandatory charges shall be bome by
Contractor. Bank Guarantee or any other form of
deposit shall be borne by Air Selangor.

J Provide full time, qualified and experienced L.S


engineer as Site Agent to the approval of
the C.A.

Page Total Carried to Summary of Section A

BQ-A/2
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANTITIES

SECTION A - GENERAL AND PRELIMINARIES

Rate Amount
Item Description Unit Quantity
(RM) (RM)

A Allow cost to maintain the cleanliness of working area L.S


including ongoing housekeeping, water spraying to
reduce dust, etc. to the requirement of Authorities
and Plant Operator. Clearing up the Site as directed
during progress and upon completion of the Works.

B A)low for progress/technical meetings and L.S


provide monthly progress report and power point
presentation, complete with three (3) sets of
hardcopy records with original progress coloured
photographs to Air Se!angor as required for the
duration of the Contract.

c Allow cost for the preparation of contract L.S


documentation, binding in hardcovers and stamping
(2 original copies and 5 certified true copies).

D Provision of four (4) complete sets of official L.S


submission documentation for shop drawings,
calculation, catalogues, work method statements,
test procedures, mini certificates, factory
inspection reports, site T&C test reports, org.
chart and work programme (Gantt Chart) for all
equipment and related system, complete with
RE certification.

PROGRAMMES. DRAWINGS AND


DOCUMENTS

E Allow cost for preparation and submission of L.S


As-Built Drawings to the requirement of Air
Selangor. All as-built drawings shall be certified
and duty stamped by PE prior to submission.
It shall be in:
i) Complete true scale in AutoCad and PDF format
ii) Two (2) sets of Al size paper.
iii) Three (3) sets of A3 size paper with hard
cover binding.
iv) Four (4) sets in CD/DVD for drawings in
AutoCad (dwg) and pdf format.

Page Total Carried to Summary of Section A

EIQ-A/3
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANTITIES

SECTION A - GENERAL AND PRELIMINARIES

Rate Amount
Item Description Unit Quantity
(RM) (RM)

HEALTH, SAFETY AND ENVIRONMENT


PRECAUTIONS

The Contractor shall provide and maintain all


necessary protective and safety helmets, rubber
boots, safety shoes, and standard colour T-shirt
for a[l site staffs and workers to be worn at all
time throughout the construction period.

A Allow cost for complying with all Health, Safety and L.S
Environment precaution for the Works, inc(uding
provision for all necessary equipment, material
and labour in compliance with all the Health,
Safety, Security and Environment requirements
including :
a) To attend safety briefing at Air Selangor HQ
(unit H&S).

b) To acquire "safety card" from unit H&S


Air Selangor.

c) Other health, safety and security


requirements.

B Al1ow cost for provision of Safety Vest (to be L.S


purchased from Air Selangor) for each site staff
and to be worn at all time throughout the
construction period.

MISCELLANEOUS

c Allow cost for concrete trial mixed and cube L.S


tests.

D Ailow cost for tensile and chemical composition L.S


tests for each size of high tensile bars to be used in
the construction.

Page Total Carried to Summary of Section A

BQ-A/4
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCKWTP

BILL OF QUANTITES

PART A - GENERAL AND PRELIMINARIES

Description Amount (RM)

SUMMARY OF SECTION A

From Page No. BQ-A/1 .................................................

From Page No. BQ-A/2.................................................

From Page No. BQ-A/3...........,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

From Page No. BQ-A/4.....,,,,,,,,,,,,,,,,.,....,,,,,,,,,,,,,,,,,,,,,,

Tota} Camed to Grand Summary

BQ-A/5
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANT)TIES

PART B - PILING WORKS

Rate Amount
Item Description Unit Qty
(RM) (RM)

SHEET PILING

A Mobilize and demobilize all sheet pile equipment and L.S


all necessary personnel, stores and material; setting
out and moving to each and every sheet pite position
at each [ocaUon and dismantling on completion.
Rate to inc)ude for al1 supervision and the provision of
sheet pi]e equipment.

B Supply and drive interlocking sheet piles, complete m2 i ,775


with H-Shape beam with section modulus 2610cms/m
and estimated length 9-15 m as shown in drawing
no.: HLA18/9481/7VVTP/OT4(2)/C&S/002.
Rate include all necessary pre-bore, cutting,
jointing and welding to proposed level.

c Supply and lay 4 No. T32mm dia x 20m !ong hot No. 120
dipped galvanised soil nail with galvanised nut
complete with 4 nos. 12mm diameter M.S bolts
including drilled hole 1 00mm diameter size through
Grade 30 non-shrink grout.

D Supply 250mm x 250mm x 25mm thick m.s plate and kg 3,000


fixed to sheet pile (measured separately) including all
necessary fixing accessories

E Supply 250mm x 200mm x 25mm thick M.S plate and kg 3,000


Fixed to C-Channel (measured separately) inc[uding
all necessary fixing accessories

F Supply 230mm x 90mm x 8.5mm thick kg 8,700


M.S. C-Channel fixed to M.S. plate (measured
separately) including all necessary fixing accessories

G Supply 230mm x 90mm x 8.5mm thick m.s Double kg 1,700


Channel fixed to M.S. plate (measured separately)
including all necessary fixing accessories

H To construct 500mm x 500mm capping beam rna 35


constructed of reinforced concrete Grade 30
including 8 nos. T12 mild steel reinforcement as
main bar and T1 0 mild steel bar reinforcement at
250c/c as binder and all necessary formwork

J To construct 400mm x 250mm x 390mm concrete No. 120


Grade 30 as described head cap

K To dril! 50mm diameter weepholes through sheet pi1e No. 80


as drain channel

Total Carried to Summary

BQ-B/1
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANTITIES

PART B-PILING WORKS

Rate Amount
Item Description Unit Qty
(RM) (RM)

SHEET PILING (cont'd)

A Supply, lay, grade and compact 10mm-20mm ms 50

aggregate material in layers to proposed formation


level in embankments and other fill area as directed
by C.A

B Carry out pull out test to 1.5 times of working load on No. 2
soil nai1

I
I

Total Carried to Summary

BQ-B/2
SLOPE IMPROVEMENT AND OTHER ASSOCIATED WORKS AT NORTH HUMMOCK WTP

BILLS OF QUANTITIES

PART B - PILING WORKS

Amount
Description
(RM)

SUMMARY

From Page No. BQ-B/1...................................................,,.,...........

From Page No. BQ-B/2...................................................................

Total Carried To Grand Summary

BQ-B/3
SELANCOR

PENGURUSAN AIR SELANGOR SDN Ba-10


(lOa2;%4)

SECTION C.13
SCHEDULE OF DAYWORK RATES
SCHEDULE OF DAYWORK RATES

TABLE OF CONTENTS

Description Page No.

Preambles

Schedule A Labour SORlAli


Schedule B Material SORIBl1 - SOR1B15
Schedule C Plant & Machineries SORICII - SORICl3
SCHEDULE OF DAYWORK RATES

PREAMBLES

Schedule of Dayworks:

In the event of any work in connection with the Works being required to be executed as Day works, it
shall be paid for at rates stated herewith. They shall only be used as a basis for payment when normal
rates are not applicable and must be ordered in writing by the Contract Administrator (C.A.)

Rates:

The day work rates inserted shall be all-in-rates and shall include wages contributions to Employees
Provident Fund (EPF), bonuses, expenses, travelling expenses and subsistence, use of ordinary plant
and tools and their maintenances, scaffolding, fencing, water, power, fuel, watching, )ighting,
supervision, overall establishment charges, all insurances and allowances and Contractor's profit.

Only time on work actually done shall be allowed. A day is considered to be working day of 8 hours.
Fractions of a day wi]l be paid for pro-rata. The time of gangers, working with their gangs is to be paid
for by the appropriate items, but the time of foreman (or leading hands and charge hands) and working
gangers is not to be included.

C1aimsfor payment must be accompanied by time sheets and materials and goods vouchers endorsed
by the C.A. Such endorsement shall not bind the C.A. to value the works as Day work. ff required,
Contractor shall also produce his receipted bills, invoices, wages book and any other evidence in
support of his claims. Where special mechanical plant (not stated in the list) is required for use on Day
work, the cost to be paid to the Contractor shall be subjected to agreement by the C.A.

Rates for power driven tools are not included in the labour rates, but charges for hand tools shall be
deemed to be included.

Tenderer's Signature
SCHEDULE A

SCHEDULE OF DAYWORK RATES FOR LABOUR

Rate
Item No. Description Unit
(RM)

1. General Labourer Man/day

2. Truck/1orry driver Man/day I

3. Plant operator or driver Man/day

4. Ganger (or charge hand) Man/day

5. Bricklayer Man/day

6. Carpenter ManJday

7. Concretor/mason Man/day

8. Drain layer (or jointer) Man!day

9. Fitter Man/day

10. Pneumatic drilier Man/day '

11. Metal worker Man/day

12. Painter Man/day

13. Pipe layer (or jointer) Man/day

14. Plasterer ' Man/day

15. Steel fixer (or bar bender) Man/day

16. Welder Man/day

17. Semi-skilted labourer , Man/day

18. Electrica1Foreman Man/day

19. Electrician Man/day

20. Electrician's Assistant Man/day

Tenderer's Signature Date

SORIAI 1
SCHEDULE B

SCHEDULr: OF RATES FOR COMMON MATERIALS


Item Rate
Description Llnit
No, (RM)

1. Bricks Pcs.

2. Crushed stone for roads (113

3. Cement, ordinary Portland Bag/50kg

4. Cement, high a!umina Bag/50kg

5. Sand for pipe surround m3

6. Bitumen kg

Coarse Graded Aggregate for Concrete I

7. 38mm m'

8. "19mm m3

9. Fine graded aggregate for concrete (43

10. C)ass X material (Pipe) B3

11. Class Y material (Pipe) m3

12. Rip-rap material (B3

13. Class P material (1')3

14. MS reinforcing bars, straight and cut to length Tonne

i5. High tensile reinforcement bars, straight and cut length Tonne

16. Timber (soft wood) (H3

17. Timber (hard wood) la73

Welding Rod (electrode)

18. 6 gauge Kg

19. 8 gauge Kg

Tenderer's Signature Date

SORIBI 2
SCHEDULE B

SCHEDULE OF RATES FOR PIPEWORK (COLD WATER)

Pipework : The rates below shall be for supply and install complete per metre run including pipe fitting, joint
connections to main pipe, brackets and other accessories:-

NominaJ Copper ABS Ductile Iron Mild Steel Stainless Steel


Pipe Size BS 2871 AS 3518 Cement Lined
(mm) Table 'X' BS 534
(RM) (RM) (RM) (RM) (RM)
15

20

25

32

40

50

65

80

100

125

150

200

225

250

Tenderer's Signature Date

SORIBI2
SCHEDULE B

SCHEDULE OF RATES FOR VALVES

Valves : The rates below shall be for suppiy and instaii compiete per number of valves inclusive of bolts,
nuts, gaskets etc.

Size Gate Globe Check Sluice


(mm) (RM) (RM) (RM) ' (RM)
PN 16 PN 25 PN 16 PN 25 PN 16 PN 25 PN 16 PN 25

15

20

25

32

40

50

65

100

125

150

200

225

250

Tenderer's Signature Date

SORIBI2
SCHEDULE B

SCHEDULE OF RATES FOR VALVES (cont'd)

Valves : The rates below shall be for supply and install complete per number of valves inclusive of bolts,
nuts, gaskets etc.

Pressure
Size Flexible Joints Strainer
Reducing
(mm) (RM) (RM)
(RM)
PN 16 PN 25 PN 16 PN 25
15

20

25

32

40

50

65

100

125

150

200

225

250

Tenderer's Signature Date

SORIBI 2
SCHEDULE B

SCHEDULE OF RATES FOR CABLING

The rates below shall be for the supply and installation per metre-run PVC, copper, cables and shal[
include a[l earthing conductors.

PVC in Underground
Cable Size
Conduit/Trunking PVC/SWA/PVC
(mm2)
(RM) (RM)

j X 1C/15 mm2

5 X 2C/'1.5 mm2

5 X 4C/1.5 mm2

1 X 1C/2.5 mm2

1 X2C/2.5 mm2

1 X 4C/2.5 mm2

1 X1C/4 mm2

5 X 2C/4 mm2

1 X 4C/4 mm2

4 X 1C/6 mm2

'1X 2C/6 mm2

"I X 4C/6 mm2

1 X tC/'10 mm2

1 XIC/16 mm2

Tenderer's Signature Date

SORIBI2
SCHEDULE C

SCHEDULE OF DAYWORK RATES FOR PLANT & MACHINERIES

Item Rate
Description Unit
No, (RM)

1. Compressor, portable, with breakers, rock drills, Hour


spades air lines, lubricators and steels:

2. 3 m3/min and up to and including 9 m"/min Hour

3. Over 6 m/min and up to and inc[uding 9 m3/min


Hour

Mobile Cranes

4. 5 tonnes Day

5. 10 tonnes Day

6. 15 tonnes Day

7. 20 tonnes Day

Dumper, Petrol or Diesel

8. Up to and including 2m3 Day

9. Over 2 m3and including 5m3 Day

I
Excavator for Shovels, Skimmers, Drag)ines or
Back-hoe

10. Up to and including "lm3 Day

it. Overfm3 and up to and including 2m3 Day

12. Over 2m3 and up to and including 5m3 Day

Tenderer's Signature Date

SORICII
SCHEDULE C

SCHEDULE OF DAYWORK RATES FOR PLANT & MACHINERIES (cont'd)

Item Rate
Description Unit
I No. (RM)
I
I

Generating Set

13. Up to and including to kW Day

14. Over 10 kW up to and including 60 k Day

15. Over 60 kW Day

I
Lorry Tipper

16. Up to and including 3 tonnes Trip

17. Over 3 tonnes up to and including 6 tonnes Trip

18. Over 6 tonnes up to and including 10 tonnes Trip

19. Over 10 tonnes up to and including 15 tonnes Trip

Concrete Mixer
I

20. 10/7 Day

21. i4/10 Day

22. 21/14 Day

Pump, Portable including Hoses, Strainer, etc

23. 100mm Day

24. 150mm Day

25. 200mm Day

26. 250mm Day

Tenderer's Signature Date

SORICI 2
SCHEDULE C

SCHEDULE OF DAYWORK RATES FOR PLANT & MACHINERIES (cont'd)

Item Rate
Description Unit
No. (RM)

Mechanical Rammer

27. Up to and including 5 tonnes static weight Day

28. Over5 tonnes up to including 10 tonnes static weight Day

29. Tractors including Bul( orAngle Dozer Day

30. Up to and including 37 kW (draw-bar) Day

31. Over 37 kW up to and including 67 kW Day

32. Over 67 kW up to and including 100 kW Day

33. OverlOOkW Day

Welding and Cutting Set

34. Oxy-acetylene Hour

35. Electric, 300 Amp Hour

Vibrator, Concrete Immersion Type

36. Light Hour

37. Heavy Hour

38. The Tenderer shall state below the rates for use on
Day works of other plant he expects to have available
on site:

a)

b)

c)

Tenderer's Signature Date

SORICI 3
SELANC;OR

PENGURUSAt4 AlRSELAt4C30RSDN BHD

SECTION C.14
SCHEDULE OF PARTICULARS
SCHEDULE OF PARTICULARS

TABLE OF CONTENTS

Description Page No.

Declaration SOP/I

Schedule A1 Contractor's Background Constructional SCH-Al/i


Plant

Schedule A2 Contractor's Background Workforce SCH-A2/1

SOP-TOC-1
SCHEDULE OF PARTICULARS

DECLARATION

We, the undersigned, hereby declare that the particulars given by us in this
Schedule shall be binding on us and will not be varied in any respect except as
provided for under the terms of the Contract. We further agree that the approval
or otherwise by the C.A. of any of the said particulars shall in no way relieve us of
any of our obligations and responsibilities under the Contract.

Signature and Official Stamp of Tenderer Date

Notes on Particulars of plant and equipment

The Contractor shall complete all schedules for items of plant included in the
works and shall sign all the schedules. If an item of plant will not be included in
the works, Contractors sha(l enter "Not inciuded".

The Contractor shal! complete the whole Schedule for the basic tender, if the
Contractor offers an alternative for any section or part-section, he shall also
submit the reievant parts of the Schedule for the alternative plant offered.

If insufficient space is provided in any schedule for the tenderer to complete the
information to be provided, the tenderer shall add his own continuation sheets to
the schedule.

SOP/1
SCHEDULE AI

CONTRACTOR'S BACKGROUND
CONSTRUCTJONAL PLANT

Tenderers shall enter hereunder a brief description of the plant which they propose to
use in order to construct and complete the Works in accordance with the
Specification.

, i
--' 4, __'"iii;"_,,; .-;,.a ;,-" --ii_-a( = a..; Y,_(, - <, _7'i.l-.i !, ;_il 1 li-i II: -=. i_' -. .! ____l'i: -, -_i.-, a;:-!" -
_
I
I
-a'l,_

z
l_
- _ A

-1, _
I
-AJ4:1$&)4i
i

,-, ,.
_
KU_1L
- a
t'J'j4fl,1-
r i-iii _i_i i. , _ _ _ --_ _ i - :. 3 -, _-
%)(lLC'fa-}
4

-_ i_- -i ,-,
VNVlk'l:CeJ@tf _l rJC
, a+_ +i i , H i'i,i3 4_ii i_ry_ i i i -., , i . ffi-_
N C-,%-it'-llax,ill,,)Jll,l.a:-Lla;:1,I_(
___i'- li _ _ 4;:Th b ' J-{i;_, iiii "i! trii ,:l ,,:- ,,",;@,i;;ii;it:i;fi!lii':i4i:'i'
- i"ti
.€iaiR..,i';ip,'.":"':'a'jfiaar':'-ai:j:'j"""ii'j:""'l:i':'ff"'ij"'7
'. i:.4+a;;E.
ii)l!.!10

,,<.ffq;ofymk,iffi:,tp@?!4c::,i",-i

-,,'
:7-aa}a

,,:-:t%k::@i@a@;$,%i,5r0%f:.:
I.d.::.

'iiM tJ)j:r'
I i!f+l

5-:§'aY4J?'@'t5"'%
.;;:*ffffi:55ff@@E&
:'i;'jta';;ujaa'\jae"'#_" l ;l-.:i ii :i; i........ _ _. _ _, .,

I
I

Tenderer's Signature: Date:

SCH-Al/1
SCHEDULE A2
CONTRACTOR'S BACKGROUND
WORKFORCE

Tenderers shall enter below the totaI number of each class or workers whom he proposes

'ii ji::
,illii .: ir,j ji:',ji IN:ilYili)
ip..3iq. li2 q:ii:i.ai:".i"I.."ii
,;j-l:fLiia.lliii.§, 11,f,i7, ;
iliiii'll i l' jja';ii'
:;llla. 7ii': i(iiai
"i::'t" -.1!'f! ,,,l,l.,.i lit,
1, ,i. .i.
ai ;I
I;,
:... r,i,,,t
,..:l:::(l;1. '11!!fi Fi3 i.,'
)l'Ai-(,If ;l 'il -4

gild i gi.,i:ii.
.Qi;f.
:;'11!i iit)!i ilEla,
j.,i5.,l'a,3,
I iillil';:lag(11:131:41111'
Ill,
j'ij !
jil, ;'1,== i!'i

'fm,ffl;'.
gffl:\'5ffliiiii
:iljj}) i
piN:
:I# _l
Ij;!1%::-l:.,
%
%f! i8@
) illlp'7. qi
-ali'ff
'!i.l'l
f/fi,§8,1 .i;'i:9arl
qlll"j.%;;II"
,lia;II,,.1..
pg':09 91 tB11:
gfi0% ';'iGiQ:!ffi :i;9 ii41 up,ye 10i
[1ii 50 .iiili i,i,i,'iV,,:i i:; ';17jl 'l"i'0
"i'il 10 m .l €
ia., ::. IJ
!1.111,f :3[i,1[lM=' q.....ii
i-..i.l iii:l
liij il,i,
f:!!
iffL'l':r :'ijl
i ;jj))a";'
ni;;'i; Ii'p.l.
,..'ii
jif IF,,:i, l...
i., :ij,ii.ii Pll, :i= ({ i ;-L-i r r,,= l-a-i
! il ', ;" : : '.;: !."
:l'-'l f:{*!'fi!tl
:ti:'aiai'i :4:4':)'if
i6
"'lliilFi II-%iiipil-'a 'i)!i
:ffl{i.[
p!i
'i!4-'S-1' ';'-i§i ,;; ! i:r.i:;fl<: ai:l
:)ii ;;74;)(14iiiii ==) ,lif),ij:. .%
,l' , !,:l 'i!l
iii-ii-lql ':.
i.1
I '4 -i :fi
I :5.

iiHiiii:I ..l{ii..a,
la'at:-+;
: iliipijjjj; ,iil
i'ilii lily!11b'
-.- ..l..
,';,'j(r :.
:i. gr,#q4 j'4i It'niair:,i:i'li:11;ii ;i!iii:'inn! Eiii
i'i;ii('ili
:..1:41111', 84 'jJii :ilI:0y@;<Q
i8ii.i 'i. f')i
t:i:ffiii:::ii.a.iiiia.:;i.,i
,., , .,.;;1;u.'-iilia:',i'i" ,;iii0,,'iii' i"'-'i""'!ai'!'i:':'-i=-1-l
iai.,lai
'.:ii!jl li"'ffl'-'
',i+iiij :ii
.m di iJi'iliti
;1
O'0pa ji4@,i
.li.lli
:ii:ii:i*4J
!lla.li iiiii
!.li
lii.

'ilWiii n
::lq.12;p: .a+l 40,,04,."j.i::'ar:II"t:';11:':"lla""!"'.ll""51'i.lla"'i.""iiilaa",:11""l.,""'l
*ipi:+g!:
il:i:. -' 'l!..i.
:'ii:ili
'4"i i'.:l"J!.:'a al Ill,J,z.,
ii+iii
lid!:.
,-1 ;.: :l i.,"!F,=,,i iai .!,,,.,
0=;aI.-! -; 4,a:iii
-"= .'. al., .i;i
4-i':
.+ i l- ' a
:!!i!!..iiiliil 'l;l!l':".
-:'illilT
1,1;'.,4 i:ll'--=
u'i
i,;, ia,,
I;:,i;.I,i,l,l(ii',
l.il!

i:!046:ig t'jij!of'::':":'ai
#='.i..,...' ._= -al:i i}-jl}ai iii0
.:: "i":11:j:"ji"":'j'+'a:"i""
il.
':'i
i' 10 =

i'i :ii"l ..."aaar


i
% -- il
i:,,. iji',4
; ,":. i(i
' iii.lilli.'_"i.j. Bi.r:.'.1i-+..
'i.'il'p.'ii71l:ij. ll+i'
;;,;
h'i i!lltl+It' :' d.t! l'i'Fffi'i)'!)i' II i!l);l{ iil :l.:.,
"K'i"""'j jiil'l31,';;li'l:l iai+ll !. i!!'lli "ii'l iiiilii:i;j
ii, l,;,ii,
i(.(g.
--._.l
'jam"::':":' :j...l' ... I

7 .i:klii.::i
:i 'i;ai {!i :i-'
1.1 .+lii!l:i
i';l
I+'ii=itl
Kiii;:f'ia:a"i"i'i':iaa'l...::";.."""l";:':11
:..1
1.
..i.,!-,.
%.
.1,...i. i.Ellll,la i. ,11';l:ill-i:,
i.i.ll:..i.i:i..;.i. i0e§' I! I; 'r l.';ii.y:lil:k!il,'(
i,'i..
lii-ii.
jllla.,ili.+':. ...t.
'=..ll"i '}=
.,7.. i.l:.:,;a i,i;a=..t liil'.-al
'i"'l-
" ' 4:!iii- L i" il+ia
:.

il
-=
:i0',i',lii
li'if r,li:li.at
iT:;l::,illi.l: fi.i,liii
;10,i.
I I' I I -01I
:il";l!"'i:g'!
"ii'
li :
i'" " " ' iiiiIfF:" l''i:;'l :a:i%"if:'i":'
::i"if
llr'_j.!'
i'!: :'i;1:7
..-.l'i-li i,f'.....l'f,')l.a"l.'
" -"
:,lii':7i,'i'tl"'1
" " I " " tl!f
iiiii :;a,!,i iiili it,
;; I+i+ii': iil iE ;ill,' : iii

Month I
Month 2
Month 3
Month 4
Month 5
Month 6
Month 7
Month 8
Month 9
Month 10
Month 41
Month I2

" Average daily number of each class of wo.-ks.