Professional Documents
Culture Documents
Bill of Materials: 2 Beam Required As Drawn Marked-B4
Bill of Materials: 2 Beam Required As Drawn Marked-B4
Bill of Materials: 2 Beam Required As Drawn Marked-B4
20 A325M Site 60 8 C2
F1
F1
F19
50
M36
80
50
4178 16
35 4159
F19
B
A
69
60
90 90 90
111 110 110
60
F1 A
F1
B
145 60 40
50 80 50
371
76 100 100 94
90
60
47 65
90
FOR INFORMATION
100
TYP F1 6 - 22 ø HOLES
8 APPROVED
90
100
60
APPROVED WITH COMMENTS
155
155
NOT APPROVED (RE-SUBMIT)
90
241
30
REVIEWED
141
65
65
F1
70
REVIEWED WITH COMMENTS
NOT BE RETURNED
21
21
8 3SIDE TYP F19 RETURN DATE
8 21 329 21
B-B
A-A PROJECT ORGINATOR
RECEIVED DATE
NEILSMITH BUILDSYS
4178 390
35 4143 F19 60
50 90 90 90 60
CLIENT
50
KRISHNA BUNK
DESIGNER
PRIME STEEL ENGINEERING
NO 978, SECTOR-4, KOPARKHAIRNE,
Navi Mumbai - 400709
WEB: WWW.PSENGG.CO.IN
CONTRACT
AGENCY
Shayona Drilling Engineers
MUMBAI - MAHARASTRA
A1
QTY= 2 IPE400
SHEET NO. 01 OF 01
- 0
841 mm x 594 mm B4