PROJECT DESCRIPTION DETAILS

EXECUTIVE SUMMARY

1 - Name of Project
2 - Location of Project
3 - Objectives of Project
4 - Use of Project Structure (Residential, commercial, institutional, etc.)
5 - Function of Project
6 - Theme of Project, if any (Contemporary, Asian, Mediterranean, etc.)
7 - Budget of Project
8 - Size of Project Lot (Location/Site Plan)
9 - Vicinity Map of Project
10 - Topography of Project Site (Flat, Upslope, Downslope, Rolling, near sea, etc.)
11 - Spatial Areas of the Project

GROUND FLOOR (1274 sq mts GFA + 64.47 sq mts for utility areas)

-Lobby and Reception


-Elevator and stairs
-Multi Purpose Area (166 sq. mts)
-Commercial Area (246 sq mts)
-Parking area
-Utility Room (for gen set)
-Material recovery facility
-Space for STP

2ND -11TH FLOOR (Typical Floor Plan)


-52 Dorm Units (at 19.6 sq mtr each)
-Hallway
-Electrical Room
-Stairs and Elevator

12 - Allotment of Areas for Buildings (Percentage for structures, percentage of


residential against commercial, roads, open spaces, landscapinggarde
13 - Demographic Statistics of Project (Number of Users, population, etc.)
14 - Special Amenities Required (Recreational or Sports facilities, chapel, etc.)
Re-alignment of rent appropriations to capital outlay/infra, financial
mechanism, short-cut administrative orderw
funtil a number of years to be proponents hopes to paid from the
securitization of the rentals of the Senate for the next fourteen(14)
years which can cover design and construction costs. Funding for the
project will be a bank loan. The project budget is about One Billion Pesos
(P 1,000,000,000.00).